prl g

May 1, 1986 Docket Nos. 50-295 DISTRIBUTION ket File and 50-304 NRC PDR L PDR Gray File J. Norris C. Vogan OELD E. Jordan B. Grimes J. Partlow ACRS(10)

H. Smith Mr. D. L. Farrar S. Scott Director of Nuclear Licensing Commonwealth Edison Company

. Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

Subject:

IMPLEMENTATION OF GENERIC REQUIREMENTS The Comptroller General in a Report to the Congress cated September'19,1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions.".To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.

To assist me in developing this information for Zion Nuclear Power Station Units I and 2, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed.

For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed.

For requirements that have not been completed / implemented, provide the projected date and enter

" projected" under the Status column.

I do not expect or want a major effort made to obtain percise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented is acceptable. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter.

Please provide a response in the form of a marked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.

l l

8605190009 860501 l

DR ADOCK 05000295:

p PDR l

7

- This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

Sincere'y, Jan A. Norris, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A, NRR

Enclosures:

As stated cc: See next page i

\\

PAD-3 N P l

D PA -3s C. Vogan d. f opris bs 3

S. V g 01/\\/86 C 4 l 'j S 6 ^

L s/</n M'9/< f 4

13

,y I

~,

5 R-1294731-est R E O U L A't.0 R Y INF0RMATION TRACKINO SYSTEM PAGE 110. 8 FACILITY IMPLEMENTATION 04/1 FACILITY: ZION 1 PLANT LOCATION: 40 MI N OF CHICAGO, ILL BOCKET NUMBER: 850-89295 LICENSE"3 POWER: 3250 leff PROJECT MANAGER: J. NORRIS

~

ARCH / ENGINEER: SSL DESIGN PGNER:

1040 MNE BRANCH CHIEF:

S. VARGA j

IE INSPECTOR:

M. NOLZMER NSSS VENDOR:

NEST LIC. ASSISTANT:

L. PARRISH 1

1 TAC NO.

IFA 3 TITLE i

j N07553 E-01 ZION 1 - SPENT FUEL POOL MODIFICATION i

I MD6911 A-01 ZIOli 1 - INSERVICE INSPECTION j

MO7998 B-91 ZION 1 - DIESEL OENERATOR LOCROUT f

M88258 C-91 ZION 1 - PNR SECONDARY CHEMISTRY MONITORING ltE9UIREMENTS - GENERIC M44964 F-91 ZION 1 - NUREG-9737 I.A.1.1 STA LONG TERM RE9UIREMENTS

{

M49683 0-01 ZION 1 - REACTOR COOLAlti PUMP TRIP M68139 A-92 j

ZION 1 - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN M44137 F-92 ZION 1 - IOUREG-8737 1. A.1.3.1, SHIFT MAINIING OVERTIME LIMITS L

M87881 D-92 ZION 1 - ECCS ZIRC CLAD MODEL ERROR l

l Mr,1852 E-92 ZION 1 - DROPPED FUEL CASK i

MS6776 B-92 ZION 1 - FIRE PROTECTION MD6554 A-93 ZI0lt 1 - PHYSICAL SECURITY PROGRAM MS8498 B-03 ZIDH 1 - Phit MODERATOR DILUTIOlt M87178 D-03 ZIOli 1-PRES $UltIZER NEATUP RATE CHA100E FROM 200 DEGREES F/NR TO 109 DEGREES F/NR M44298 F-03 ZIOll 1 - DOUltEG-9737 I. A.2.1.4, UPoltADING OF RO l

AND SRO TRAINING MS8014 C-04 ZION 1-FILTER TECH SPECS "M86795 3-94 ZION 1 - REACT 0ft VESSEL OVERPRESSINtE PROTECTION I

M04862 A-94 i

ZION 1 - CONTAINMENT LEAK TESTIllo - APP. J (GENERIC) 4 M40279 F-84 ZION 1 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE 1

C00LIllG OUIDELINES

}

M44349 F-35 ZION 1 - PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1) 1 I-

A

~

]

a.

i O

R-1298731-Set REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s f

FACILITY IMPLEMENTATION 04/(

j ZION 1 (CONTINUATION)

