ML20206R469
Jump to navigation
Jump to search
| ML20206R469 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/31/1986 |
| From: | Behnke C BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20206R141 | List: |
| References | |
| NUDOCS 8704220169 | |
| Download: ML20206R469 (1) | |
Text
-.
UNIT 2 OPERATING DATA REPORT
- 4*****************************
Docket No. 50-318 April 6, 1987 Prepared by C.
Behnke Tel. (301) 260-4871 OPERATING STATUS
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs. Unit 2
- 2. REPORTING PERIOD DECEMBER (Rev 1)
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS M 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe 825 8.
CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a This month Year-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 744 8,760 85,488
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,443.0 71,886.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 35.9 1,296.6
- 14. HOURS GENERATOR ON LINE 744.0-8,408.7 70,820.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,998,302 21,834,819 178,316,855
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 675,491 7,315,988 58,837,512.
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 648,676 7,006,666 56,156,923
- 19. UNIT SERVICE FACTOR 100.0 96.0 82.8
- 20. UNIT AVAILABILITY FACTOR 100.0 96.0 82.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 105.7 97.0 79.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 103.2 94.7 77.7
- 23. UNIT FORCED OUTAGE RATE 0.0 3. '7 5.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refueling Shutdown:
March 14, 1987 to May 22, 1987 (69 days) hoj4220169870407 i
R ADOCK 05000317 PDR
,. ~
._.. -. - - _, _ _, _