|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20217H8081998-03-31031 March 1998 Summary of 980306 Meeting W/Util in Rockville,Md Re Status of Licensing Issues for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2.List of Attendees Encl ML20199A5071998-01-16016 January 1998 Summary of 971211 Meeting W/Comed in Rockville,Maryland Re Additional Justification for Proposed Methodology for Estimating voltage-dependent Growth Rates of Outer Diameter Stress Corrosion Crack Indications Left in Service ML20211P3421997-09-23023 September 1997 Summary of 970904 Meeting W/Commonwealth Edison Co in Rockville,Md Re Methodology for Calculating Radiation Doses in Control Room & at Eab & LPZ in Event of Msb Outside Containment.List of Attendees & Licensee Presentation Encl ML20210Q1281997-08-25025 August 1997 Summary of 970723 Meeting W/Util in Rockville,Md Re Util Assessment of Spring 1997 Eddy Current Insp of Plant SG Tubes.List of Attendees & Handouts Presented Encl ML20141F3641997-06-27027 June 1997 Summary of 970430 Meeting W/Licensee in Rockville,Md to Discuss Various Aspects of SG Eddy Current Insp Conducted at Plants During Spring 1997 Refueling Outage.List of Attendees & Licensee Handouts Encl ML20138L0741997-02-18018 February 1997 Summary of 970123 Meeting W/Commonwealth Edison Co to Discuss Plant Amend Request to Convert Current TSs ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20134G7011997-02-0707 February 1997 Summary of 970122 Meeting W/Util Re Program for Replacement of SG at Licensee Facilities.List of Attendees & Matl Used in Presentation Encl ML20133J0641997-01-13013 January 1997 Summary of 960821 Meeting W/Comed to Discuss Status of SG Replacement Program W/Nrc Staff.List of Attendees & Util Presentation Encl ML20149M3131996-12-10010 December 1996 Summary of 961114 Meeting W/Representives of CE in Rockville,Md to Discuss Status of Ongoing Braidwood,Unit 1, SG Tube Insp.List of Attendees & Slides Encl ML20129F9431996-10-25025 October 1996 Summary of 961004 Meeting W/Representatives of CE in Rockville,Md to Discuss Technical Basis for Licensee Pending Proposal to Delete Braidwood Unit 1 mid-cycle SG Eddy Current Insp.List of Attendees & Matls Discussed Encl ML20129G8501996-07-0505 July 1996 Summary of ACRS Joint Subcommittee Matl & Metallurgy & Severe Accidents Meeting on 960603-04 to Gather Info on Status of Activities Associated W/Development of Proposed Rule Re SG Integrity ML20217D4661995-12-0404 December 1995 Summary of 950911 Meeting W/Commonwealth Edison Re Util Commitment to Improving Dresden,Matl Condition at Zion, Declining Performance at Braidwood & Comed Resources ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20148S3821988-03-31031 March 1988 Summary of Operating Reactors Events Meeting 88-13 on 880329.List of Attendees,Discussion of Events & Summary of Reactor Scrams Encl ML20236F4571987-07-13013 July 1987 Summary of 870620 Meeting W/Util,Isham,Lincoln & Beale & Business & Professional People for Public Interest in Bethesda,Md to Provide Info to Assist in Determination of Significant Hazards Consideration Re Transfer of Ownership ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20206J9221987-04-0606 April 1987 Summary of 870318 Meeting W/Util in Bethesda,Md Re Util Proposal to Transfer Ownership of Facilities.Attendees List & Description of Agreement Between Util,Govt Entities & Industrial Users Encl ML20205K7591986-12-31031 December 1986 Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) ML20215N6001986-11-0303 November 1986 Summary of 861021 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Design of Diesel Generators to Ensure Testing Does Not Impair Capability of Providing Emergency Power. Facility Design Unacceptable ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20202J2231986-04-0404 April 1986 Summary of 860204 Meeting W/Util,Sargent & Lundy & Carboline Co in Bethesda,Md Re Mods to Containment Liner Coating Sys. Util Will Submit Test Repts Supporting Conclusion That Sys Meets ANSI Stds.W/O Stated Encls ML20127N2591985-03-25025 March 1985 Summary of ACRS Subcommittee 850129 Meeting in Washington,Dc Re Review of Util Application for License.Schedule of Presentations & List of Attendees Encl ML20054F2861982-05-27027 May 1982 Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment 1999-06-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20217H8081998-03-31031 March 1998 Summary of 980306 Meeting W/Util in Rockville,Md Re Status of Licensing Issues for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2.List of Attendees Encl ML20199A5071998-01-16016 January 1998 Summary of 971211 Meeting W/Comed in Rockville,Maryland Re Additional Justification for Proposed Methodology for Estimating voltage-dependent Growth Rates of Outer Diameter Stress Corrosion Crack Indications Left in Service ML20211P3421997-09-23023 September 1997 Summary of 970904 Meeting W/Commonwealth Edison Co in Rockville,Md Re Methodology for Calculating Radiation Doses in Control Room & at Eab & LPZ in Event of Msb Outside Containment.List of Attendees & Licensee Presentation Encl ML20210Q1281997-08-25025 August 1997 Summary of 970723 Meeting W/Util in Rockville,Md Re Util Assessment of Spring 1997 Eddy Current Insp of Plant SG Tubes.List of Attendees & Handouts Presented Encl ML20141F3641997-06-27027 June 1997 Summary of 970430 Meeting W/Licensee in Rockville,Md to Discuss Various Aspects of SG Eddy Current Insp Conducted at Plants During Spring 1997 Refueling Outage.List of Attendees & Licensee Handouts Encl