TAC NO.

frA B TITLE i

M06431 E-05 ZION 1 - N-1 LOOP OPERATION i

M08874 C-96 ZION 1 - PHR PUMP S S/0 SUPPORTS - LAMELLAR TEARING S FRACTURE TOUGHNESS l

M47263 F-86 ZION 1 - FEEDBACK 0F OPERATING EXPERIENCE (AP I.C.5)

M47335 F-97 ZION 1 - CORRECT PERFORMANCE OF OPERATING ACTIVITIES CAPI.C.6) i M08876 C-97 ZION 1 - FUEL HANDLING ACCIDENT INSIDE CONATAINMENT N07810 3-97 ZION 1 - STEAM OENERATOR FEEDNATER FLON INSTABILITY

}

N06689 A-37 ZION 1 - FRACTURE TOUONNESS RERUIREMENTS APPEND 0 M08175 5-98 ZION 1 - PNR HPSI-LPSI FLON RESISTANCE - GENEitIC M51217 F-08 ZION 1 - I.D.1.1 - DETAILED CONTROL ROOM DESION REVIEN PROGRAM PLAN F-98 M51297 F-89 ZION 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM 1

i M08475 C-09 ZION 1 - PNR AUXILIARY FEEDNATER PUMPS (GL-4)

MS8988 A-99 ZION 1 - PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE MATERIAL SURVEILLANCE i

M07837 B-09 ZION 1 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM i

M19741 A-10 ZION 1 - CONTINGENCY PLAN REVIEN MS8992 C-18 ZION 1 -CONTROL OF HEAVY LOADS OVER SPENT' FUEL POOL (NUREO 8612) l j

MS8872 D-10 ZION 1 - REVIEN OF ASYIO1 ETHIC LOCA LOADS SUBMITTAL j-M44417 F-10 ZION 1 - NUREG-0737 II.D.1, RCS HIGH POINT VENTS j

M47986 F-11 ZION 1 - PLANT SHIELDIIIG MODIFICATIONS (11.B.2.2)

M19739 A-11 ZION 1 - GUARD TRAINING PLAN REVIEW 4

"M10004 D-11 ZION 1 - ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LNR FUEL s'

j M18745 A-12 ZION 1 - VITAL AREA ANALYSIS M44087 F-12 ZION 1 - NUREG-e737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS

}

M44558 F-13 ZION 1 - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE l

'I

{r l

R-1208731-901 REOULATORY INF0RMATION TRACKINO SYSTEM ZION 1 FACILITY (CONTINUATION)

IMPLEMEN7ATION PAGE NO.0 04/

JAC NO.

MPA 0 TITLE N08878 D-14 ZION 1 - REACTOR VESSEL HELD HIRE DEFICIENCY M08849 8-14 ZION 1 - CONTROL ROD OUIDE TUBE NEAR M44630 F-14 ZION 1 - RV AND SV, TESTING M43637 C-14 ZION 1 - SEISMIC QUALIFICATION OF THE AUXILIARY M12282 D-15 ZION 1 - HELB AND CONSEQUENTIAL SYSTEM FAILURE FEEDNATER SYSTEM M46556 F-15 ZION 1 - NUREG-0737, II.E.1.1, AFN SYSTEM EVAL ZION 1 M52285 C-15 ZION 1 - CONTROL OF HEAVY LOADS - PHASE II M59003 C-16 ZION 1 - UTILITY RESPONSES TO STAFF RECOMMENDATIONS (FDLLONUP OF MPASC-10)

M44700 F-16 ZION 1 - NUREG-0737 II.E.1.2.1, AFN SAFETY ORADECONCERNING STEAM OENERATORS COL M12129 B-16 ZION 1 - EMERGENCY PLAN REVIEN AUTO INITIATION M51367 A-17 ZION 1 - INSTRUMENTATION TO FOLLON THE COURSE M11228 B-17 ZION 1 - NYDRAULIC SNUBBERS UPORADE TECH SPECS OF AN ACCIDENT (RG 1.97)

