Text
UNITED STATES j;y NUCLEAR REGULATORY COMMISSION g
3y n
W AsmNGTON,0. C. 20555
-l
% g y +/
Y April 18, 1986 Docket No. 50-219 Mr. P. B. Fiedler Vice' President & Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
Dear Mr. Fiedler:
SUBJECT:
IMPLEMENTATION OF GENERIC REQUIREMENTS
~
Re:
Ovster Creek Nuclear Generating Station The Comptroller General in a Reoort to the Congress dated September 19, 1984, stated "NRC needs better manacement controls to ensure implementation of ceneric issue solutions." To correct this situation, the Nuclear Regulatory Commission is workina on a lono-term proqram which will imorove its documentation on the status of power reactor licensees' imolementation of approved reoulator.y imnrovements.
To assist me in developing this information for Oyster Creek Nuclear Generating Station, please review the enclosed plant-speci.fic list, add omitted significant actions to the list, and provide the date that all aspects of each identified recuirement were completed / implemented or are For each requirement that has been comoleted, expected to be completed.
enter " completed" under the Status column and the date the item was completed.
For requirements that have not been completed / implemented provide the I do not pro.iected date and enter " pro.iected" under the Status column. Rather, I will expect or want a ma.ior effort made to obtain precise dates.
accept readily-known or best-estimate dates for actions that have been For examole, the year only would be acceptable for comoletely implemented.
completions prior to 1984; the month as weil as year is needed for require-For pro.iected completions /imolementations ments completed after that time.
in 1986, use month and year.
Use year only for projections thereafter.
Please provide a response in the fonn of a marked up listino by May 31, 1986.
To the extent that you cannot mark up the list for all items by this date, please give priority to those items resultina from TMI and submit remainina items at a later date.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
8605290737 860522 DR ADOCK 05000219 PDR
In order to assess the magnitude of this effort I would appreciate your estimate of the burden (in man hoursi to your staff to accomplish the above task. Please work closely with your pro.iect manager.
I I
Sincer ely, Y,
John A. Zwolinski, Director BWR P o,iect Directorate #1 Division of BWR Licensing
Enclosure:
As stated cc w/ enclosure:
See next page 1
eb R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
334 FACILITY IMPLEMENTATION 03/31/86 gh FACILITY: OYSTER CREEK 1 PLANT LOCATION: 9 MI S OF TOMS RIVER, NJ LICENSED POWER: 1930 MHT PROJECT MANAGER: J. DON 0 HEN DOCKET NUMBER: 050-00219 DESIGN POWER:
0650 MHE BRANCH CHIEF:
J. ZHOLINSKI i
- en ARCH / ENGINEER
- B&R NSSS VENDOR:
GE LIC. ASSISTANT:
C. JAMERSON IE INSPECTOR:
W.
BATEMAN LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS RATE en M08334 A-01 10 CFR 50.55 A(G) - ISI 06/28/83C M08100 A-02 APPENDIX I - ALARA 04/30/86 M00908 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS 09/f4/79C M06104 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 01/01/70C M08678 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 03/03/82C M07922 A-05 GE MARK I CONTAINMENT TECH SPECS-SHORT TERM 06/20/78C l
M11638 A-08 ECCS EVALUATION-GENERIC PER 50.46 COMPLIANCE 05/30/79C M11366 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 10/16/79C
~
M10097 A-10 CONTINGENCY FLANNING 09/25/80C M07683 A-11 GUARD TRAINING PLANS 02/11/81C j
M10500 A-12 VITAL AREA ANALYSIS 04/12/82C M12651 A-15 9UALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 01/30/80C M47116 A-16 9UALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 03/11/82C M51115 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 09/30/86 M55726 A-18 TECN SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/30/85C M59122 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS 06/30/86
""M06534 E-02 FIRE PROTECTION 03/03/78C f
M46668 B-05 STRESS CORROSION CRACKING - BWR RCSPB 06/29/84C M08224 B-05 STRESS CORROSION CRACKING - BWR RCSPB f0/17/79C M08200 3-06 BWR RELIEF VALVE 01/16/80C W
W
R-1208731-001 R E.G U L A T 0 R Y INF0RMATION TRACKING SYSTEM PAGE No.:
335 e
FACILITY IMPLEMENTATION 03/31/86 OYSTER CREEK 1 (CONTINUATION)
'e LIC ACT LICENSEE TAC NO.
