Pages that link to "ML20199E911"
Jump to navigation
Jump to search
The following pages link to ML20199E911:
Displayed 18 items.
- 05000416/LER-1982-072, Forwards LER 82-072/01T-0 (← links)
- ML20199L109 (← links)
- ML20212P470 (← links)
- ML20212P464 (← links)
- TAC:49992 (← links)
- AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months (← links)
- AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid (← links)
- AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid (← links)
- AECM-85-0245, Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316 (← links)
- AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg (← links)
- AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531 (← links)
- AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated (← links)
- AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21 (← links)
- AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage (← links)
- AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed (← links)
- AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl (← links)
- ML20215L248 (← links)
- ML20215L243 (← links)