DATE:

f//e>[f6 MEMORANDUM FOR: Hazel Smith. NRR FROM:

4 'ect4 A N e4 a o

[

luisd A S / A / O S 8 ()

V

SUBJECT:

FOIA

_ 8D - 206 1

s 1 This-branch,has no documents subject to this request The enclosed documents listed at Appendix A are responsive subject request.

I reconnend release of these documents.

withheld from public disclosure for reasons di i

e document.

DR" availability accession nuvbers listed at Appendix C relat this request.

e to

_ The following offices '(or individuals) may have documents s this request # were not notified by your mute slip to me y

_. OTHER C0tMENTs: -Fo I// }& mhawera

_ lAJL h

/<ts!r di-Vi s, L.

- l fut e r

/ kr/ st w L, '

~

un

' /C L

/fcu a /a im suo

/csd

- E SI R ~

wtvr m I 6/228) v i

I

\\

})

/fM64U l'5 1444

" - " N :f Signature 4

lAlAA/264l //// A /Al G & 8 g

Name (printed or typed)

Date CONTACT:

(X-

)

\\

)

8605300551 060523 PDR FOIA

\\

SHOLLY86-206 PDR

g3

"'v/1.~s-pt

%-Sya C. O

%~~A 66h 8 lif -.I_

l

~

Vay fa E. 0% & & u f~uLgd M BJ.

at rL L.

tL L'

a tL vu !A ] 1

.& Al J~

l

/a 01 Ma a

bl Ad G

~

$)- & WM.*r

H&

PLANT SYSTEMS BRANCH

' CHRONOLOGICAL FILE FEBRUARY 1986 i

ITEM N0.

DESCRIPTION DATE 1

MEMO: Hulman to William. Harper, Subj: APPLICATION

/3 FOR MECHANICAL ENGINEER.

2 MEM0: Hulman to B. C. Seam, Subj: APPLICATION FOR

/3 MECHANICAL ENGINEER.

I 3

MEM0: Hulman to Kunjitham Gauthaman, Subj: APPLICATION

/3 FOR MECHANICAL ENGINEER.

4 MEM0: Bernero to Roger Walker, Subj: LACK OF TECHNI-

/3 CAL SPECIFICATIONS FOR SECONDARY CONTAINMENT AUTOMATIC ISOLATION DAMPERS AT BROWNS FERRY (TAC #60418, 60419 &

60420) 5 MEM0:

G. Lainas to E. Adensam, Subj: SAFETY EVALUA-

/3 TION OF H02E CREEK GENERATING STATION UNIT 1 I

6 MEMO:

K. Pulsipher to P. Cota Subj: DESIGNATION OF

/4 j

NRR REPRESENTATIVES ON STANDARDS C0lWITTIEES i

7 MEM0: Bernero to Reytblatt Subj: ACKNOWLEDGE RECEIPT OF

/6 LETTERS 8

MEM0: Bernero to Denton, Subj: WITHHOLDING TRANSFER

/6 OF GENERIC ISSUE C-8 "MSIV LEAKAGE AND LCS FAILURES" 9

i' MEM0: Hulman to Mark Williams, Subj: REQUEST FOR

/7 i

TECHNICAL ASSISTANCE SUPPORT FOR PLANT SYSTEMS BRANCH BWR LICENSING 10 MEM0:

G. Lainas to Muller Subj: REQUEST FOR EXEMPTION

/8 FROM REQUIREMENTS OF APPENDIX R TO 10 CFR 50 - BRUNSWICK UNITS 1 & 2 (TACS #43417/43418) 11 MEM0: Liaw to Grimes, Subj: COMMENTS ON JOHN STEVENSON'S

/10 PAPER PRESENTED AT ASME SWGDA CONtITTEE MEETING ON

]

NOVEMBER 13, 1985.

12 MEM0: BWR TRAINING COURSE

/10 i

13 MEM0: Hulman to Hodges, Subj: PERRY PLANT CONTROL ROOM

/11 HABITABILITY 14 MEM0: Hulman to Lainas, Subj: DELEGATION OF AUTHORITY

/13 i

l t

CHRON0 LOGICAL FILE - PSB - FEBRUARY 1986 ITEM NO.

DESCRIPTION DATE 15 MEM0: Lainas to Lutler, Subj: RESPONSE TO REGION III

/19 TECHNICAL ASSISTANCE REPUEST REGARDING CLINTON AIR CLEANING SYSTEMS (TIA #S570) 16 MEM0: Lainas to Adensam, Subj: PLANT SYSTEMS BRANCH

/19 INPUT TO THE SSER NO. 3 FOR NINE MILE POINT UNIT N0. 2 17 MEMO: Hulman, to David Poole, Subj: AS REQUESTED BY

/2t YOUR LETTER OF THE THREE HOUR TIME PERIOD.

18 MEM0: Campe to Hulman, Subj: DELEGATION OF AUTHORITY

/21 19 MEM0: Dick Cleveland to Hulman, Subj: STANDARD ORDER FOR

/24 00E WORK 20 MEM0: Karen Pulsipher to Project Director, Subj: FY1987-

/21 1991 ADP PLANNING CALL MEM0: Gus Lainas to John Zwolinski, Subj: EVALUATION

/21 21 0F EXEMPTION REQUEST FROM APPENDIX R TO 10 CFR 50-MONT-ICELLO NUCLEAR GENERATING STATION AND RESPONSE TO REQUEST FOR TECHNICAL ASSISTANCE FROM REGION III 22 MEMO: Gus Lainas to Walter Butler, Subj: TECHNICAL

/21 SPECIFICATIONS FOR CLINTON POWER STATION MEM0: Gus Lainas to Elinor Adensam, Subj: WNP-2

/21 23 TECHNICAL SPECIFICATION CHANGES REGARDING OFFGAS; TREATMENT SYSTEM NOBLE GAS ACTIVITY MONITORS 24 MEM0: Hulman,to Walter Butler, Subj; PERRY UNDERDRAIN

/21 technical specifications 25 MEMO: Lainas to Butler, Subj: PERRY UNIT 1 TECHNICAL

/21 SPECIFICATIONS; DRYWELL AIRLOCK TESTING 26 MEM0: Lainas to Adensam, Subj: HOPE CREEK GENERATING

/21 STATEION-ACCEPTANCE OF THE ODCM 27 MEM0: Hulman to Stolz, Subj: REFERENCE MATERIALS FOR

/21 THE DAVIS-BESSE REVIEW GROUP 28 MEM0: Hulman,to Bernero, Subj:

SUMMARY

OF DIESEL GENERATOR /24 TESTING DATA 28 MEMO: Lainas to Adensam, Subj: QUALIFICATION OF DIESEL

/25 ENGIN MOUNTED CONTROL AND MONITORING INSTRUMENT 29 MEMO: Hulman to Zwolinski, Subj: LIST OF PLANNED

/28 LICENSING ACCOMPLISHMENTS

. - -