ML20147H692
ML20147H692 | |
Person / Time | |
---|---|
Site: | Black Fox |
Issue date: | 10/17/1978 |
From: | Davis L NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Purdom P, Shon F, Wolfe S Atomic Safety and Licensing Board Panel |
References | |
NUDOCS 7810270087 | |
Download: ML20147H692 (2) | |
Similar Documents at Black Fox | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20094K9541992-03-13013 March 1992
[Table view]Forwards Supplemental Info Addressing Reasons for Delays Which Have Occurred in Schedule for Const of fossil-fueled Electric Generating Facility at Inola Station Site ML20092M4001992-02-20020 February 1992 Submits Addresses for DM Saunders & Jg Aronson,Per Request in Connection w/920226 Meeting.Addresses for R Butkin & M Graham W/Ok State Government Also Listed ML20092K4941992-02-14014 February 1992 Confirms 920205 Telcon Requesting Meeting Between NRC & Util on 920226 for Util to Present Matl Re Status of Inola Station Site to Demonstrate That Owner Have Satisfied Conditions Contained in 830307 Order ML20209H1221987-02-0202 February 1987 Final Response to FOIA Request.App I Documents Encl & Available in Pdr.App J Documents Withheld (Ref FOIA Exemption 5) ML20207L1381986-11-10010 November 1986 FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements ML20199E4721986-02-0606 February 1986 Responds to FOIA Request for SECY-85-367A & SECY-85-371. Forwards Portions of Documents Listed in App.Info Also Available in Pdr.App Documents Partially Withheld (Ref FOIA Exemption 5) CY-85-367, FOIA Request for SECY-85-367A & SECY-85-3711985-12-13013 December 1985 FOIA Request for SECY-85-367A & SECY-85-371 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132C1621985-09-18018 September 1985 Responds to 850612 & 14 Requests for Waiver of 10CFR170 Fees for Withdrawal of CP Application & for Informal Hearings.Requests Denied.Util Not Denied Opportunity in 1981 to Withdraw Application ML20134E3211985-08-14014 August 1985 Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20127A9961985-06-14014 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b) & Brief in Support of Application,Per 850129 Meeting ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20097C3231984-08-0909 August 1984 Responds to Questions Re Beam Stops ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20088A1641984-04-10010 April 1984 Reiterates 840322 Request for Return of Reed Rept Under 10CFR2.790(b)(5).Reconsideration of Positions Taken in Oct 1980 Split Vote Re Release of GE Repts Requested. Certificate of Svc Encl ML20087K0001984-03-22022 March 1984 Requests Reconsideration of 801009 Split Vote to Release Reed Rept & Sub-Task Force Repts.Return of Repts Requested. Separate Views of Commissioner Hendrie & Certificate of Svc Encl ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20136E5971983-10-28028 October 1983 Advises of 831110 Site Visit to Observe Implementation of 820830 Soil Stabilization & Erosion Control Plan ML20027C1981982-09-24024 September 1982 Informs That Implementation of Erosion Control Plan Will Adequately Stabilize Soil in Areas Found to Be Eroding During Site Visit in May ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054J0181982-06-22022 June 1982 Ack Receipt of Re Withdrawal of CP Application. NRC Responded in Timely Manner to Util Given TMI Accident & Need to Ensure Implementation of Lessons Learned from Accident ML20053D1821982-05-28028 May 1982 Forwards JB West 820527 Affidavit on NRC Concerns Expressed During 820517 Site Visit Re Potential Offsite Environ Impact of Erosion & Siltation in Areas of Inclined Reactor Pressure Vessel Haul Road from Barge Slip Facilities ML20050C7771982-03-31031 March 1982 Forwards IE Bulletin 82-01, Alteration of Radiographs of Welds in Piping Subassemblies. No Specific Actions Required ML20053A5251982-03-26026 March 1982 Forwards M Fate Ltr Re Termination of Project.Problems Faced by Utils in Licensing Process Thoughtfully