ML20126H839

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs Adding fail-to-start to Group of Emergency Diesel Generator Trips Not Automatically Bypassed Upon Loss of Voltage on Emergency Bus &/Or Safety Injection Signal.Certificate of Svc Encl
ML20126H839
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/14/1985
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20126H765 List:
References
TAC-59222, NUDOCS 8506180456
Download: ML20126H839 (2)


Text

.

o LCA 123 b

Attachment 1 Page 1 of 1 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

3. Verifying that samples of diesel fuel from the day tanks and the fuel storage tanks are within the acceptable limits specified in Table 1 of ASTM D975-78 when checked for viscosity, water and sediment,
4. Verifying the fuel transfer pump can be started and transfers fuel f rom the storage system to the day tank,
5. Verifying the diesels start from ambient condition,
6. Verifying the generator is synchronized, loaded to 21690 kw, and operates for 2 60 minutes with both diesel engines operating, and
7. Verifying the diesel generator set is aligned to provide standby power to the associated emergency busses.
b. At least once per 18 months during shutdown by:
1. Subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with its manufacturer's reconsnendations for this class of standby service,
2. Verifying the generator capability to reject a load of 2 828 kw without tripping,
3. Simulating a loss of offsite power with and without the presence of a safety injection signal, and:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses.

b) Verifying the diesels start from ambient condition on the auto-start signal, energize the emergency busses with permanently connected loads, energize the auto-connected emergency loads through the applicable load sequencer and operate for 2 5 minutes while the generator is loaded with the emergency loads, c) verifying that all diesel generator trips, except engine overspeed, fail-to-start, generator phase l overcurrent, generator neutral overcurrent or generator loss of field, are automatically bypassed upon loss of voltage on the emergency bus and/or safety injection actuation signal.

TROJAN-UNIT 1 3/4 8-3 Amendment No. 35, 55, 89 05 6100 hh p P

L  !

e~

1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISION In the Matter of )

)

PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITY OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )

)

(TROJAN NUCLEAR PLANT) ) l CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 123 to the Operating License for Trojan Nuclear Plant, dated June 14, 1985, have been served on the following by hand delivery or by deposit in the United States mail, first class, this 14th day of June 1985:

l Mr. Lynn Frank, Director State of Oregon Department of Energy Labor 6 Industries Bldg. Rm 102 ,

Salem OR 97310 l

Mr. Robert M. Hunt Chairman of County Commissioners Columbia County Courthouse St. Helens OR 97051

) '

5 0[.$A ~. Zimmerman, Manager Ru : lear Regulation Branch NhlearSafety& Regulation Subscribed and sworn to before me this 14th day of June 1985.

NotaryPublicofOregg My Commission Expires: -b d , ///7 4