ML20206R180

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Aug 1986
ML20206R180
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/31/1986
From: Behnke C
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20206R141 List:
References
NUDOCS 8704220119
Download: ML20206R180 (1)


Text

a r

oc**************************************************************************

UNIT 1 OPERATING DATA REPORT oc**************************************************************************

Docket No. 50-317 April 7, 1987 Prepared by C. Behnke Telephone: (301)260-4871 OPERATING STATUS

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD AUGUST 1986(Rev 1) 3.

LICENSED THERMAL POWER (MWT) 2700

4. NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845

6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
8. CHANGE IN CAPACITY RATINGS none 9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 5,831 99,204
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,626.8 78,492.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 744.0 5,593.4 76,952.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,963,392 14,833,372 192,157,565
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 640,551 4,964,997 63,567,809
18. NET ELECTRICAL ENERGY GENERATED (MWH) 613,475 4,756,980 60,673,275
19. UNIT SERVICE FACTOR 100.0 95.9 77.6
20. UNIT AVAILABILITY FACTOR 100.0 95.9 77.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.9 98.9 74.5
22. UNIT CAPACITY FACTOR (USING DER NET) 97.6 96.5 72.4
23. UNIT FORCED OUTAGE RATE 0.0 4.1 8.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling shutdown: October 25, 1986 to January 4, 1987 (71 days) 8704220119 870407 PDR ADOCK 05000317 R

PDR

___-