ML20202J223
| ML20202J223 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/04/1986 |
| From: | Stevens J Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8604150587 | |
| Download: ML20202J223 (2) | |
Text
.
f APR 4y Docket Nos.:
STN 50-456 and STN 50-457 APPLICANT: Comonwealth Edison Company FACILITY:
Braidwood Station, Units 1 and 2
SUBJECT:
MEETING
SUMMARY
- CONTAINMENT LINER C0ATING SYSTEM On February 4,1986, a meeting was held in Bethesda, Maryland between members of the NRC staff, Commonwealth Edison Company (the applicant),
Sargent and I. undy (the architect / engineer), and Carboline Company (paint coatings manufacturer). A list of the meeting attendees is given in.
The viewgraphs used during the presentation are given in.
~
The applicant, together with its architect / engineer and paint coatings manufacturer, gave a presentation covering modifications made to the safety-related containment liner coating system at Braidwood Station, Units 1 and 2.
During the presentation, Mr. J. Montle (Carboline Company) indicated that the footnote in the paint manufacturer's recomendations-for recoating operations should be interpreted as follows:
In order to maintain a 3 mils dry film thickness of the final paint coating, as much as 50% thinning of the paint may be necessary; use of lesser thinning ratios would not constitute a deviation from the paint manufacturer's recomendations as long as the final coating had a dry film thickness of 3 mils. Mr. J. Montle made a comitment to revise l
this footnote in order to incorporate the clarification as stated i
above. The staff requested that the applicant submit four test reports l
which were used to support their conclusion that the coating system as installed satisfies the ANSI 101.2 and ANSI 5.12 standards, including
}
the DBA testing requirement.
((For b
J.A. Stevens, Project Manager PWR Project Directorate No. 5 Division of PWR licensing-A 4
Enclusures:
1.
List of Meeting Attendees 2.
Viewgraphs Used During Presentation cc:
J. Wing, NRR W. Little, RIII PM:PD#5 DIR:PD#5 JStevens:js V. Noonan
'4/ 4 /85 4/
/86 0FFICIAI. RECORD COPY 8604150587 860404 PDR ADOCK 05000456 A
PDR 4
p+
~
~
i -
Meeting Suninary Distribution
^
er Central File NRC Participants
. g Local'PDR V. Nerses PD#5 Reading File R. Ballard J. Partlow (Emergency Preparedness only)
S. Chan V.-Noonan D. Jeng Project Manager V. Nerses D. Ruscitto OELD A. Cerne E. Jordan B. Grimes ACRS (10)
M. Rushbrook cc: Licensee and Plant Service List b
m m
m.
m'
.