ML20206R496
Jump to navigation
Jump to search
| ML20206R496 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/31/1987 |
| From: | Behnke C BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20206R141 | List: |
| References | |
| NUDOCS 8704220173 | |
| Download: ML20206R496 (1) | |
Text
-.
c***************************************************************************
UNIT 2 OPERATING DATA REPORT Docket No. 50-318 April 6, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD JANUARY 1987 (Rev 1)
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
_~~______~__________________________
- 11. HOURS IN REPORTING PERIOD 744 744 86,232
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 72,630.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 744.0 744.0 71,564.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,978,824 1,978,824 180,295,679
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 667,576 667,576 59,505,088
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 640,695 640,695 56,797,618
- 19. UNIT SERVICE FACTOR 100.0 100.0 83.0
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 83.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.4 104.4 79.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.9 101.9 77.9
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.8
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refueling Shutdown:
March 14, 1987 to May 22, 1987 (69 days) q 8704220173 870407 PDR ADOCK 05000317 R