Explained.Greater Licensing Predictability Necessary for Future of Nuclear Power.W/O Encl ML20050C3411982-03-23023 March 1982 Forwards QA Program Insp Rept 99900058/82-01 on 820208-11 & Notice of Nonconformance ML20053A5231982-03-18018 March 1982 Responds to .Coal Fired Plant Would Be More Economical than Proposed Nuclear Project ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20040A9621982-01-18018 January 1982 Forwards Ok Corporation Commission 820115 Decision in Cause 27068 Re Util Application for Rate Increase ML20040A6331982-01-11011 January 1982 Forwards Suppl 3 to SER Re Application for CPs for Units. W/O Encl ML20039E8561982-01-0606 January 1982 Forwards DF Guyot Affidavit & Interim Containment Loads Rept,Mark III Containment, Revisions 3 & 4.Matls Pertinent to Contentions 3 & 16 Litigated in Dec 1978 & Feb 1979 ML20040A4571981-12-28028 December 1981 Approves Commitment Contained in PSAR Amend 17 & 19 to Alternative Method of Complying w/10CFR50,App B,Per Reg Guide 1.58 Revision 1 & 1.146,in Response to 810504 Generic Ltr 81-01 Re Qualification of Insp,Exam & Audit Personnel ML20039B7051981-12-11011 December 1981 Forwards Response to NRC Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20039C6051981-12-0909 December 1981 Suppls Response to 810912 & 0603 Ltrs Re Nonconformance Noted in QA Program Insp Rept 99900526/80-01.Revised Drawing List for Black Fox Facility Will Not Be Completed Until Apr 1982 ML20039D4981981-12-0303 December 1981 Forwards Request for Addl Info Re Generic Safety Issues App to Facility Ser.Info Will Update Issues for Which Significant Changes Have Occurred Since 1979 ML20033A9551981-11-20020 November 1981 Forwards Util Response to Intervenors Motion to Reopen Radiological & Safety Hearings,Intervenors Proposed Contentions for Continued Radiological & Safety Hearings & NRC Motion to Reopen Record to Include SER Suppl ML20032D9471981-11-13013 November 1981 Forwards Testimony & Orders of Corporation Commission of State of Ok Re Util Application for Adjustment in Rates. Related Correspondence ML20032D6241981-11-13013 November 1981 Forwards Amend 19 to Psar,Providing Responses to NRC Comments on PSAR Amends 17 & 18 ML20005C1001981-11-0505 November 1981 Forwards Amend 18 to Psar.Amend Contains Matl Responsive to Two Hydrogen Control Requirements of near-term Cp/Mfg License Regulations Which Were Adopted by NRC on 810827. Related Correspondence ML20039E9161981-10-28028 October 1981 Forwards Info Re Proposed Inola Airport,Per Request ML20032A5351981-10-26026 October 1981 Forwards Amend 18 to Psar.Affidavit Encl ML20031E3811981-10-0808 October 1981 Requests Revision of Svc List Per Encl Notice ML20031C5291981-10-0505 October 1981 Submits 25 Advance Copies of Amend 17 to Psar,In Response to Requirements of near-term Cp/Mfg License Regulations Per 810827 NRC Approval.Two Items Re Hydrogen Control Will Be Addressed by 811019.W/o Encl ML20031B3271981-09-25025 September 1981 Forwards Joint Motion to Establish Hearing Schedule. Requests All Parties to Agreement Be Permitted to Reply to NRC Response to Motion ML20031A7871981-09-18018 September 1981 Forwards Answers to Interrogatories from Various Intervenors in Util Pending Rate Case,Cause 27068.Related Correspondence ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20010F7101981-09-0808 September 1981 Forwards Draft Ltr to ASLB Summarizing Util,State of Ok, Citizens Action for Safe Energy & NRC Agreement on Schedule Re Reopened Proceeding on CP Application ML20010H4021981-09-0808 September 1981 Forwards Ok Corp Commission,Black Fox Station Economic Viability Study. Related Correspondence ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20030D2371981-08-24024 August 1981 Advises That Util Is Preparing for Oct 1981 Submittal of PSAR Amend Addressing TMI-related Requirements in NRC .Second Amend Being Prepared Per Changes in 10CFR50, App E,Addressing Util Response for Emergency Plans 1992-03-13 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20209H3071985-10-0808 October 1985
