ML20207H728

From kanterella
Jump to navigation Jump to search

Application for Amend to License DPR-34,changing Tech Spec Requirements Re Administrative Controls.Summary of Proposed Changes & Supporting Info Encl.Fee Paid
ML20207H728
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/22/1986
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To: Berkow H
Office of Nuclear Reactor Regulation
Shared Package
ML20207H732 List:
References
P-86452, TAC-56743, NUDOCS 8607250071
Download: ML20207H728 (9)


Text

Oeubiicservice~ =='=<=.--

2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 July 22, 1986 Fort St. Vrain Unit No. 1 P-86452 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. H. N. Berkow, Director Standardization and Special Projects Directorate Docket No. 50-267

SUBJECT:

Proposed Changes to Section 7 of the Fort St. Vrain Technical Specifications

REFERENCES:

1) PSC Letter, Lee to Johnson, dated 6/10/85 (P-85155)
2) NRC Letter, Wagner to Holmes, dated 8/28/85 (G-85368)

Dear Mr. Berkow:

This letter is to propose changes to the Administrative Controls Section of the Fort St. Vrain Technical Specifications. These changes will void the changes proposed in Reference 1 concerning Administrative Controls.

The addition of a formalized Fuel Surveillance Program, Section 7.7 of the Fort St. Vrain Technical Specifications, will remain as proposed in Reference 1.

A summary of the proposed changes is provided in Attachment 1, the changes themselves in Attachment 2, and an evaluation of Significant Hazards Consideration in Attachment 3.

In accordance with thq provisions of 10CFR170, an application fee of l 5150.00 is enclosed. ggl 8607230071 860722 PDR ADOCK 05000267 ihp bO l -

k hM ^

s f I

0 P PDR

P-86452 July 22, 1986 If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.

Very trulysyours, R. O. Williams, Jr.

Vice President Nuclear Operations R0W/DLF/ paw Attachments cc: Albert J. Hazie Colorado Department of Health i

i i

l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter )

)-

Public Service Company of Colorado ) Docket No. 50-267

- Fort St. Vrain Unit No. 1 )

AFFIDAVIT R. O. Williams, Jr., being first duly sworn, deposes and says:

That he is Vice President, Nuclear Operations, of Public Service Company of Colorado, the Licensee herein, that he has read the foregoing Application of Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the i statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

/ -

R. O. Williams, Jr.

Vice President Nuclear Operations STATE OF /Vrf/////M ) .

COUNTY OF 1////// )

Subscribe and sworn totb efore me, a Notary Public on this A A/)tv day of (faz///- , 1986.

9 /

q ,

N1//)1Ll/Jb.DibtllN/c/*d)$$

/) /d/Jfal

7,,,usu &+ rom My commission expires N//////)[ <2 s2 ,198f.

J L

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of the Facility Operating License)

)

of )

)

PUBLIC SERVICE COMPANY OF COLORADO )

Application for Amendment to Appendix A of Facility Operating License License No..DPR-34 0F THE~

PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility Operating License, License No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By R. O. Williams, Jr.

Vice President Nuclear Operations KELLY, STANSFIELD & 0'DONNELL Bryant O'Donnell Robert E. Thompson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant

FORM (8) 372-20-4033 DATE auiy 17, 198s Pusuc SERVICE COMPANY OF COLORADO  :

FORT SAINT VRAIN ,

THE FIRST INTERSTATE BANK OF DENVER, M.A.

,m.LE AT DENVER, COLORADO V 07122 l PAY **" One Hundred Fifty Dollars and no/100 ----------------- DOLLARS $ --150.00--  !

VOID AFTER 90 DAYS PUBLIC SERVICE COMPANY OF COLORADO Divisl0N ACCOUNT TO THE U. S. Nuclear Regulatory Commission ,omy one SiopURE NECESSARY[F $500 oR USSI ORDER Washington, D. C. 20555 op L ._J

  1. 000000 7 L 2 2e a: LO 20000181: S t. 3 % 7 L e REMITTANCE ADVICE. PLEASE DETACH FOR YOUR RECORDS.

THE ABOVE CHECK IS IN PAYMENT FOR THE FOLLOWING ITEMS. V 07122 YOUR ACCOUNT TO BE CHARGED DESCRIPTION INVOICE Perform Control Res Chg Order Code <8 Spaces 0rdy, AMOUNT 4812 67 54 Technical Specification Fees per 150.00 attached letter P-86452 PUBLiC SERVICE COMPANY OF COLORADO e

ATTACHMENT 1

SUMMARY

OF PROPOSED CHANGES I

Summary of Proposed Changes Section Description of Changes c AC 7.1.1 1) Revision to pagas 7.1-7, 7.1-8, and 7.1-9 to reflect change of title from Training Supervisor to Superintendent of Training.

AC 7.1.2 1) Plant Operations Review Committee

, revisions to reflect change of title for Radiation Protection Manager to Support Services Manager, and for Technical Services Engineering Supervisor to Superintendent of Technical Services Engineering.

2) Plant Operations Review Committee revision to reflect the addition of Superintendent of Scheduling, Planning and Stores.
3) Plant Operations Review Committee revision to eliminate the numerical designation following the title Results Instrumentation and Controls Supervisor, and make the Supervisor designation plural.

AC 7.1.3 1) NFSC membership revision to reflect change of title from Vice President, Electric Production to Vice President, Nuclear Operations.

2) NFSC membership revision to reflect the addition of Manager, Nuclear Licensing and Fuels Division.
3) NFSC membership revision to reflect change of title from Quality Assurance Manager to Manager, Quality Assurance Division.
4) Revision to pages 7.1-18 and 7.1-19 to reflect change of title from Vice President, Electric Production to Vice President, Nuclear Operations.
5) Addition of the words" inspection and audit utilizing an outside" to page 7.1-18 Section (C). These words were inadvertantly omitted in a previous submittal.

L

6) Capitalization of the word "Offsite" on page 7.1-18 Section (9).
7) Correction cf a typographical error on page 7.1-19, Section b. to indicate Section 7.a rather than 7.1 Figure 7.1-1 1) Change of title from President and Chief Executive Officer to Chairman and Chief Executive Officer.
2) Delete Senior Vice President, Operations.
3) The Vice President, Nuclear Operations reports directly to the Chairman and Chief Executive Officer.
4) Change of title from Quality Assurance Manager to Manager, Quality Assurance Division.
5) Add position of Manager, Nuclear Licensing and Fuels Division.
6) Delete Manager, Maintenance and Engineering

. Services Division; Manager, Production Fuels and Services Division.

7) Change of title from Radiation Protection Manager to Support Services Manager.

Figure 7.1-2 1) Change of title from Radiation Protection Manager to Support Services Manager.

2) Change of title from Training Supervisor to Superintendent of Training.
3) The Superintendent of Training reports to the Support Services Manager rather than the Station Manager.
4) Change of title from Technical Services Engineering Supervisor to Superintendent of Technical Services Engineering.
5) Add position of Superintendent of Scheduling, Planning and Stores.
6) Change of title from Manager, Nuclear Production to Manager, Nuclear Production Division.

4 l

1 ATTACHMENT 2 PROPOSED CHANGES l

(

L