ML20209H138

From kanterella
Jump to navigation Jump to search
Submits Pertinent Facts Re Facilities Simulator Project
ML20209H138
Person / Time
Site: Black Fox
Issue date: 05/18/1985
From: Raglin K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Gagliardo J, Grimes B, Protner L
NRC
Shared Package
ML20209H127 List:
References
FOIA-86-796 NUDOCS 8702050535
Download: ML20209H138 (5)


Text

-

o

~

CA 5/1E/25 MEM0 par 4DUM FOR:

Brian Grimes / Jim Ga;1 ardo/ Linea Fortner FRCM:

Ken Raglin

SUBJECT:

BLACK COX SIMULATOR P:CJECT UPDATE The following facts are pertinent to the Black Fox s i mu l'a t'or p*c oj e c t :

1.

The project has been through the SCRB with no problem whatsoever.

2.

The commission paper has been written by Levi Baisden of Contracts.

I reviewed the draft, with minor comment, on Wednesday 5/15/85. The smooth paper was to have been developed on Thursday or Fricay with the sign off proceedure started at that t ime (Con trac ts/IE/EDO).

Levi Baisden has been thanked for expediting the Phoenix contract.

I tried several times to contact Levi Baisden on Friday 5/17/85, but he was apparently in meetings all day.

Levi estimated that the paper should be signed off by the EDO during the week of 5/20/95, perhaps as early as Wednesday.

This is likely optimistic, but we.need to keep on top of the situation.

3.

The Phoenix Associates contract is proceeding smoothly.

I have met with since initial meeting at the Phoenix office. The Mark Birnbaum of Phoenix ony//28/85 /he site visit is confirmed for X/31/85.

I have arranged to have the right SE people on hand for the visit. Tom Averitt of GE (deliverer of the unsolicited proposal) will alsy be in Tulsa for a couple of the days. Mark Birnbaum and I will

,.- fly into Tulsa on 3(/28/85. The rough agenda for the site visit is attached.

4 I talked to Levi Baisden of Contracts and Lou Fisher of Admin. Building Ops. about the possibility of the Plan B option for space procurement (having GE develop the space, lease it from Osborne Enterprises, and sublease it to NRC).

'evi was not sure whether this option would be included as part, of the r'egular contra:t, be a separate contract, or what.

5.

We are already into Plan B mode. We have been told by our GSA contact (Gary Mote of their Atlanta region) that GSA is out of money. There is a free:e on GSA procurement of new space. This freeze is expected to last all year. Any request for additional space submitted to GSA will be tabled until the freeze is off. This has Deen confirmed by Lou Fisher of Acmi... Building Ops.

I t:!c Leu r Baisten on Wednesday that we had heard tnat tnere was a free:e, but I di:n't get

+

l confirmatien from Lou Fisher until Fricay and :suldn't get hold of Levi.

6.

I have talked to Tom overitt :f SE a:cu-the ;ctsioility of GE deuei::

the space anc providing i t as ;nr Of the Itase for an aeditional cost (Levi k r. :- !

~

this).

m 4.tri't his ::nti:ted the 3E management on tr s mitter, anc inste is 00po1#ti:n.

1

.J i l l ceve10D this icek weth Tem Averit-duair; the site oisit s mulatca.

te! eue ' st C-E w i t ? - ::ess
    • e aequi ed ir

+r n! 3 3; e wt-s :- -- -

citter su:r - i? :n + the 1:mulets

entra:-

1 awi O+: :: - tm, t r. t r i-

'?O4:!1* elf ! ! ;n * *; t :Or.t'1:t wit? 05 borne En ter?P i 5ts 150 h1Je 'ne 1;1:9 :* t: i" 4 :

in & tom tl y S hrt.f.

3.e:

a.--

": ; t + - :+::e-1 ire n : i s: it - v t-d det, 3

+

+

15. : It 9 : f ? I : t '< 04 57< :- * + 2 * ; 2 4

'*?

".: ? !!; :* t"! Ir

  • rt.-

tt:

4:.

411:1717.*.!.

3ht *it:

-.' i : - E*i l'

r t : r *. E I h a ' O r. : t t P. t C mmelis n E i"r*

B70205053S E70202 PDR FOIA AIROZOB6-796 PDR

s r +c :v :n e E' ~. J e :L F:e vill ca!* Walt ":Get a r.c 044er a cr a ta ta-4--

i:

4:--

t'
  • !!.f.n.!.