ML20138L0741997-02-18018 February 1997 Summary of 970123 Meeting W/Commonwealth Edison Co to Discuss Plant Amend Request to Convert Current TSs ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20134G7011997-02-0707 February 1997 Summary of 970122 Meeting W/Util Re Program for Replacement of SG at Licensee Facilities.List of Attendees & Matl Used in Presentation Encl ML20133J0641997-01-13013 January 1997 Summary of 960821 Meeting W/Comed to Discuss Status of SG Replacement Program W/Nrc Staff.List of Attendees & Util Presentation Encl ML20149M3131996-12-10010 December 1996 Summary of 961114 Meeting W/Representives of CE in Rockville,Md to Discuss Status of Ongoing Braidwood,Unit 1, SG Tube Insp.List of Attendees & Slides Encl ML20129F9431996-10-25025 October 1996 Summary of 961004 Meeting W/Representatives of CE in Rockville,Md to Discuss Technical Basis for Licensee Pending Proposal to Delete Braidwood Unit 1 mid-cycle SG Eddy Current Insp.List of Attendees & Matls Discussed Encl ML20129G8501996-07-0505 July 1996 Summary of ACRS Joint Subcommittee Matl & Metallurgy & Severe Accidents Meeting on 960603-04 to Gather Info on Status of Activities Associated W/Development of Proposed Rule Re SG Integrity ML20217D4661995-12-0404 December 1995 Summary of 950911 Meeting W/Commonwealth Edison Re Util Commitment to Improving Dresden,Matl Condition at Zion, Declining Performance at Braidwood & Comed Resources ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20148S3821988-03-31031 March 1988 Summary of Operating Reactors Events Meeting 88-13 on 880329.List of Attendees,Discussion of Events & Summary of Reactor Scrams Encl ML20236F4571987-07-13013 July 1987 Summary of 870620 Meeting W/Util,Isham,Lincoln & Beale & Business & Professional People for Public Interest in Bethesda,Md to Provide Info to Assist in Determination of Significant Hazards Consideration Re Transfer of Ownership ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20206J9221987-04-0606 April 1987 Summary of 870318 Meeting W/Util in Bethesda,Md Re Util Proposal to Transfer Ownership of Facilities.Attendees List & Description of Agreement Between Util,Govt Entities & Industrial Users Encl ML20205K7591986-12-31031 December 1986 Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) ML20215N6001986-11-0303 November 1986 Summary of 861021 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Design of Diesel Generators to Ensure Testing Does Not Impair Capability of Providing Emergency Power. Facility Design Unacceptable ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20202J2231986-04-0404 April 1986 Summary of 860204 Meeting W/Util,Sargent & Lundy & Carboline Co in Bethesda,Md Re Mods to Containment Liner Coating Sys. Util Will Submit Test Repts Supporting Conclusion That Sys Meets ANSI Stds.W/O Stated Encls ML20127N2591985-03-25025 March 1985 Summary of ACRS Subcommittee 850129 Meeting in Washington,Dc Re Review of Util Application for License.Schedule of Presentations & List of Attendees Encl ML20054F2861982-05-27027 May 1982 Summary of 820506 Meeting W/Util & Sargent & Lundy in Bethesda,Md Re Program for Seismic Qualification of Equipment 1999-06-30
[Table view] |
Text
. . . -
f APR 4y Docket Nos.: STN 50-456 and STN 50-457 APPLICANT: Comonwealth Edison Company FACILITY: Braidwood Station, Units 1 and 2
SUBJECT:
MEETING
SUMMARY
- CONTAINMENT LINER C0ATING SYSTEM On February 4,1986, a meeting was held in Bethesda, Maryland between members of the NRC staff, Commonwealth Edison Company (the applicant),
Sargent and I. undy (the architect / engineer), and Carboline Company (paint coatings manufacturer). A list of the meeting attendees is given in Enclosure 1. The viewgraphs used during the presentation are given in Enclosure 2.
~
- The applicant, together with its architect / engineer and paint coatings manufacturer, gave a presentation covering modifications made to the safety-related containment liner coating system at Braidwood Station, Units 1 and 2. During the presentation, Mr. J. Montle (Carboline Company) indicated that the footnote in the paint manufacturer's recomendations-for recoating operations should be interpreted as follows
- In order to maintain a 3 mils dry film thickness of the final paint coating, as much as 50% thinning of the paint may be necessary; use of lesser thinning ratios would not constitute a deviation from the paint manufacturer's recomendations as long as the final coating had a dry film thickness of 3 mils. Mr. J. Montle made a comitment to revise
- l this footnote in order to incorporate the clarification as stated i above. The staff requested that the applicant submit four test reports ,
l which were used to support their conclusion that the coating system as '
installed satisfies the ANSI 101.2 and ANSI 5.12 standards, including
} the DBA testing requirement.
b
((For J.A. Stevens, Project Manager *
, PWR Project Directorate No. 5 l Division of PWR licensing-A 4
Enclusures:
- 1. List of Meeting Attendees
- 2. Viewgraphs Used During Presentation cc: J. Wing, NRR W. Little, RIII PM:PD#5 DIR:PD#5 JStevens:js V. Noonan
'4/ 4 /85 4/ /86 0FFICIAI. RECORD COPY 8604150587 860404 PDR ADOCK 05000456 A PDR 4
~
~
p+ .
i- Meeting Suninary Distribution , .
^
. g er Central File NRC Participants Local'PDR V. Nerses ,
PD#5 Reading File R. Ballard J. Partlow (Emergency Preparedness only) S. Chan V.-Noonan D. Jeng Project Manager V. Nerses D. Ruscitto OELD A. Cerne E. Jordan B. Grimes ACRS (10)
M. Rushbrook cc: Licensee and Plant Service List b
m .
m__._-__. m'__-__._