M44739 F-17 ZION 1 - NUREG-0737 II.E.1.2.2, AFM SAFETY ORADE M43815 D-17 ZION 1 - TECHNICAL SPECIFICATIONS DEFINING FLON INDICATION M44826 F-18 ZION 1 - NUREG-0737 II.E.4.1.2, DEDICATED '

OPERABILITY FOR SAFETY SYSTEMS M55756 A-18 ZION 1 - TECN. SPECS. AFFECTED BY 50.72 AND 50 73 NYDROGEN PENETRATIONS M55920 D-19 ZION 1 - DIESEL DENERATOR RELIABILITY TECN. SPECS (OL 83-43)

M44897 F-19 ZION 1 - NUREG-0737 II.E.4.2, CONTAINMENT (GL 84-15)

M10278 B-20 ZION 1 - CONTAINMENT LEAKAGE DUE TO SEAT DETERIORATION ISOLATION DEPENDABILITY "M59160 A-20 ZION 1 - 10CFR50.62 OPERATINO REACTOR REVIENS M44968 F-20 ZION 1 - NUREG-0737 II.F.1.1, NOBLE GAS M45039 F-21 ZION 1 - NUREG-0737 II.F.1.2, IODINE /

MONITOR M60777 A-21 ZION 1 - 10CFR50.61 - PRESSURIZER THERMAL SHOCK RULE PARTICULATE SAMPLING

~

REQUIRENENTS, PHASE 1

il 1..

[

~

R-1208731-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM FAC1LITY PAGE NO ZION 1 IMPLEMENTATION (CONTINUATION)

C' TAC NO.

MPA 0 TITLE M11144 B-21 ZION 1-LOSS OF 125 V DC BUS VOLTAGE M08864 B-22 ZION 1 - MECNANICAL SNUBBERS M45110 F-22 ZION 1 - NUREG-07J7 II.F.1.3, CONTAINMENT MIGH RANGE MONITOR M47647 F-23 ZION 1 - NUREO 0737 ITEM II F1.4 CONTAINMENT PRE *,SURE INSTRUMENT M10061 3-23 ZION 1 - POTENTIAL EQUIPMENT FAILURES ASSOCIATED WITH ORID VOLTAG M10200 3-24 ZION 1 - CONTAINMENT PURGE M47718 F-24 ZION 1 - NUREG 0737 ITEM II F1.5 CONTAINMENT' MATER LEVEL MONITOR M42566 B-24 ZION 1 - LONG TERM REVIEN CONTAINMENT PURGE A'ND VENT M47789 F-25 (3-24)

ZION 1 - NUREG 0737 ITEM II F1.6 CONTAINMENT NYDROGEN MOIIITOR M45180 F-26 ZION 1 - NUREG-0737 II.F.2.3, INADEQUATE CORE M10239 B-26 C0 CLING INSTRUMENTATION ZION 1 - INADVERTENT SAFETY INJECTION DURING COOLDONN (PNR'S)

M46913 F-30 ZION 1 - II K2.13 THERMAL MECHANICAL REPORT M47827 F-33 ZION 1 - NUREG 0737 ! TEM II K2.17 POTENTIAL M45257 F-36 ZION 1 - NUREG-0737 II.K.3.1, AUTO PORY FOR VOIDING IN kCS

  1. 45303 F-37 ISOLATION ZION 1 - NUREG-0737 II.K.3.2, REPORT ON PORV M45390 F-38 FAILURES ZION 1 - NUREG-0737 II.K.3.3, REPORT ON

' ' M08688 RV/SV FAILURES B-39 ZION 1 - PWR PRESSURE-TEMPERATURE TECH SPECS M45420 F-39 ZION 1 - NUREG-0737 II.K.3.5, AUTO TRIP OF RCPS M45469 F-40 ZION 1 - NUREG-0737 II.K.3.9, PID "M45499 F-41 CONTROLLER ZION 1 - NUREG-0737 II.K.3.10, ANTICIPATORY TRIP M11071 3-41 MODIFICATIONS ZION 1 - FIRE PROTECTION SUPPLEMENT 02 s'

M11718 B-42 ZION 1 - THREE MILE ISLAND FOLLON UP NORK M45529 F-42 ZION 1 - NUREG-0737 II.K.3.12, ANTICIPATORY TRIP

~

DN TURBINE TRIP

II 7-

,[

}

R-1298731-901 l

R E O U L*A T 0 R Y INF0RMATION TRACKINO SYSTEM PA0E NO.i FACILITY ZION 1 IMPLEMENTATION i

(CONTINUATION) 04s j

TAC NO.