[Table view]Forwards GE 851002 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator. for Evaluation.W/O Encl ML20209H1901985-09-23023 September 1985 Forwards GE 850919 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator, for Evaluation.W/O Encl ML20209H1431985-07-0808 July 1985 Forwards GE 850404 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator, for Evaluation & Recommendation Rept.W/O Encl ML20209H1381985-05-18018 May 1985 Submits Pertinent Facts Re Facilities Simulator Project ML20136E7471984-02-0101 February 1984 Forwards Results of Erosion Control Plan Execution Insp. Applicant Performed Excellent Job of Establishing Erosion Controls ML20049K0481982-03-26026 March 1982 Advises That NRR Board Notification Policy Set Forth in NRR Ofc Ltr 19.Policy Followed So That Board Notification 82-08 Not Provided to Limerick ASLB ML20050A7071982-03-18018 March 1982 Comments on Util Canceling CP Applications,Per 820219 memo.Post-TMI Licensing Pause Did Create Some Uncertainty in Licensing Process But Util Was Late in Filing Response to Commission Proposed Cp/Ml Rule ML20050A7111982-02-19019 February 1982 Forwards Util Canceling Project for Review & Written Comment ML20039A6521981-12-0101 December 1981 Forwards SER Suppl 3 Input Consisting of Update of Unresolved Safety Issues A-43 Through A-48.Issues That Have Been Technically Resolved Since Issuance of SER Include A-9, A-10,A-24,A-31,A-36 & A-42 ML20039C8681981-12-0101 December 1981 Notification of 811216 Meeting W/Bwr Owners Group & GE in Bethesda,Md to Discuss Application of Srss Method of Combining Dynamic Responses for Mechanical Components of BWR-Mark III Plants ML20032B1031981-11-0202 November 1981 Notification of 811106 Meeting W/Util in Bethesda,Md to Discuss Unresolved Safety Issues Re Facility ML20213D8121981-09-19019 September 1981 Advises of Div of Sys Integration Transfer of Mgt & Coordination Function for near-term CP-TMI Issues Review Group to Licensing Project Managers ML20010A3411981-08-0707 August 1981 Notifies That NRC Will Attempt to Arrange Meeting W/ Applicants in Aug 1981 to Reach Agreement on Scope & Schedule for Reopened Hearings,Per ASLB 791025 Order ML19347E7551981-05-0606 May 1981 Notification of 810518 & 19 Meeting W/Util in Inola,Ok to Tour Site & to Discuss Resumption of CP Licensing ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20003C2001981-02-0404 February 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures ML19351F9831981-01-28028 January 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures for Utils W/Pending Mark III CP Applications ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19344B2561980-08-15015 August 1980 Forwards 800725 Fr Notice Re Procedural Assistance Change in Adjudicatory Licensing Proceedings ML19323C4721980-05-0606 May 1980 NRC Is Examining Action Plan Items & Judging Applicability & Scheduling Which Leave Some Sites W/O Applicable Criteria ML20148R2731978-11-17017 November 1978 Rept on Site Visit on 781009-10 to Inspect Faulting & Offsets Reported in Excavation.Util Requested to Supply Trench Maps ML20148E0371978-10-23023 October 1978 Forwards 780929 Memorandum from Director of NRR to Commissioners Re Results of Fire Protection Research Tests Conducted by Ul for NRC as Part of Fire Protection Research Program ML20147H6921978-10-17017 October 1978 Advises That Info Received from GE Re Transient Analysis Methods.Odyn Code Prepared by GE & Will Be Reviewed by Dec 1978 ML20148A8321978-10-0606 October 1978 Forwards Staff Memo W/Recommendations Re Rev of Current Positions on Reg Guide 1.44 ML20150A7401978-10-0404 October 1978 Forwards Draft of Sched Which Is Subj to ASLB Acceptance Re Scheduling & Ruling on Limited Appearances.Four Unsched Testimonies Have Been Received Which Will Necessitate Further Hearing Time ML20147D1701978-10-0202 October 1978 Forwards Testimony of B.Sheron & R.Frahm Re ECCS Water