ML20202J204

From kanterella
Jump to navigation Jump to search
Responds to Re as-built Drawing Issue.Minor Changes,Clarification,Program Refinements & Corrective Actions in Acceptable
ML20202J204
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/13/1985
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20202H992 List:
References
FOIA-86-244 NUDOCS 8607170041
Download: ML20202J204 (1)


Text

,

/

/Afc C-8

/

ew..,..

f

/

</(

I M 1 3 1885 a

Docket No. 50-341 The Detroit Edison Company ATTN: Dr. Wayne H. Jens Vice President Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gentlemen:

This is in response to your letter dated March 9, 1985, related to the As-Built Drawing Issue. The clarification, minor changes, and refinements

,to your program and corrcctive actions as delineated in our letter of March 8, 1985, are acceptable.

Your cooperation with us is appreciated.

Sincerely.

M i; i::.' * :. : i......:,

R. L. Spessard, Director Division of Reactor Safety cc:

L. P. Bregni, Licensing Engineer P. A. Marquardt, Corporate Legal Departnent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voight, Esq.

Nuclear Facilities and Environmental Monitoring Section l

RI R1 I gg HMrison/jk S'

sard N

Q;,,g 03/13/85 c

8607170041 860709 PDR FOIA

+

PUNTENN86-244 PDR U.,.,

. ' 'Y. *

(

Y'"

.