ML20206R496

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Jan 1987
ML20206R496
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/31/1987
From: Behnke C
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20206R141 List:
References
NUDOCS 8704220173
Download: ML20206R496 (1)


Text

-.

c***************************************************************************

UNIT 2 OPERATING DATA REPORT Docket No. 50-318 April 6, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD JANUARY 1987 (Rev 1)
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
8. CHANGE IN CAPACITY RATINGS none 9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date

_~~______~__________________________

11. HOURS IN REPORTING PERIOD 744 744 86,232
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 72,630.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 744.0 744.0 71,564.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,978,824 1,978,824 180,295,679
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 667,576 667,576 59,505,088
18. NET ELECTRICAL ENERGY GENERATED (MWH) 640,695 640,695 56,797,618
19. UNIT SERVICE FACTOR 100.0 100.0 83.0
20. UNIT AVAILABILITY FACTOR 100.0 100.0 83.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 104.4 104.4 79.8
22. UNIT CAPACITY FACTOR (USING DER NET) 101.9 101.9 77.9
23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.8
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling Shutdown:

March 14, 1987 to May 22, 1987 (69 days) q 8704220173 870407 PDR ADOCK 05000317 R

PDR