Other: AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval, AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid, ML20003E750, ML20137P712, ML20199L109, ML20203D679, ML20203J963, ML20207G520, ML20212P470, ML20215L243
|
MONTHYEARML20003E7501981-04-0707 April 1981 Responds to NRC Providing Addl Guidance Re NUREG-0737,Item I.G.1.Addl Safety Analyses & Waivers of Certain Tech Specs Would Be Required Re Training During Low Power Testing.Encl Program Completes Response Project stage: Other AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval1981-08-18018 August 1981 Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval Project stage: Other ML20137P6931986-01-29029 January 1986 Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Request ML20137P7121986-01-29029 January 1986 Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Other AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid1986-01-29029 January 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid Project stage: Request AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other ML20203D6791986-04-14014 April 1986 Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers Project stage: Other ML20199E9111986-06-13013 June 1986 Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test Project stage: Request AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid1986-06-13013 June 1986 Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid Project stage: Request AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid1986-07-16016 July 1986 Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid Project stage: Request ML20207G5201986-07-16016 July 1986 Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20212P4641986-08-26026 August 1986 Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Request ML20212P4701986-08-26026 August 1986 Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Other AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months1986-08-26026 August 1986 Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months Project stage: Request ML20215L2431986-10-17017 October 1986 Amend 21 to License NPF-29,revising Tech Specs Re Names & Designation of Certain Plant Svc Water Valves,Record Retention Specs & Control Rod Scram Discharge Vol Project stage: Other ML20215L2481986-10-17017 October 1986 Safety Evaluation Supporting Amend 21 to License NPF-29 Project stage: Approval ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-04-03
[Table View] |
Text
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NP F-29 DOCKET No. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGIIT COMPANY and MIDDLE SOUTH ENERGY, INC.
and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION AFFIRMATION I, O. D. Kingsley, Jr., being duly sworn, stated that I am Vice President, Nuclear Operations of Mississippi Power & Light Company; that on behalf of Mississippi Power & Light Company, Middle South Energy, Inc., and South Mississippi Electric Power Association I am authorized by Mississippi Power & Light Company to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating License of the Grand Gulf Nuclear Station; that I signed this application as Vice President, Nuclear Operations of Mississippi Power & Light Company; and that the statements made and the matters set forth therein are true and correct to thefbest of my knowledge, information and belief.
.:f.
4 I
J
- 0. W KinghIg~f,j,
r STATE OF MISSISSIPPI COUNTY OF HINDS SUBSCRIBED AND SWORN TO befo e me, a fot ry Public, in and for the j
., 1986.
County and State above named, this g ny of k U'
y (SEAL)
/ FLs _
1
'd
~
~ ~ ~ Notary Public Hy commission expires:
/j20
(
16 F/cr-la n r, m -
a en P
J14AECM86012102 - 4
1.
(NPE-84/01)
SUBJECT:
Technical Specification Tables 3.6.4-1, 3.8.4.1-1 and 3.8.4.2-1; pages 3/4 6-31, -34, -39, -4 2, -44, 3/4 8-23, -26, -29,
-31, -32, -37, -42, and 3/4 8-53.
DISCUSSION:
This technical specification change results from a design change in progress to complete installation of the Drywell Chilled Water system (DCW; Grand Gulf system serial P72).
This design change is scheduled for implementation not later than startup following the first refueling outage. As done on several recent Technical Specification changes involving design changes to the plant, it is requested that the NRC issue the change with an open effective date and require that MP&L notify the NRC within 30 days of the effective date of implementation of the affected technical specification changes.
Completion of this design change requires changing nameplates, labels, and tags on certain Plant Service Water System (PSW; Grand Gulf system serial P44) isolation valves to indicate that they now isolate DCW.
The attached marked-up technical specification pages reflect those valves that are affected by this design change, and include changes of the nomenclature for such attendant components as the penetration conductor overcurrent protective devices and thermal overload protective devices. A summary of the proposed changes is as follows:
Old Valve New Valve Tech. Spec.
Number Number Page P44-F070-B P72-F123-B 3/4 6-31 P44-F069-A P72-F122-A 3/4 6-31 P44-F053-A P72-F121-A 3/4 6-31 P44-F076-A P72-F125-A 3/4 6-34 P44-F077-B P72-F126-B 3/4 6-34 P44-F074-B P72-F124-B 3/4 6-34 P44-F043 P72-F165 3/4 6-39 P44-F075 P72-F147 3/4 6-42 P44-F333 P72-F167 3/4 6-44 N1P44F105A-N N1P72F150A-N 3/4 8-23 N1P44F105B-N NIP 72F150B-N 3/4 8-26 QlP44F076-A QlP72F125-A 3/4 8-29 J14NLSIM85121701 - 2
Old Valve New Valve Tech. Spec.
Number Number Page N1P44F055-A N1P7F145-A 3/4 8-31 N1P44F057-A N1P72Fil6-A 3/4 8-31 N1P44F059-A N1P72F139-A 3/4 8-31 N1P44F061-A N1P72F111-A 3/4 8-31 N1P44F063-A N1P72Fl01-A 3/4 8-31 N1P44F065-A N1P72F134-A 3/4 8-31 QlP44F070-B QlP72F123-B 3/4 8-32 QlP44F074-B QlP72F124-B 3/4 8-32 QlP44F077-B QlP72F126-B 3/4 8-32 N1P44F056-B N1P72F146-B 3/4 8-37 N1P44F058-B N1P72Fil7-B 3/4 8-37 N!P44F060-B N1P72F140-B 3/4 8-37 N1P44F062-B N1P72Fil2-B 3/4 8-37 N1P44F064-B N1P72F102-B 3/4 8-37 N1P44F066-B N1P72F135-B 3/4 8-37 IP44ZLR001 IP72ZLR018 3/4 8-42 QlP44F053 QlP72F121 3/4 8-53 QlP44F069 QlP72F122 3/4 8-53 QlP44F076 QlP72F125 3/4 8-53 QlP44F070 QlP72F123 3/4 8-53 QlP44F074 QlP72F124 3/4 8-53 QlP44F077 QlP72F126 3/4 8-53 The FSAR will be revised at the next annual update to reflect this change.
JUSTIFICATION: Grand Gulf preoperational testing indicated that additional drywell cooling was required to support full power operation and prompted the implementation of a design change to install the DCW System. This modification utilized existing valves and piping that had previously been components of the PSW servicing the drywell coolers. PSW was originally expected to accommodate the drywell cooling load, but was found to be inadequate for this purpose. DCW uses freon chillers to significantly increase the heat removal capacity of the system. The proposed change is to revise the Containment and J14NLSIM85121701 - 3
1 Drywell Isolation Valves table, Primary Containment Penetration q
Conductor Overcurrent Protective Devices table, and the Motor
[
4 Operated Valves Thermal Overload Protection table to indicate t
}
those valves that have been incorporated as part of the DCW system.
The proposed change will make the technical specifications more accurately reflect the system with which the indicated valves are associated and will allow associated documentation such as piping and instrument diagrams to show the valves as DCW
+
components. The technical specification requirements that ensure the isolation function of these valves are unaffected by this change.
3 SIGNIFICANT HAZARDS CONSIDERATION:
The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated because it is a change to the system name and component designation only.
}
The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated because the isolation function of the valves required by the technical specifications remain unaffected.
The proposed change does not involve a significant reduction in the margin of safety because the change is administrative in nature and does not affect any margin of safety, i
The increased heat removal capability of the DCW over the PSW ensures that equipment temperature operational limits are not exceeded.
Therefore, the proposed change involves no significant hazards considerations.
l i
f J14NLSIM85121701 - 4