ML20210U485
| ML20210U485 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/25/1997 |
| From: | Querio R, Tamlyn T NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20210U355 | List:
|
| References | |
| CK-MP3-06-02, CK-MP3-6-2, NUDOCS 9709190198 | |
| Download: ML20210U485 (4) | |
Text
t O
Nonheast Utilities Millstone - Unit 3 Independent Corrective Action Verification Program (ICAVP) 1 System Review Checklist CK MP3 06-02, Rev.1 Bases /Channe Features
}
Prepared by:
T. K. Tamlyn -
O
-4 7/25/97 Name
%nat
/'
Date Approved by:
R. E. Querio
.,e,e.e 4S 7/25/97 Name 3iglia'ture Date IMPLEMENTATION System:
Verified by:
Date:
Concurrence by:
Date:
AIP34 02 DOC 07789711:27 AAl 9709190198 970917 Page 1 Of PDR ADOCK 05000423 P
o O
O~~
Bases / Change Features Checklist cn-ups-es-az. ner.1 Sheet 2
Reference:
PI-MP3-06; Sections: 5.4.3 a Line No.
Walkdown Comments Procedure Appropriate?
- 1. Requirement Yes i No u+
9.w i 4
- - Ns
^
I a)
OiO b)
O! O c)
O! O d)
O! O
- 2. Requirement:
r !*
A
~
- - #L g;;
a)
O!O i
b)
OiO c)
O !. O d)
OiO
- 3. Requirement s i n; m
a.4 2
+
. ~,
a)
OiO b)
O!O c)
OiO d)
OiO
- 4. Requirement:
<W miw we
+-
u a)
OiO b)
OI O c)
O! O d)
OiO
- 5. Requirement:
-w t i V
+
- 2 1
~~
a)
O! O b)
OiO c)
O! O d)
OI O Note: List Requirements and the associated References from the ICAVP Millstone database. Identify if a walkdown is apfnviniate for each reference listed.
Pare of
g'd 9
o--
Bases / Change Fe~atures Checklist cn-ups-os-oz. ner.s Sheet 3 Change item:
CK-MP3-06-02 PRG ltem:
Reference:
PI-MP3-06; Sections:,5.5.8 a Line No.
Procedure Procedure Walkdown Comments Section Appropriate?
- 1. FSAR Section:
Yes No a.
O? O b.
O! O c.
O: O d.
- 2. Technical Specification Section:
~
OiO
-l a.
O O
b.
O5 0 c.
OiO d.
OiO
- 3. Inservice Test Procram:
r.
a OiO b.
O O
- 4. Maintenance Rule:
I a.
O! O b.
O! O
- 5. Station Blackout Rule:
a.
O! O b.
OI O
- 6. Fire Protection:
~
t in.
a.
OiO b.
O! O
- 7. Other-
~
c
<vw
- i:J a.
OiO b.
OiO c.
OiO Note: List the appropriate procedures and specific procedure sections for each feature listed in the first column. Use the comment column or additional comment pages if needed for additional procedures. Identify if a walkdown is appropnate.
Pa::e or
-__________-_A
I Olji s
5 E
1 5
o I8 WI rr O
O i
8 I
-