Text
.-
DATE:
f//e>[f6 MEMORANDUM FOR: Hazel Smith. NRR FROM:
4 'ect4 A N e4 a o
[
luisd A S / A / O S 8 ()
V
SUBJECT:
_ 8D - 206 1
s 1 This-branch,has no documents subject to this request The enclosed documents listed at Appendix A are responsive subject request.
I reconnend release of these documents.
withheld from public disclosure for reasons di i
e document.
DR" availability accession nuvbers listed at Appendix C relat this request.
e to
_ The following offices '(or individuals) may have documents s this request # were not notified by your mute slip to me y
_. OTHER C0tMENTs: -Fo I// }& mhawera
_ lAJL h
/<ts!r di-Vi s, L.
- l fut e r
/ kr/ st w L, '
~
un
' /C L
/fcu a /a im suo
/csd
- E SI R ~
wtvr m I 6/228) v i
I
\\
})
/fM64U l'5 1444
" - " N :f Signature 4
lAlAA/264l //// A /Al G & 8 g
Name (printed or typed)
Date CONTACT:
(X-
)
\\
)
\\
SHOLLY86-206 PDR
g3
"'v/1.~s-pt
%-Sya C. O
%~~A 66h 8 lif -.I_
l
~
Vay fa E. 0% & & u f~uLgd M BJ.
at rL L.
tL L'
a tL vu !A ] 1
.& Al J~
l
/a 01 Ma a
bl Ad G
~
$)- & WM.*r
H&
PLANT SYSTEMS BRANCH
' CHRONOLOGICAL FILE FEBRUARY 1986 i
ITEM N0.
DESCRIPTION DATE 1
MEMO: Hulman to William. Harper, Subj: APPLICATION
/3 FOR MECHANICAL ENGINEER.
2 MEM0: Hulman to B. C. Seam, Subj: APPLICATION FOR
/3 MECHANICAL ENGINEER.
I 3
MEM0: Hulman to Kunjitham Gauthaman, Subj: APPLICATION
/3 FOR MECHANICAL ENGINEER.
4 MEM0: Bernero to Roger Walker, Subj: LACK OF TECHNI-
/3 CAL SPECIFICATIONS FOR SECONDARY CONTAINMENT AUTOMATIC ISOLATION DAMPERS AT BROWNS FERRY (TAC #60418, 60419 &
60420) 5 MEM0:
G. Lainas to E. Adensam, Subj: SAFETY EVALUA-
/3 TION OF H02E CREEK GENERATING STATION UNIT 1 I
6 MEMO:
K. Pulsipher to P. Cota Subj: DESIGNATION OF
/4 j
NRR REPRESENTATIVES ON STANDARDS C0lWITTIEES i
7 MEM0: Bernero to Reytblatt Subj: ACKNOWLEDGE RECEIPT OF
/6 LETTERS 8
MEM0: Bernero to Denton, Subj: WITHHOLDING TRANSFER
/6 OF GENERIC ISSUE C-8 "MSIV LEAKAGE AND LCS FAILURES" 9
i' MEM0: Hulman to Mark Williams, Subj: REQUEST FOR
/7 i
TECHNICAL ASSISTANCE SUPPORT FOR PLANT SYSTEMS BRANCH BWR LICENSING 10 MEM0:
G. Lainas to Muller Subj: REQUEST FOR EXEMPTION
/8 FROM REQUIREMENTS OF APPENDIX R TO 10 CFR 50 - BRUNSWICK UNITS 1 & 2 (TACS #43417/43418) 11 MEM0: Liaw to Grimes, Subj: COMMENTS ON JOHN STEVENSON'S
/10 PAPER PRESENTED AT ASME SWGDA CONtITTEE MEETING ON
]
NOVEMBER 13, 1985.
12 MEM0: BWR TRAINING COURSE
/10 i
13 MEM0: Hulman to Hodges, Subj: PERRY PLANT CONTROL ROOM
/11 HABITABILITY 14 MEM0: Hulman to Lainas, Subj: DELEGATION OF AUTHORITY
/13 i
l t
CHRON0 LOGICAL FILE - PSB - FEBRUARY 1986 ITEM NO.
DESCRIPTION DATE 15 MEM0: Lainas to Lutler, Subj: RESPONSE TO REGION III
/19 TECHNICAL ASSISTANCE REPUEST REGARDING CLINTON AIR CLEANING SYSTEMS (TIA #S570) 16 MEM0: Lainas to Adensam, Subj: PLANT SYSTEMS BRANCH
/19 INPUT TO THE SSER NO. 3 FOR NINE MILE POINT UNIT N0. 2 17 MEMO: Hulman, to David Poole, Subj: AS REQUESTED BY
/2t YOUR LETTER OF THE THREE HOUR TIME PERIOD.
18 MEM0: Campe to Hulman, Subj: DELEGATION OF AUTHORITY
/21 19 MEM0: Dick Cleveland to Hulman, Subj: STANDARD ORDER FOR
/24 00E WORK 20 MEM0: Karen Pulsipher to Project Director, Subj: FY1987-
/21 1991 ADP PLANNING CALL MEM0: Gus Lainas to John Zwolinski, Subj: EVALUATION
/21 21 0F EXEMPTION REQUEST FROM APPENDIX R TO 10 CFR 50-MONT-ICELLO NUCLEAR GENERATING STATION AND RESPONSE TO REQUEST FOR TECHNICAL ASSISTANCE FROM REGION III 22 MEMO: Gus Lainas to Walter Butler, Subj: TECHNICAL
/21 SPECIFICATIONS FOR CLINTON POWER STATION MEM0: Gus Lainas to Elinor Adensam, Subj: WNP-2
/21 23 TECHNICAL SPECIFICATION CHANGES REGARDING OFFGAS; TREATMENT SYSTEM NOBLE GAS ACTIVITY MONITORS 24 MEM0: Hulman,to Walter Butler, Subj; PERRY UNDERDRAIN
/21 technical specifications 25 MEMO: Lainas to Butler, Subj: PERRY UNIT 1 TECHNICAL
/21 SPECIFICATIONS; DRYWELL AIRLOCK TESTING 26 MEM0: Lainas to Adensam, Subj: HOPE CREEK GENERATING
/21 STATEION-ACCEPTANCE OF THE ODCM 27 MEM0: Hulman to Stolz, Subj: REFERENCE MATERIALS FOR
/21 THE DAVIS-BESSE REVIEW GROUP 28 MEM0: Hulman,to Bernero, Subj:
SUMMARY
OF DIESEL GENERATOR /24 TESTING DATA 28 MEMO: Lainas to Adensam, Subj: QUALIFICATION OF DIESEL
/25 ENGIN MOUNTED CONTROL AND MONITORING INSTRUMENT 29 MEMO: Hulman to Zwolinski, Subj: LIST OF PLANNED
/28 LICENSING ACCOMPLISHMENTS
. - -