MPA.9 TITLE M43159 B-43 ZION 1 - PHR FEEDWATER LINE CRACKS LONO TERM CORRECTIVE ACTION M11782 D-43 ZION 1-FEEDHATER LINE CRACKS i

M12433 3-44 ZION 1-LESSONS LEARNED IMFLEMENTATION 5

M30099 B-44 ZION 1-2.1.7.3 CONTROL ORADE AUX FEED l

M30100 3-44 FLON INDICATION ZION 1-2.1.5 A,C DEDICATED N2 CONTROL ZION 1-2.1.1. EMER. PONER SUPPLY PORV/

PENETRATIONS 8 RECOMBINER PROCEDURE j

M30101 3-44 i

M39102 3-44 ZION 1-2.2.2 A,B,C CONTROL ROOM ACCESS. TSC,'~.

BLOCR VALVE, PER HEATER S LEVEL OPERATIONAL SUPPORT CENTER M39193 3-44 ZION 1-2.2.1 A,B,C SHIFT SUPER. RESP.,

STA, TURNOVER PROCEDURES i

M30104

~ B-44 ZION 1-2.1.8.C IMPROVED IODINE INST.

M30105 B-44 ZION 1-2,1.B.B HION RANGE RADIATION MONITORS M30106 B-44 ZION 1-2.1.8.A POST ACCIDENT SAMPLING M39107 B-44 4

ZION 1-2.1.6.3 SHIELDING REVIEN

{

M30196 3-44 ~

ZION 1-2.1.6.A SYSTEMS INTEGRITY FOR HION.

RADIDACTIVITY M39199 B-44 ZION 1-2.1.4 DIVERSE CONTAINMENT ISOLATION M39110 3-44 ZION 1-2.1.3.3 INST. FOR CORE COOLING (INCN SURC00 LING METER)

M39111 3-44 ZION 1-2.1.3.A DIRECT INDICATION OF VALVE POSITION s ' '

ACTION M39112 B-44 I

ZION 1-2.1.2 RELIEF S SAFETY VALVE TESTING M12942 3-45 ZION 1 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES M12587 B-46 ZION 1 - ANALYSIS OF TURBINE DISC CRACKS

{

"M45677 F-47 i

ZION 1 - NUREG-0737 II.K.3.17, ECC SYSTEM OUTAGES M12692 3-47 ZION 1 -ECCS CLAD SHELLING S RUPTURE f

M13907 B-48 ZION 1.- ADESUACY OF STATION ELECTRIC DISTRIBUTION k

M11883 B-52 SYSTEMS VOLTAGES ZION 1 - REVIEN OF SAFETY ASPECTS OF INADVERTENT SAFETY SYSTEM ACTUATIONS DURING SURVEILLANCE TES

l

  • I

~

1 l

l

+

R-1298731-901 R E O U l' A T 0 R Y INF0RMATION TRACKINO 5YSTEM FACILITY PAGE NO ZION 1 IMPLEMENTATION i

k (CONTINUATION) 8 1

TAC NO.

MPA 9 TITLE M44439 F-53 ZION 1 - NUREO 9757, II.K.3.25, PONER ON PUMP SEALS

{

M42195 B-57 ZION 1 - DECAY HEAT REMOVAL j

M45873 F-57 ZION 1 - NUREG-0737 II.K.3.30, SB LOCA CAPABILITY TECH SPECS

}

M48214 F-58 OUTLINE ZION 1 -NUREO 5737 II.K.3.31 COMPLIANCE NITN M42871 3-59 IS CFR 58.46 ZION 1 - MASONRY MALL DESION. RESPONSE TO IE BULLETIN I