MPA_9 TITLE COMPLETE SVATUS pflg M12145 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C M08040 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/31/86 M10287 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/16/81C M10349 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCI A 02/28/82C M08439 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/31/86 M10038 B-23 DEGRADED GRID VOLTAGE 10/16/81C M10191 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW 08/25/80C M42613 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H 01/21/86C N08411 B-25 BHR FEEDHATER N0ZZLE CRACKING 03/19/82C M10891 3-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C M07404 B-27 REVIEH RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 07/01/78C M11015 B-29 BHR FEEDHATER PUMP TRIP 11/30/78C a
M11104 B-41 FIRc PROTECTION - FINAL TECH SPECS (INCLUDES SER S 02/13/81C M11755 B-42 TMI FOLLON UP - ALL PLANTS 05/08/80C O
M12022 B-44 LESSONS LEARNED IMPLEMENTATION 03/27/81C M12019 B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C O
M42083 B-46 ANALYSIS OF TURBINE DISC CRACKS 05/15/80C M12699 B-47 ECCSs CLAD SHELLING AND RUPTURE 07/20/80C M12766 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/16/81C
""M42315 B-58 SDV CAPABILITY 10/15/82C
- M42014 B-59 MASONRY HALL DESIGN 12/23/85C M42524 B-60 ENVIRONMENTAL QUALIFICATION 05/28/85C M42692 3-61 LOSS OF NON CLASS IE 18C P0HER 07/28/82C T
~
d 4P
I Q-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 336 em FACILITY IMPLEMENTATION 03/31/86
)
OYSTER CREEK 1 (CONTINUATION) e
)
LIC ACT LICENSEE TAC NO.
MPA_t TITLE C_0MPLETE STATUS HAIK e
M42763 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 06/21/82C M43919 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 09/04/8EC e
M43717 B-65 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BHR Ot/27/86C 05/25/82C M46623 B-70 FATIGUE TRANSIENT LIMIT TS M51687 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/30/85C POST TRIP REVIEN; PROGRAM DESCRIPTION 8 05/f4/85C M52782 B-76 ITEM 1.1 M52863 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER 11/30/86 M52954 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 04/30/86 e
M53025 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 07/30/86 MS$554 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-11/22/85C e
M55605 B-84 INSPECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 08/05/85C U
M53615 B-85 SALEM ATHS 1.2 DATA CAPABILITY 05/31/86 e
M53698 B-86 SALEM ATHS 2.2 S-R COMPONENTS 01/30/87 23 M53781 3-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 04/30/86 o
[2 M53864 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 07/30/86 M54091 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 05/15/86 M54008 B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 04/30/86 M08282 C-02 BWR-RECIRC. PUMP TRIP (ATHS) 08/20/79C M47128 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PNASE 06/21/83C
~
03/30/83C
""M07147 C-11 RPS PDHER SUPPLY M52253 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF M*A 06/28/85C M079*4 D-01 GE MARK I CONTAINMENT EVALUATION - LONG TERM Of/13/84C 10/13/78C M10070 D-11 FISSION GAS RELEASE M
4F
O O-1208731-001 REGULAT0RY INF0RMATION TRACKING SY$ TEM PAGE No.:
337 FACILITY IMPLEMENTATION 03/31/86 OYSTER CREEK 1 (CONTINUATION)
