ML20209H555

From kanterella
Jump to navigation Jump to search
Annual Nonradiological Environ Operating Rept for 1986
ML20209H555
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/27/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8705040042
Download: ML20209H555 (3)


Text

-

PWER COMPANY M. FARLEY NUCLEAR PLANT - UNITS 1 & 2 NON-RADIOLOGICAL ENVIRONMENTM, OPERATING REPORT PERIOD ENDING DECEMBER 31, 1986 8705040042 PDR 861231ADOCK 05000348 PM R

Il$

'l;

y, so Joseph M. Farley Nuclear Plant Non-Radiological Annual Environmental Operating Report Period Ending December 31, 1986 Introduction his report is submitted pursuant .to subsection 5.4.1 of the Environmental Protection Plan (EPP); Appendix B for Units One and Two. We Annual Report summarizes the environmental surveillance program for the Joseph M. Farley Nuclear Plant for the reporting period of January 1 -

December 31, 1986.

Reporting Requirements he following is submitted in accordance with subsection 3.4.1 of the EPP:

1) EPP Noncompliances - here were no EPP noncompliances at the INP'during 1986.
2) Design Changes - %ere were no changes in station design or operation, tests, or experiments which involved a potentially significant unreviewed environmental issue during 1986.
3) Nonroutine Reports - here were no nonroutine reports submitted pursuant to subsection 5.4.2 of the EPP during 1986.

}

l v

A! bana Power Company 600 North 18th Strait Post Office Box 2641 Birmingham, Alabama 35291-0400 l Telephone 205 250-1835 R. P. Mcdonald Senior Vice President AlabamaIbwer the southem eiw.trc system April 27, 1987 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Report Gentlemen:

The attached " Annual Non-Radiological Environmental Operating Report" for the period January 1 - December 31, 1986 is transmitted in accordance with the Joseph M. Farley Nuclear Plant Units 1 and 2 Technical Specifications, Appendix B, Section 5.4.1.

If you have any questions, please advise.

Yours very ruly, R. P. Mcdonald RPM / JAM:emb Attachment cc: Dr. J. N. Grace (w/ attachment)

Mr. W. H. Bradford (w/ attachment)

Mr. L. B. Long (w/ attachment) '

Mr. E. A. Reeves (w/ attachment)

Director, Bureau of Radiological Health (w/ attachment)

State of Alabama Director, Environmental Protection Division (w/ attachment)

State of Georgia f\ l