ML20210U348

From kanterella
Jump to navigation Jump to search
Forwards Documents Revised for NRC Approval Re Discussions Held Between NRC Staff & Sargent & Lundy ICAVP Team for Specific Details of Review Process.Documents Distributed in Accordance W/Communications Protocol,PI-MP3-01
ML20210U348
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/17/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210U355 List:
References
9583-100, NUDOCS 9709190117
Download: ML20210U348 (2)


Text

-

9,(S%ff r,. $k

.s (n\ K 2.x

~

P- '

,:p -

Sarger$ d.Lundy * ' c

[f,' ,n .;..)

&<l R. , .e r. p n

Don K. Schopfer Vee President 312-259 6078

}2 thN ~..

n y. m 7'. j. . Wi )

September 17,1997 j:g!;p Project No. 9583100 lgg he Docket No. 50-423

$W]

y & 8w i,- @$.'.l.O

& eq i Nonheast Nuclear Energy Company M,M H Millstone Nuclear Power Station, Unit No. 3 5:A Independent Corrective Action Verification Program d'd United States Nuclear Regulatory Commission name p

Attention: Document Control Desk M Washington, D.C. 20555 During the last several weeks a number of discussions were held between the NRC staff p

and the Sargent & Lundy ICAVP Team regarding specific details of the review process. ,

These discussions resulted in some changes to the Project Manual (Audit Plan, Project Instructions and associated checklists).

Enclosed for the NRC approval are the folle ving documents which have been revised. ~

These documents are being distributed in accordance with the Communications Protocol, -g PI MP3-01. -

='

Audit Plan, Rev. 4 PI-MP3-02, Rev. 4 PI-MP3-03, Rev. 2 PI-MP3-04, Rev. 3 PI-MP3-06, Rev. 2 g(/

PI-MP3-09, Rev. 2 L, hM [

R;  ; riyl PI-MP3-11, Rev. 4

, p p CK-MP3-02-5.1, Rev. i -

r CK-MP3-03-02, Rev. 3 CK-MP3-03-10, Rev.1

[k'O j _

, h b l

CK-MP3-03-11, Rev. 3 I ]

CK-MP3-06-00, Rev. 2 CK-MP3-06-01, Rev.1 gy@fh 9g g

CK-MP3-06-02, Rev. I h\,\${\$\\0\f$\,\bkk!i! h 9709190117 970917  ;

PDR ADOCK 05000423 P PDR p 01,

.l. b O l' ] ) 55 East Montce Street Chicago. IL 60603-5780 USA 312-269-2000

P United States Nuclear Regulatory Commission September 17,1997 Document Control Desk Project No. 9583-100 Page 2 CK-h1P3 06-03, Rev. 2 CK-MP3-06-04, Rev.1 CK-MP3-06-05, Rev.1 CK-hip 3-06-06, Rev.1 CK-hfP3-06-07, Rev.1 CK-MP3-06-08 Rev. I CK-MP3-06-09, Rev.1 CK-MP3-06-10, Rev.1 CK-hfP3-06-11, Rev. 2 CK-MP3-06-12, Rev.1 CK-MP3-06-13, Rev. 2 CK-MP3-06-14, Rev. 2 CK-MP3-06-15, Rev.1 CK-MP3-06-16, Rev.1

. CK-MP3-06-17, Rev. I

) CK-MP3-06-18, Rev.1 i

I have also enclosed the resumes and conflict ofinterest statements for newly added staff.

Please direct any questions to me at (312) 269-6078.

Yours very truly, v

,Y,jlA_ _

D. K. Schopfer \

Vice President and ICAVP Manager DKS:spr Enclosures Copies:

E. Imbro (1/4) Deputy Director, ICAVP Oversight T. Concannon (1/2) Nuclear Energy Advisory Council J. Fougere (1/3) NU B. A. Erler (1/0) Sargent & Lundy maicavpwwn97\nr0917 c. doc

s 4

AN\

Sar gentN Lundy c W )s

! Don K. Schopfer

"./

Vice President 312-269-6078 September 17,1997 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Energy Company Millstone Nuclear Power Station, Unit No. 3

Independent Corrective Action Verificatica Program United States Nuclear Regulatory Commission Attention
Document Control Desk i Washington, D.C. 20555 1

i During the last several weeks a number of discussions were held between the NRC staff

and the Sargent & Lundy ICAVP Team regarding specific details of the review process.

These discussions resulted in some changes to the Project Manual (Audit Plan, Project Instructions and associated checklists).

Enclosed for the NRC approval are the following documents which have been revised.

These documents are being distributed in accordance with the Communications Protocol,

. PI-MP3-01.

4 Audit Plan, Rev. 4 PI-MP3-02, Rev. 4 PI-MP3-03, Rev. 2

, PI-MP3-04, Rev. 3 PI-MP3-06, Rev. 2 PI-MP3-09, Rev. 2 PI-MP3-11, Rev. 4 CK-MP3-02-5.1, Rev.1 CK-MP3-03-02, Rev. 3 CK-MP3-03-10, Rev.1 CK-MP3-03-11, Rev. 3 CK-MP3-06-00, Rev. 2 CK-MP3-06-01, Rev.1 CK-MP3-06-02, Rev.1

55 East Monroe Street
  • Chicago, IL 60603 5780 USA
  • 312 269-2000 q:;t;sa cg;2g>

-.._m.. _ . . . _ _ _

d United States Nuclear Regulatory Commission September 17, IP97 Document Control Desk Project No. 9583-100 Psge 2 CK-MP3-06-03, Rev. 2 CK-MP3-06-04, Rev.1 CK MP3-06-05, Rev.1 CK MP3-06-06, Rev.1 CK-MP3-06-07, Rev.1 CK MP3-06-08, Rev.1 CK-MP3-06-09, Rev.1 CK-MP3-06-10, Rev.1 CK-MP3-06-11, Rev. 2 CK-MP3-06-12, Rev.1 CK-MP3-06-13 Rev. 2 CK-MP3-06-14, Rev. 2 CK-MP3-06-15, Rev. i.

CK-MP3-06-16, Rev.1 CK-MP3-06-17, Rev.1 CK-MP3-06-18, Rev.1 I have also enc!osed the resumes and conflict ofinterest statements for newly added staff.

Please direct any questions to me at (312) 269-6078, Yours very truly, S -

1T,,13 _ -

D. K. Schopfer \

Vice President and ICAVP Manager DKS:spr Enclosures

Copies:

! E. Imbro (1/4) Deputy Director, ICAVP 0 sight i T. Concannon (1/2) Nuclear Energy Advisoiy Council J. Fougere (1/3) NU B. A. Erler (1/0) Sargent & Lundy

] mmvpw7 o9174anc t

i

, . - . . __ -.