LIC ACT LICENSEE TAC NO MPA 0 TITLE COMPLETE STATUS DAlf M07061 D-12 NON-JET PUMP BNR CORE SPRAY PERFORMANCE 04/06/83C M12291 D-15 MIGN ENERGY LINE BREAK 8 CONSEQUENTIAL SYSTEM FAIL 02/18/81C M43051 D-17 DEFINITION OF OPERABLE 10/29/82C M55885 D-19 DIESEL GENERATOR RELIABILITY TECM SPECS (GL 84-15) 10/07/85C M57161 D-20 MARK I DRYWELL VACUUM BREAKERS - LICENSEE RESPONSE 06/30/86 M44043 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/15/82C M44112 F-02 I.A.1.3 SHIFT MANNING 11/28/83C M44183 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 11/30/82C M44254 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C M44324 F-05 I.C.1.2/3.8 PROCEDURES GENERATION PACKAGES (NUREG 03/30/87 M47237 F-86 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/01/82C M47309 F-07 I.C 6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/01/82C M51185 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRA 10/10/84C M51265 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 03/05/86C
'. M40393 F-10 II.B.1 RCS MIGN POINT VENTS 09/02/83C M47960 F-11 II.B.2 PLANT SMIELDING 04/19/85C
? M44462 F-12 II.B.3 POST ACCIDENT SAMPLING 08/29/84C M40535 F-13 II.B.4 TRAINING FC1 MITIGATING CORE DAMAGE 11/30/82C M40603 F-14 II.D.1 RV AND SV TRAINIFG 06/19/84C
- M40801 F-18 TI.E.4.1 DEDICATED NYDROGEN PENETRATION 11/08/82C M44872 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 08/31/83C 2
M40003 F-20 II.F.1.1 N00LE GAS MONITOR 03/31/82C M45014 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 03/31/82C
)
7
I O-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
338 FACILITY IMPLEMENTATION 03/31/86 OYSTER CREEK 1 (CONTINUATIDN) en LIC ACT LICENSEE TAC NO.
MPA 9 TITLE COMPLETE STATUS RAIE M45085 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 10/20/82C M47621 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 09/29/83C M47692 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 09/29/83C M47763 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 09/29/83C M45155 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEGUATE 08/09/85C M45365 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 06/10/82C M45508 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 03/03/82C M45558 F-44 II.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 12/18/81C M45600 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 10/23/84C M45651 F-47 II.K.3.17 ECCS DUTAGES 08/04/83C M45696 F-48 II.K.3.18 ADS ACTUATION 01/04/85C M45720 F-49 II.K.3.19 INTERLDCK RECIRCULATION PUMP MODIFICATI 05/30/85C 05/27/83C M45744 F-50 II.K.3.21 RESTART OF CSS AND LPCI M45708 F-53 II.K.3.25 PDWER ON PUMP SEALS 10/22/82C M45792 F-54 II.K.3.27 CDMMON REFERENCE LEVEL 04/13/82C M45802 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSERS 02/01/84C M45848 F-57 II.K 3.30 58 LOCA METHODS 12/21/83C M48187 F-58 II.K.3.51 CDNPLIANCE WITN 10 CFR 50.46 12/21/83C M45892 F-59 II.K.3.44 ANTICIPATED TRANSIENTS MITH SINGLE FAIL 06/18/82C
"* 45916 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 05/17/83C M
M45067 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 03/03/86C M46038 F-64 III.A.1.2 OPERATIONAL SUPPORT' CENTER 03/03/86C M46110 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 03/03/86C
s R-1208731-801 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
339 FACILITY IMPLEMENTATION 03/31/86 OYSTER CREEK 1 (CONTINUATION)
LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS galg M46182 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46254 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/09/83C M46326 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 03/03/86C M46307 F-69 III.D 3.3 IMPLANT RADIATION MONITORING 06/29/82C M46466 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 03/31/86 M56107 F-71 1.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO 02/27/86C
=
O W
e em W
)
w
)
WB A