M42472 3-68 80-11 ZION 1 - ENVIR0lWIENTAL QUALIFICATION OF SAFETY I

i M2716 B-61

(

ZION 1 - IE BULLETIN 79-27, LOSS OF NON CLAS5 IE RELATED ELECTRICAL EQUIPMENT (80-CLI-2 M42788 B-62 ZION 1 - ESF RESET CONTROL DESION DEFICIENCY - ISE INST 4 CONTR. POWER. REV. 8 EVAL. RESP M43499 B-43 BULLETIN 89-06 ZION UNIT 1 - STATION BLACROUT PROCEDUI'tES M45992 F-63 8 TRAININO ZION 1 - NUREG-9737 III.A.1.2. TECNIIICAL M46964 F-64 ZION 1 - IIUREG-9737 III. A.1.2, OPERATIO90AL SUPPORT CENTER l

M46136 F-65 ZION 1 - NUREG-9737 III. A.1.2, EMERGEllCY SUPPORT CENTER s

M47187 B-66 ZION 1 NATURAL CIRCULATIOII COOLDOINt (GENERIC LTR OPERATIONS FACILITY 1946298 F-66 81-21)

ZION 1 - III.A.2 NUCLEAR DATA LINK M46289 F-67 DATA ZION 1 - III. A.2.1 EMEltOENCY PLAN UPORADE TO MEET RULE M46351 F-64 4

ZION 1 - NUREG-0737 III.A.2.2, METEOROLOGICAL 1

3-

' 0046869 DATA UPoltADE B-69 ZIoll 1 - PMR MSLB NITH CONTINUED FEEDNATER ADDITION 4

{

M46422 F-69 Z1011 1 - NUltE0-8737 III.D.3.3, IIIPLANT M46555 F-70 ZION 1 - NUREG-0737, III.D.3.4, C001 TROL ROOM RADIO. TION MONITORING i

"M46643 B-78 MARITABILITY ZION 1 - MOIIITORIII0 0F FATIOUE TRANSIENT LIMITS f

M56182 F-71 ZION 1 - I.D.1.2 DETAILED CollTROL ROOM DESIGN F0ft THE REACTOR COOLANT SYST'EM l

M49769 B-72 ZION 1 - "NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 REVIEN SUP91ARY REPORT - F-71 i

j M52814 B-76 82-16 OR 83-02)*

ZION 1

. ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURL':

i g

s

88 "N '? "'!

E,

,,/

R-1208731-001 REOULAT0RY INF0RMATION TRACRINO SYSTEM FACILITY I M P L E.M E N T A T I O N PAGE NO ZION 1 (CONTINUATION) es JAC NO.

MPA_t TITLE i

M52895 B-77 ZION 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR M52976 3-78 ZION 1 - ITEMS 3.1.1 8 3.1.2 -

INTERFACE - RTS COMPONENTS POST MAINTENANCE TESTING M53057 B-79 ZION 1-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CNANGES TO PROCEDURES / VENDOR RECOMMENDA M53110 B-80 ZION 1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED TECM SPECS-RTS COMPONENTS M53163 3-81 MODIFICATIONS ZION 1 - ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE M53205 3-82 ZION 1 - ITEM 4.3 - AUTOAMTIC ACTUATION OF SHUNT TRIP PROGRAM FOR REACTOR TRIP BREAK M54580 B-83 ZION 1 - TECHNICAL SPECIFICATIONS COVERED BY'0EMERIC ATTACNMENT FOR H AND B & N PLANTS M53648 B-85 LETTERS 83-36, 83-37 FOR NUREG-0737 ZION ITEM 1.2 - POST TRIP REVIEM-DATA AND INfORMATION M53731 5-86 CAPABILITY ZION 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR M53814 5-87 ZION 1-ITEMS 3.2.1 4 3.2.2 -

INTERFACE - ALL SR COMPONENTS POST-MAINT TESTING M53897 B-88 ZION 1 - ITEM 3.2.3 - POST-MAINTENANCE TESTINOPROCEDURES ANO VENDOR RECOMMEN M53950 3-89 ZION 1 - ITEMS 4.2.3 4 4.2.4-PP.EVENTATIVE MAINTENANCE

-CNANGES TO TECH. SPEC. - ALL SR COMP M55587 B-90 ZION 1 - ITEN 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT PR00 RAM FOR RX TRIP BREAKERS -

M54124 3-92 ZION ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TRIP FOR H AND 88N PLANTS - TECH SPECS M54041 B-93 ZION 1 - ITEMS 4.5.2 8 4.5.3 -

CAPABILITY REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVE 9

e 0

1 l

1

~

se

{

R-120873f-est l

4 REOULki0RY INF0RMATION TRACKINO SY$ TEM l

FACILITY l

IMPLEMENTATION PAGE NO.

