TAC:MA3954
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Results
Other: ML20195G001, ML20196G562, ML20199G257, ML20202F772, ML20207A732, ML20217D579, ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld, ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790, ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions | |
From | |
MONTHYEARML20155B5791998-10-27027 October 1998
[table view]Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair1998-11-13013 November 1998 Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20198D1271998-12-16016 December 1998 Forwards RAI Re Request for Amend to TS & Bases to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SG for Max of 2 Operating Cycles ML20199G2571999-01-11011 January 1999 Provides Responses to 981216 RAI Re 981027 Amend Request to Revise TSs to Use Electrosleeves to Repair SG Tubes. Proprietary Encl Withheld ML20202F7721999-01-29029 January 1999 Provides Changes to Further Clarify That Electrosleeve Use Is Limited to 2 Cycles Following Installation of First Electrosleeve ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with Ue & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & Ue Meeting Presentation Matls Encl ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included 1999-04-07 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MA3954&oldid=3203037"