ML20209J190

From kanterella
Jump to navigation Jump to search

Advises That Installation of Shunt Trip Coil Trip Attachment Complete,Closing Out SER Confirmatory Item 26
ML20209J190
Person / Time
Site: Beaver Valley
Issue date: 04/24/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2NRC-7-094, 2NRC-7-94, TAC-62909, TAC-62950, NUDOCS 8705040234
Download: ML20209J190 (1)


Text

-- _ _

dTr

'A@

M 2NRC-7-094 (412)393 7546 Beaver Valley No. 2 Unit Project Organization Telecopy(412)393 7889 g

SgGBl eo April 24, 1987 Shippingport. PA 15077 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 2055S

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Automatic Reactor Trip Using Shunt Coil Trip Attachment SER Confirmatory item #26 Gentlemen:

The modification to BVPS Unit 2 to install the Shunt Coil Trip attachment is completed. The modification was completed by field change notice OMWM-10610.

DLC will consider that the completed installation of the Shunt Coil Trip attachment closes SER confirmatory item #26. If you should have any questions, please call Mr. A. N. Dicesaro at (412) 393-7742.

DUQUESNE LIGHT COMPANY sto J. J. Carey /

Senior Vice President AND/ijr NR/AND/ITM/26 AR/NAR cc: Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident inspector Mr. L. Prividy, NRC Resident inspector INP0 Records Center NRC Document Control Desk J8 0 ,

ggg;m%=

E