Other: ML20195G001, ML20196G562, ML20199G257, ML20202F772, ML20207A732, ML20217D579, ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld, ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790, ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions
|
MONTHYEARML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis Project stage: Request ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair1998-11-13013 November 1998 Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair Project stage: Other ML20198D1271998-12-16016 December 1998 Forwards RAI Re Request for Amend to TS & Bases to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SG for Max of 2 Operating Cycles Project stage: RAI ML20199G2571999-01-11011 January 1999 Provides Responses to 981216 RAI Re 981027 Amend Request to Revise TSs to Use Electrosleeves to Repair SG Tubes. Proprietary Encl Withheld Project stage: Other ML20202F7721999-01-29029 January 1999 Provides Changes to Further Clarify That Electrosleeve Use Is Limited to 2 Cycles Following Installation of First Electrosleeve Project stage: Other ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl Project stage: Meeting ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 Project stage: Other ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld Project stage: Other ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions Project stage: Other ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by UE Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl Project stage: Other ML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with UE & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & UE Meeting Presentation Matls Encl Project stage: Meeting ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation Project stage: Other ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve Project stage: Other ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included Project stage: Other 1999-04-07
[Table View] |
Text
____
Uni:n El:ctric One Ameren Plaza 4,
1901 Chouteau Avenue PO Ilox 66149 St. Louis, MO 63166-6149 2n621 t?22
- 9 4 January 29,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, D.C. 20555-0001 ULNRC-3955 Gentlemen:
TAC No. MA 3954 hb CALLAWAY PLANT igy NN DOCKET NUMBER 50-483
- E REVISION TO TECHNICAL SPECIFICATION 3/4.4 REACTOR COOLANT SYSTEM Eeferences: 1) ULNRC-3910 dated October 27,1998
- 2) ULNRC-3948 dated January 11,1999 Reference 1 transmitted an amendment request to revise Callaway Technical Specifications to use Electrosleeves to repair steam generator tubes.
Reference 2 transmitted, in part, revised wording to limit the use of Electrosleeves to 2 cycles. This transmittal provides changes to further clarify that their use is limited to 2 cycles following installation of the first Electrosleeve. Attached is a revised mark-up page (Insert to Insert A) from that transmitted by Reference 2.
This change has been reviewed and approved by the Callaway Onsite Review Committee. It does not alter the conclusion of the Significant Hazard Evaluation transmitted by Reference 1.
In addition, an identification sheet entitled " Exhibits A and B" is transmitted that makes the link between the proprietary information transmitted 1"
by Reference 2 and the Framatome Technologies, Inc. Affidavit, also transmitted by Reference 2.
If you have any additional questions, please contact us.
Sincerely,
\\
<W [e2-ure C h
s l
9902040172 990129" PDR ADOCK 05000483 Alan C. Passwater P
Q Manager, Corporate Nuclear Services KO DES /pir Attachments: Technical Specification Mark-up Exhibit A and B identification sheet t
a subsidiary of Amoren Corporation L
. ~.
.4
+
STATE OF MISSOURI )
)
SS CITY OF ST. LOUIS )
Alan C.
Passwater, of lawful age, being first duly sworn upon oath says that ho is Manager, Corporate Nuclear Services for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated'are true and correct to the best of his knowledge, information and belief.
l
[ 'Wa u w $
By
+8 Alan C. Passwater Manager, Corporate Nuclear Services SUBSCRIBED and sworn to before me this day of 4ena-
, 1999.
/
/
M k ef7 % w fL
,/g'
.. ~~~,b, 0.p...%.REV c<
lE!***"*%e$
ane
=
m%rmd) l'
<OF M...
PATRICIA L REYNOl.DS NOTARY PUBUC-8 TATE OFleIIOUfu ST. LDUIS COUNTY RW 000AN8610N EXMIES DE.If,2000
M 4
,v 9
~ cci :M.JH.[ Fletcher
,; Professional Nuclear' Consulting, Inc.
. t.
19041 Raines Drive
~
-Derwood, MD 20855-2432 Regional. Administrator U.S. Nuclear Regulatory Commission Region JRF 611 Ryan Plaza Drive Suite;400 L
Arlington, TX 76011-8064-
' Senior Resident Inspector Callaway' Resident. Office U.S. Nuclear Regulatory Commission J
8201 NRC Road-Steedman, MO 65077 l3 Mr..Mel Gray (2)
Office:of Nuclear Reactor Regulation l
U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop-13E16 11555 Rockville. Pike Rockville, MD 20852-2738 Manager, Electric Department Missourtfublic' Service Commission P.O.-Box 360'
- Jefferson' City, MO 65102 i
f i
?
l' l'
I
.+
!n l[
~
p v
m i
t n
~
- ~.
4.*
y.
j.
o INSERT TO INSERT A c
The plugging or repair limit for the pressure boundary portion of Electrosleeves is determined to be 20% through wall of the nominal sleeve wall thickness (as determined by NDE). The 20% plugging or repair limit will apply to inner diameter pits in Regions B and C.
All steam generator tubes containing an Electrosleeve will be removed h service-eeee-u, = :es:eu:.::em!!=:=. = = l =
= #
W*fAQEM-m
I y*
EXHIBITS A & B i
EXHIBff A FTI's Proprietary Response to Question 4 in " Request for Additional Information regarding review oflicense amendment request to allow Framatome Electrosleeving of
' steam generator tubes at Union EleGL Company's Callaway Plant, Unit 1, (Docket No.40-483), dated December 16, 1998,"
l l
l i
l i
EXHIBIT B The above listed document contains information which is considered Proprietary in accordance with Criteria b and e of the attached affidavit.
c Ii l