Diversion During a Loca.Demonstrates New Info Obtained from Allens Creek Appl Which Changes Peak Cladding Temp from 2038F to 2085F ML20148E0881978-10-0202 October 1978 Forwards Memoranda Re Ul Fire Test.Recommends That Test Results Be Sent to All Boards Since Matter Generic & Could Be Applicable to All Nuclear Facilities ML20148E0951978-10-0202 October 1978 Advises That on 780915,full-scale Vertical Cable Tray Array W/Cable Protection Using Fire Barriers & Sprinklers Conducted at Ul to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool blanket-type Cable Tray Barriers ML20148E0641978-09-29029 September 1978 Comments on 780915 full-scale Vertical Cable Tray Fire Test, Including Fire Barriers & Sprinklers,Conducted by Ul ML20148A8421978-09-0505 September 1978 Forwards Staff Recommendations for Rev to Reg Guide 1.44, Control of Use of Sensitized Stainless Steel. Recommends That Ofc of Stds Development Prepare Rev to Current Guide ML19320C5591971-10-0505 October 1971 Advises of Telcon W/R Salvatori of Westinghouse Re Classes 2-8 Accidents & Probable Causes.Official Use Only 1985-09-23 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20138N5501985-12-19019 December 1985
[Table view]Staff Requirements Memo Re 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Proposed Transaction for Refinancing Interest in Palo Verde 1 & Fee Refund for Black Fox ML20209H3071985-10-0808 October 1985 Forwards GE 851002 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator. for Evaluation.W/O Encl ML20209H1901985-09-23023 September 1985 Forwards GE 850919 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator, for Evaluation.W/O Encl ML20209H1431985-07-0808 July 1985 Forwards GE 850404 Proposal Responding to Rfpa OIE-85-169, Lease/Purchase of GE Black Fox BWR/6 Simulator, for Evaluation & Recommendation Rept.W/O Encl ML20209H1381985-05-18018 May 1985 Submits Pertinent Facts Re Facilities Simulator Project ML20136E7471984-02-0101 February 1984 Forwards Results of Erosion Control Plan Execution Insp. Applicant Performed Excellent Job of Establishing Erosion Controls ML20049K0481982-03-26026 March 1982 Advises That NRR Board Notification Policy Set Forth in NRR Ofc Ltr 19.Policy Followed So That Board Notification 82-08 Not Provided to Limerick ASLB ML20050A7071982-03-18018 March 1982 Comments on Util Canceling CP Applications,Per 820219 memo.Post-TMI Licensing Pause Did Create Some Uncertainty in Licensing Process But Util Was Late in Filing Response to Commission Proposed Cp/Ml Rule ML20050A7111982-02-19019 February 1982 Forwards Util Canceling Project for Review & Written Comment ML20039A6521981-12-0101 December 1981 Forwards SER Suppl 3 Input Consisting of Update of Unresolved Safety Issues A-43 Through A-48.Issues That Have Been Technically Resolved Since Issuance of SER Include A-9, A-10,A-24,A-31,A-36 & A-42 ML20039C8681981-12-0101 December 1981 Notification of 811216 Meeting W/Bwr Owners Group & GE in Bethesda,Md to Discuss Application of Srss Method of Combining Dynamic Responses for Mechanical Components of BWR-Mark III Plants ML20032B1031981-11-0202 November 1981 Notification of 811106 Meeting W/Util in Bethesda,Md to Discuss Unresolved Safety Issues Re Facility ML20213D8121981-09-19019 September 1981 Advises of Div of Sys Integration Transfer of Mgt & Coordination Function for near-term CP-TMI Issues Review Group to Licensing Project Managers ML20010A3411981-08-0707 August 1981 Notifies That NRC Will Attempt to Arrange Meeting W/ Applicants in Aug 1981 to Reach Agreement on Scope & Schedule for Reopened Hearings,Per ASLB 791025 Order ML19347E7551981-05-0606 May 1981 Notification of 810518 & 19 Meeting W/Util in Inola,Ok to Tour Site & to Discuss Resumption of CP Licensing ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20003C2001981-02-0404 February 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures ML19351F9831981-01-28028 January 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures for Utils W/Pending Mark III CP Applications ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19344B2561980-08-15015 August 1980 Forwards 800725 Fr Notice Re Procedural Assistance Change in Adjudicatory Licensing Proceedings ML19323C4721980-05-0606 May 1980 NRC Is Examining Action Plan Items & Judging Applicability & Scheduling Which Leave Some Sites W/O Applicable Criteria ML20148R2731978-11-17017 November 1978 Rept on Site Visit on 781009-10 to Inspect Faulting & Offsets Reported in Excavation.Util Requested to Supply Trench Maps ML20148E0371978-10-23023 October 1978 Forwards 780929 Memorandum from Director of NRR to Commissioners Re Results of Fire Protection Research Tests Conducted by Ul for NRC as Part of Fire Protection Research Program ML20147H6921978-10-17017 October 1978 Advises That Info Received from GE Re Transient Analysis Methods.Odyn Code Prepared by GE & Will Be Reviewed by Dec 1978 ML20148A8321978-10-0606 October 1978 Forwards Staff Memo W/Recommendations Re Rev of Current Positions on Reg Guide 1.44 ML20150A7401978-10-0404 October 1978 Forwards Draft of Sched Which Is Subj to ASLB Acceptance Re Scheduling & Ruling on Limited Appearances.Four Unsched Testimonies Have Been Received Which Will Necessitate Further Hearing Time ML20147D1701978-10-0202 October 1978 Forwards Testimony of B.Sheron & R.Frahm Re ECCS Water Diversion During a Loca.Demonstrates New Info Obtained from Allens Creek Appl Which Changes Peak Cladding Temp from 2038F to 2085F ML20148E0881978-10-0202 October 1978 Forwards Memoranda Re Ul Fire Test.Recommends That Test Results Be Sent to All Boards Since Matter Generic & Could Be Applicable to All Nuclear Facilities ML20148E0951978-10-0202 October 1978 Advises That on 780915,full-scale Vertical Cable Tray Array W/Cable Protection Using Fire Barriers & Sprinklers Conducted at Ul to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool blanket-type Cable Tray Barriers ML20148E0641978-09-29029 September 1978 Comments on 780915 full-scale Vertical Cable Tray Fire Test, Including Fire Barriers & Sprinklers,Conducted by Ul ML20148A8421978-09-0505 September 1978 Forwards Staff Recommendations for Rev to Reg Guide 1.44, Control of Use of Sensitized Stainless Steel. Recommends That Ofc of Stds Development Prepare Rev to Current Guide ML19320C5591971-10-0505 October 1971 Advises of Telcon W/R Salvatori of Westinghouse Re Classes 2-8 Accidents & Probable Causes.Official Use Only 1985-09-23 Category:NRC TO ASLP MONTHYEARML20010A3411981-08-0707 August 1981
[Table view]Notifies That NRC Will Attempt to Arrange Meeting W/ Applicants in Aug 1981 to Reach Agreement on Scope & Schedule for Reopened Hearings,Per ASLB 791025 Order ML19344B2561980-08-15015 August 1980 Forwards 800725 Fr Notice Re Procedural Assistance Change in Adjudicatory Licensing Proceedings ML20148E0371978-10-23023 October 1978 Forwards 780929 Memorandum from Director of NRR to Commissioners Re Results of Fire Protection Research Tests Conducted by Ul for NRC as Part of Fire Protection Research Program ML20147H6921978-10-17017 October 1978 Advises That Info Received from GE Re Transient Analysis Methods.Odyn Code Prepared by GE & Will Be Reviewed by Dec 1978 ML20148A8321978-10-0606 October 1978 Forwards Staff Memo W/Recommendations Re Rev of Current Positions on Reg Guide 1.44 ML20150A7401978-10-0404 October 1978 Forwards Draft of Sched Which Is Subj to ASLB Acceptance Re Scheduling & Ruling on Limited Appearances.Four Unsched Testimonies Have Been Received Which Will Necessitate Further Hearing Time ML20147D1701978-10-0202 October 1978 Forwards Testimony of B.Sheron & R.Frahm Re ECCS Water Diversion During a Loca.Demonstrates New Info Obtained from Allens Creek Appl Which Changes Peak Cladding Temp from 2038F to 2085F 1981-08-07 |
Text
b UNITED STATES e g 'id NUCLEAR REGULATORY. COMMISSION WASHINGTON, D. C. 20555 g g e
October 17, 1978
- sa,*
NRC PUBLIC DOCUMENT ROOM Sheldon J. Wo1fe, Esq.
