ML20210U555
| ML20210U555 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/25/1997 |
| From: | Querio R, Tamlyn T NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20210U355 | List:
|
| References | |
| CK-MP3-06-12, CK-MP3-6-12, NUDOCS 9709190232 | |
| Download: ML20210U555 (3) | |
Text
.
O Northeast Utilities Millstone - Unit 3
- 1 Independent Corrective Action Verification Program (ICAVP)
System Review Checklist CK-MP3-06-12, Rev.1 i
PRG Change Process Procedures Prepared by:
T. K. Tamlyn -
7/25/97 Name Sfgrature,
/'
Date.
Approved by:
R. E. Querio
/
7/25/97 Name
" Signature Date IMPLEMENTATION System:
Verified by:
Date:
Concurrence by:
Date:
O MP34-12. DOC.07"N9711:17 AM 9709190232 970917 Page 1 of PDR ADOCK 05000423 p
o O
O.
PRG Changa Pracass Procedurcs Checklist cn-ups-os-12. nev.o Sheet 2
Reference:
PI-MP3-06; Section: 5.5.4 Line No.
References Comments Close-Out
- 1. Change Processes (list from PI-MP3-04)
W ", *
- RE
&+%*
Sat iUnsat a.
b.
O O
OiO c.
d.
OiO O*O e.
f.
OiO OiO
- 2. Procedure Change items (list 1 or 2 for each of the above)
'N MMsee W3 "!W AsWWE
- +: ' i ed wm
~
a.
O!O b.
OiO OI O OiO c.
OiO O: O d.
O!O O!O e.
OiO O!O
_ f.
O!O OiO Note:
a) Use the appropriate checklist as described in PI-MP3-06, Section 5.5.8 to evaluate the above procedures for adequacy of the required changes.
b) Follow PI-MP3-06, Section 5.5.9 thru 5.5.16 to complete the evaluation and disposition of each item listed above.
c) Disposition each item by indicating the results in the Close-out column, above.
d) Notify the PRG Lead of the results by providing a completed copy of this checklist.
Page or
lIIj
\\\\Jl
~
o.
3 On a
e t
e h
1.S r
1 o
s o
-3pu-e n
ga c
P t:
i i
kce h
f C
o 1
sc e
t r
g n
u a
e d
P e
m c
n c
o m
OP r
it o
a s
u C
s n
i t
c n
o o
r C
P t
3 n
g e
n m
a h
m C
o C
GRP D
O
.o N
en iL l