FACILITY: ZION 2 04/

1 PLANT LOCATION: 40 MI N OF CHICA00, ILL j

DOCKET NUMBER:

858-99394 LICENSED PONER: 3250 IG4T 3

ARCN/ ENGINEER: SSL DESIGN POWER:

j IE INSPECTOR:

M. NOLZMER NSSS VENDOR:

NEST BRANCN CHIEF:

1949 MWE PROJECT MANAGER: J. NORRIS S. VARGA LIC. ASSISTANT:

L. PARRISH l.

IAC MO._

IFA _3 TITLE M07035 A-01 ZION 2 - INSERVICE INSPECTION 9

MS7909 B-91

-ZION 2 - DIESEL DENERATOR LOCKOUT k

M8864 E-91 k

ZION 2 - SPENT FUEL POOL MOD M98259 C-01 ZION 2 - PMR SECONDARY CHEMISTRY MONITORIl00 REQUIREMENTS M40967 F-91 ZION 2 - NUREG-9737 1.A.1.1 STA LONO TERM

- GENERIC M49684 0-81 ZION 2 - REACTOR COOLANT PUMP TRIP RE9UIREMENTS Me8131 A-92 ZION 2 - APPENDIX I TECM SPEC IMPLEMENTATION REVIEN M44138 F-82 ZION 2 - 100REO-9757 1.A.1.3.1, SHIFT MAllNING MOS871 3-92 ZIO90 2 - FIRE PROTECTION OVERTIME LIMITS M8852 E-02 ZION 2 - BROPPED FUEL CASK M7882 D-92 ZION 2 - ECCS ZIRC CLAD MODEL ERROR i

M7859 D-03 ZION 2 PRESSURIZER NEATUP RATE MS8867 A-03

!, MS8489 ZION 2 - PHYSICAL SECURITY PROGRAM B-03 ZION 2 - OENERIC - Plet MODERATOR DILUTION

\\

i M44209 F-03 ZION 2 - NUREG-4737 I.A.2.1.4, UPORADING OF R0

\\

{ MS8853 C-94 ZION 2 - FILTER TECM SPECS AND SRO TRAINING

'M98863 A-94 ZION 2 - CONTAINMENT LEAK TESTING - APP. J (GENERIC)

! M88342 3-04

! M44280 ZION 2 - REACTOR VESSEL OVERPRESSURE PROTECTION F

F-84 ZION 2 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE M44356 F-05 ZION 2 - PROCEDURES GENERATION PACKAGE REVIEW COOLING OUIDELINES (NUREO 0737 $UPP/1) i I

i

I R-1288731-001 REOUL'ATORY INF0RMATION ZION 2 FACILITY TRACRINO

$Y$ TEM (CONTINUATION)

IMPLEMENTATION PAGE N0 0 IAC NO.

MPA 0 TITLE 00 M08844 E-OS ZION 2 - N-1 LOOP OPERATION M68875 C-06 ZION 2 - PWR PUMP & S/0 SUPPORTS - LAMELLAR TE M47264 F-86 ZION 2 - FEEDBACR 9F OPERATING EXPERIENCE ARING 8 FRACTURE TOUONNESS M47336 F-07 ZION 2 - CORRECT PERFORMANCE OF OPERATING (AP I.C.5)

MC8877 C-07 ZION 2 - FUEL HANDLING ACCIDENT INSIDE CONTAIN ACTIVITIES (API.C.6)

M07832 3-07 ZION 2 - STEAM GENERATOR FEEDWATER FLON INSTAB MENT M08182 A-07 ZION 2 - FRACTURE TOUONNESS REQUIREMENTS APPE ILITY M68176 B-08 ZION 2 - PNR HPSI-LPSI FLON RESISTANCE ND 0 M51218 F-88