Mr. Frederick J. Shon, Member Atomic Safety and Licensing Board Atomic Safety and Licensing Board i
U.S. Nuclear Regulatory Coninission U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Dr. Paul W. Purdom Di rector, Environmental Studies Group Drexel University p
4 32nd and Chestnut Street 8
Philadelphia, Pennsylvania 19104 eg g
OgD g Jgo N r
In the Matter of D[
-4 PUBLIC SERVICE COMPANY OF OKLAHOMA ;
.i /$s 5'
ASSOCIATED ELECTRIC COOPERATIVE, int -
AND WESTERN FARMERS ELECTRIC COOPERATIVE, (Black Fox Station, Units 1 and 2) cr y
Docket'Nos. STN 50-556 and STN 50-557 Gentlemen:
This letter is to infonn the Board and parties of infonnation received by the Staff # rom General Electric in the area of transient analysis methods.
As 7dicated in the enclosures to this letter, tests at a domestic an? toreign BWR for the purpose of transient model verification showed the artain portions of the REDY Code (which is used for calculat.: s of certain transients including turbine trip) under predicts the decrease in critical power ratio (CPR) limits.
For this reason, a new code named ODYN has been prepared by General Electric and is currently under review by the Staff.
The review of the ODYN Code is expected to be conpleted in December 1978.
This will provide sufficient time for the Applicant to evaluate the consequences of anticipated operational occurrances with the appmved method and initiate appmpriate design changes if such changes are needed or deemed beneficial.
The Staff anticipates that these changes, if needed, can be accommodated by minor modifications of
~~
design details, such as the specification of faster rod insertion rates.
I am also informed that while the REDY and ODYN Codes are used for the calculation of certain transients, including turbine trip, the new code OUY%.
m changes do not affect the Energency Core Cooling System and consequently will have no effect on B1ack Fox Contention Number Two.
Sin cerely,
k kj sD.
[o, C ^Sua )c% Cu_t u b
1 c
L. Dow Davis Counsel for NRC Staff Enclosures :
1.
GE October 25, 1977 letter to NRC 2.
Rosztoczy November 23, 1977 letter to Ross 3.
GE January 9,1978 letter to NRC 4.
GE June 46, 1978 letter to NRC cc (w/ encl s. ):
Joseph Gallo, Esq.
Michael I. Miller, Esq.
Mrs. Carrie Dickerson Mr. Clyde Wisner Andrew T. Dalton, Jr. Esq.
Mrs. Ilene H. Younghein Paul M. Murphy Lawrence Burrell Mr. Geral d F. Diddle Mr. Vaughn L. Conrad Joseph R. Faris, Esq.
Robert Franden, Esq.
Mr. Maynard Human Mr. T. N. Ewing Dr. M. J. Robinson Atomic Safety and Licensing Appeal Board Atomic Safety and Licensing Board Panel Docketing and Service Section l
l
'l ' '