Letter Sequence Request |
|---|
|
Results
Other: AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval, AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid, ML20003E750, ML20137P712, ML20199L109, ML20203D679, ML20203J963, ML20207G520, ML20212P470, ML20215L243
|
MONTHYEARML20003E7501981-04-0707 April 1981 Responds to NRC Providing Addl Guidance Re NUREG-0737,Item I.G.1.Addl Safety Analyses & Waivers of Certain Tech Specs Would Be Required Re Training During Low Power Testing.Encl Program Completes Response Project stage: Other AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval1981-08-18018 August 1981 Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval Project stage: Other ML20137P6931986-01-29029 January 1986 Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Request ML20137P7121986-01-29029 January 1986 Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Other AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid1986-01-29029 January 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid Project stage: Request AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other ML20203D6791986-04-14014 April 1986 Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers Project stage: Other ML20199E9111986-06-13013 June 1986 Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test Project stage: Request AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid1986-06-13013 June 1986 Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid Project stage: Request AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid1986-07-16016 July 1986 Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid Project stage: Request ML20207G5201986-07-16016 July 1986 Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20212P4641986-08-26026 August 1986 Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Request ML20212P4701986-08-26026 August 1986 Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Other AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months1986-08-26026 August 1986 Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months Project stage: Request ML20215L2431986-10-17017 October 1986 Amend 21 to License NPF-29,revising Tech Specs Re Names & Designation of Certain Plant Svc Water Valves,Record Retention Specs & Control Rod Scram Discharge Vol Project stage: Other ML20215L2481986-10-17017 October 1986 Safety Evaluation Supporting Amend 21 to License NPF-29 Project stage: Approval ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-04-03
[Table View] |
Text
__
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2)
Low pressure setpoint of the:
(a)
LPCI A and B subsystem loop to be 1 38 psig.
(b) LPCI C subsystem loop and LPCS system to be 1 22 psig.
(c) HPCS system to be 1 18 psig.
b)
Header delta P instrumentation and verifying the setpoint of the HPCS system and LPCS system and LPCI subsystems to be 1.2 0.1 psid change from the normal indicated AP.
3.
Verifying that the suction for the HPCS system is automatically transferred from the condensate storage tank to the suppression pool on a condensate storage tank low water level signal and on a suppression pool high water level signal.
d.
For the ADS at least once per 18 months by:
1.
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency I
operating sequence, but excluding actual valve actuation.
2.
Manually opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
a)
The control valve or bypass valve position responds accordingly, or b)
There is a corresponding change in the measured steam flow.
(InseAT) xThe provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.
GRAND GULF-UNIT 1 3/4 5-5 A mendrwedt No. -
8606240146 860613 PDR ADOCK 05000416 P
PDR
INSERT TO 4.5.1.d page 3/4 5-5 3.
Performing an extrapolated pressure decay test on the ADS air system to demonstrate system pressure will be maintained for 7 days at a value 2: 110 psig without makeup air available.
4.
Verifying within 31 days after obtaining the representative sample that a laboratory analysis of the instrument air supply to ADS shall be determined to contain:
1.
particle size less than or equal to 50 microns 2.
total hydrocarbon less than 1 ppm 0
3.
moisture content less than or equal to -40 F dew point at 100 psig.
I t,
l f
Y J10 MISC 660E0803 - 4
9 v
F Roth booster PAL Q
OOM PR ESSOE
~I
@lrM A703
)Ml067A (A-3D l
I l
1 l
I L--L-F130^
FIBo8 gg_1_J py pg I
N 2)I ~ - ~ ~ I~ ~- ~ ~ R203 R7o2 Y-~~
N708
/
cae (y_ tog) l I
.s
/%'Q O
O O
ADS A DS ADS Aos VhLVES VALVES VALVE' Valves l'-
AIR Aig a-gig gig ACV#
RCVR RevR Acyn v
v 2
v i
5 R
H
~
s 9
l. -
--