- GENERIC ZION 2 - I.D.1.1 - DETAILED CONTROL ROON DESIG M51298 F-09 ZION 2 - I.D.2. SAFETY PARAMETER DISPLAY SYST PROGRAM PLAN F-08 N REVIEN N08989 A-09 ZION 2 - PRESSURE VESSEL BELTLINE MATERIAL SUR EM M68476 C-09 ZION 2 - PHR AUXILIARY FEEDNATER PUMPS (GL 4 MATERIAL SURVEILLANCE VEILLANCE N07838 B-09 ZION 2 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM

)

M19742 A-10 ZION 2 - CONTINGENCY PLAN REVIEN M68873 D-10 ZION 2 - REVIEN OF ASYMMETRIC LOCA LOADS SUBMIT M08093 C-10 ZION 2 -CONTROL OF HEAVY LOADS OVER SPENT FUE TAL M44418 F-10 ZION 2 - NUREG-0737 II.B.1, RCS HION POINT (NUREG 0612)

L POOL M47987 F-11 ZION 2 - PLANT SHIELDINO MODIFICATIONS (11 B 2 VENTS M19748 A-11

'"H10005 ZION 2 - GUARD TRAINING PLAN REVIEN

.. 2) l D-11 ZION 2 - ENHANCED FISSION PRODUCT RELEASE FOR H M18744 A-12 ZION 2 - VITAL AREA ANALYSIS IGH BURNUP LHR FUEL M44488 F-12 ZION 2 - NUREG-0737 II.B.3.2, POST ACCIDENT F

M44559 F-13 ZION 2 - HUREG-0737 II.B.4.1, TRAINING FOR SAMPLING MODIFICATIONS 8

MITIGATING CORE

...am g

R-1208731-001 REOULAT0RY INF0RMATION ZION 2 FAC1LITY TRACKINO (CONTINUATION)

IMPLEMENTATION SYSTEM PAGE No c IAC NO._

MPA 0 TITL E SC M08879 D-14 ZION 2 - REACTOR VESSEL NELD HIRE M08870 5-14 ZION 2 - CONTROL ROD GUIDE TUBE NEAR M44631 F-14 DEFICIENCY M43658 ZION 2 - RV AND SV. TESTING C-14 ZION 2 - SEISMIC QUALIFICATION OF THE AU M12283 D-15 ZION 2 - NELB AND CONSEQUENTIAL SYSTEM FAI FEEDNATER SYSTEM XILIARY M46558 F-15 ZION 2 - NUREG-0737, II.E.1.1, AFM SYSTE LURE M52286 ZION 2 C-15 ZION 2 - CONTROL OF HEAVY LOADS - PHASE 1 M EVAL M59004 C-16 ZION 2 - UTILITY RESPONSES TO STAFF RECO (FOLLONUP OF MPASC-10) 1 M44701 F-16 ZION 2 - NUREG-0737 II.E.1.2.1, AFM SAF5TYCONCERNING STEAM GENERATORS MMENDATIONS M12130 3-16 ZION 2 - EMERGENCY PLAN REVIEN GRADE M51368 A-17 AUTO INITIATION

- 2)

ZION 2 - INSTRUMENTATION TO FOLLON THE C M11229 B-17 ZION 2 - NYDRAULIC SNUBBERS UPGRADE TEC OF AN ACCIDENT (RG 1.97)

OURSE M44740 F-17 ZION 2 - NUREG-0737 II.E.1.2.2, AFN SAFE M SPECS M43016 D-17 ZION 2 - TECHNICAL SPECIFICATIONS DEFININd FLON INDICATION TY GRADE M44827 F-18 ZION 2 - NUREG-0737 II.E.4.1.2. DEDICATE OPERABILITY FOR SAFETY SYSTEMS M55757 A-18 ZION 2 - TECH. SPECS. AFFECTED BY 50 72 A HYDROGEN PENETRATIONS D*

' M55921 D-19 ZION 2 - DIESEL GENERATOR RELIABILITY TECN ND 50.73 M44898 (GL 83-43)

F-19 ZION 2 - NUREG-0737 II.E.4.2, CONTAINMEN

. SPECS.