+n :e.: t:

+ i. - t r !": e4 sa:r a :- efi-r

. : :e ;e ve..

In tr.e ert eme!r t.r.1i*el t e v e r. t

  • r. a t s u :P. a :riedin; wcsic et
+. e4: :. ie ; t*e weev :f 5 ' 0/E5, I coule trear away from tr.e simuleter : curse :.
+,:t

.; 4c h: 1

  • e.se r ge nc y'.

In tr.e event that the Dr.ed ing was Ces e rtc :gr ing 4 T'*7.'5!, I ::cid break away f. om the Tulsa tr ip.

e sesy 0 I.

;:: :,e a;;t:*.et : cje:tec schec.le fer c:.tra:t. e sele:: e.t f r ex _e u i
51.. s :e n. -gseming we ceule get Con.n.issicn approval ey ateut ne week of June 3,
1!, -ne ::r-a:: s,oul d te

.n e4fe:t :;- a: sat (-ugust 1, 1985.

I :an se reached this week curing the cay by calling (216)-259-1757 and is the o fice cf Jim Griffin of GE (computer roce att,.; Jer Exter.sion !E0e.

nis e

a: t.e Ferry simitt ater).

I can be reached in the evenings at the Knights Inn at Mer.:sr, OH (216)-?52-8535.

J' lW Kenneth A. Raglin, Chief BWR Technology Branch, TTC G

e 4

e a

e I

y l

l I

._m._

4 TEfiTATIVE OUTLIriE FOR SITE V:5IT Si.uiator cc:umentation/sof tware.

A.

Inventory existing materials (what exists?).

5.

Is all One source coce/ documentation avaiTable for making changes later?

C.

Are there sof tware development tools such as Fo tran compiler, etc.?

D.

Design specifications for simulator.

E.

List of deliverables GE got from Singer Link.

F.

Where is the SEL system to develop the changes?

G..

ERIS documentation.

H.

GE dependence on Singer Link in last few years?

II.

Methods of accomplishing NRC desired simulator changes.

A.

Pre-delivers (CRT replacement and chart recorder upgrade) will be part-of contract.

B.

Future changes..

2. ~

1.

Scenario for request, negotiation, and implementation.

l l

2.

GE capabilities for making the changes.

l a.

GE in hour talent?

b f

b.

GE assistance from others?

C.

DOS CRT modifications / creation of new femats.

l 1.

Show or talk through creation of a new CRT fonnat using only computer parameters which already exists in the point dictic arye l

2.

Show or talk through creation of a new CRT format using some computer parameters which are not in the point dictionary.

D.

ERIS future modifications.

l 1.

Changing screen femats.

2.

Creating new screen forma s.

E.

.arcwa e ex:ar.sion li.itations.

1.

F. cre a: lity :: sene sim.'. ate cita : NF.~ c:e ations cer.:er.

2.

Fcture apility te sen: ERIS ca:a to NRC coerations cer.ter.

. 5'm;1ator r.ardware.

A.

Physical inventory of equipment.

B.

What will be cone to certify the simulator is operational in Chattanooga?

C.

Training aids.

D.

List of deliverables from Singer Link.

IV.

Maintenance.

A.

Procedure for remedy of small problems (Simulator Discrepancy Report).

B.

GE historical records of existing equipment.

C.

GE simulator maintenance procedures / testing procedures.

T.

V.

Simulator operation and use.

a.

Scheduling and accounting.

~

~

, B.

GE reporting obligations during use purchase agreement.

C.

GE on site engineer.

VI.

Other A.

Estimate on simulator lifetime.

B.

Estimate on simulator use to data.

C.

Cost of simulatore when new.

l L

o PROJECTED SCHEDULE FOR ACQUISITI0'l 0F THE GE:lERAL ELECTRIC BLACK. FOX SIMULATOR (SOLE SOURCE)

Af ter Connission Approval:

We!*. 1 - 5:

Issuance of the Commerce Business Daily flotice; Inspect. ion and Enforcement and Division of Contracts Complete Evaluation of the General Electric Proposal; Approval of the Requirement as a Sole Source Week 6:

fiegotiations with General Electric 4

Week 7:

Receipt of Revised Proposal from General Electric

...']

Week B:.

Preparation, Transmission and Execution of the Definitive tc.'

Contract y... ;

$-6

". '. '. _ ~

- '7 r

a.

l

+-

7

,.,,.,,,.. - - ~., -,,,.

,,,,-w

--