-- _

dTr

'A@

M 2NRC-7-094 (412)393 7546 Beaver Valley No. 2 Unit Project Organization Telecopy(412)393 7889 SgGBl April 24, 1987 g

eo Shippingport. PA 15077 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 2055S

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Automatic Reactor Trip Using Shunt Coil Trip Attachment SER Confirmatory item #26 Gentlemen:

The modification to BVPS Unit 2 to install the Shunt Coil Trip attachment is completed.

The modification was completed by field change notice OMWM-10610.

DLC will consider that the completed installation of the Shunt Coil Trip attachment closes SER confirmatory item #26.

If you should have any questions, please call Mr. A. N. Dicesaro at (412) 393-7742.

DUQUESNE LIGHT COMPANY sto J. J. Carey

/

Senior Vice President AND/ijr NR/AND/ITM/26 AR/NAR cc:

Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident inspector Mr. L. Prividy, NRC Resident inspector INP0 Records Center NRC Document Control Desk J8 0