UNIT 2 OPERATING DATA REPORT c***************************************************************************
Docket No. 50-318 April 6, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS l
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD FEBRUARY 1987 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
__________________________________~_
- 11. HOURS IN REPORTING PERIOD 672 1,416 86,904
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 73,302.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 72,236.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,783,442 3,762,266 182,079,121 i
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 605,290 1,272,866 60,110,378 i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 581,170 1,221,865 57,378,788
- 19. UNIT SERVICE FACTOR 100.0 100.0 83.1
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 83.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.8 104.6 80.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.3 102.1 78.1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.8
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refueling Shutdown:
March 14, 1987 to May 22, 1987 (69 days)
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
March 1, 1987 8704220177 870407 PDR ADOCK 05000317 R
ppg
1
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE January 1987 1/1 The Unit began this reporting period at full reactor power (860 MWe).
1/16 At 2055, the reactor power was reduced to 600 MWe for Steam Generator Feed Pump (SGFP) testing.
j l
1/18 At 0530, SGFP testing was complete and the Unit returned to full reactor power (860 MWe).
l 1
1/31 At 0905, reactor power was reduced to 83% to repair 21 Heater Drain Tank Normal Level Control Valve.
At 1955, repairs were complete, and at 2250, the Unit was at full reactor power (860 MWe).
1/31 The Unit ended this reporting period at full reactor power (860 MWe).
1
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE February 1987 2/1 The Unit began this reporting period at full reactor power (860 MWe).
2/23 At 0105, Unit 2 began a PSTP-10 coastdown.
Step power reductions are shown in the table below.
DATE TIME MWg 2/23 0105 855 1615 850 2/24 1500 845 2/26 0045 840 2/27 0010 835 1400 830 2/28 1300 825 2/28 At 2358, the Unit tripped on low steam generator water level because of a failure of the control system on #21 Feed Regulator Valvo.
2/28 The Unit was shutdown at the end of this reporting period.