M19279 B-20 (OL 84-15)

ZION 2 - CONTAINMENT LEAKAGE DUE TO SEAT T

"M59161 ZION 2 - 10CFR50.62 OPERATING REACTOR REVDETERIORATION ISOLATION DEPENDAEILITY A-20 M44969 F-20 ZION 2 - NUREG-0737 II.F.1.1, NOBLE GAS IENS M45040 F-21 ZION 2 - NUREG-0737 II.F.1.2, IODINE /

M60778 MONITOR A-21 ZION 2 - 10CFR50.61, PRESSURIZED THERMALPARTICULATE SAMPLING SHOCK RULE REQUIREMENTS, PHASE I

~~

T

{

R-1298731-991 REotiLAT.0RY

\\

INF0RMATION ZION 2

\\

(CONTINUATION) FACILITY TRACKINO IMPLEMENTATION

$YSTEM j

TAC NO.

i

?tPA.3 TITIf PAGE M11145 5-21 ZION 2 LOSS OF 125V DC SUS VOLT Me8845 3-22 ZION 2 - MECNAMICAL SNUSSERS AGE M45111 F-22 ZION 2 - NUREG-9737 II.F 1 3 M47648

\\

F-23 ZION 2 - NUREO 9737 ITEM II F.., CONTAINMENT HION M19942 3-23 ZION 2 - POTENTIAL E9UIPMENT 1.4 CONTAINMENT RANGE MONITOR M19199

{

B-24 ZION 2 - CONTAINMENT PtNt0E FAILURES ASSOCIATED MITH ORID PRES $URE I M47719 F-24 ZION 2 - NUREO 8737 ITEM II F1 i

VOLTAGE M42567 S-24 ZION 2 - LONO TERM REVIEN CONT 5 CONTAINMENT.

j M47798 I

F-25 ZION 2 - NURES 9737 ITEM II F AllWEENT PtNt0E AND VENT NATER LEVEL MONITOR M45181 F-26 ZION 2 - NUREG-8737 II F 2 3 1.6 CONTAllIMENT (B-24)

_M19248 S-26 ZION 2 - INADVERTENT SAFETY INJ.. IMADE90 ATE CORE HYDROGEN MONITOR M46914 F-38 k

ZION 2 - II K2.13 TMERMAL MEC ECTION DURING COOLDONN (PHR'SCOOLING IN M49423 3-32

\\

M47828 ZION 2 - BLOCKING SI SIONAL E' MANICAL REPORT

)

F-33 M45258 ZION 2 - NUREO 9737 ITEM II K2, RING C00i.DONN F-36 k

M45394 ZION 2 - NUREG-8737 II K 3 1

.17 POTENTIAL F-37 ZION 2 - NUREG-9737 II.K 3 2, AUTO PORV FOR VOIDING IN RCS M45391 F-38 ZION 2 - NUREG-9737 II K 3 3, REPORT ON PORVISOLATION i M08489 B-39 ZION 2 - PNR PRESSURE-TEMPEAAT

, REPORT ON FAILURES M45421 F-39

  • M45470 ZION 2 - NUREG-9737 II.K 3 5 URE TECN SPECS RV/SV FAILURES F-48 ZION 2 - NUREG-8737 II K 3 9, AUTO TRIP OF M45598 F-41 ZION 2 - NUREO-0737 II K 3 19 PID RCPS M11972 5-41 ZION 2 - FIRE PROTECTION SER, ANTICIPATORY TRIP CONTROLLER

~.11719 5-42

- ZION 2 - TNREE MILE ISLANO FOLLOW USUPPLEMENT 92 MODIFICATIONS s'

P MORK

,s s--

j at

-- - g

.i l

l R-1208731'-801 R E O U L A*T 0 R Y INF0RMATION TRACKINO 3YSTEM PAGE 100. 8 l

FACILITY IMPLEMENTATION ZION 2 (CONTINUATION) 34/1{

i TAC NO.

frA 9 TITLE M45558 F-st2 ZION 2 - NUREG-0737 II.K.3.12, ANTICIPATURY TRIP DN TURBINE TRIP I

M43160 3-43 ZION 2 - PNR FEERNATER LINE CRACKS LONG TERM CORRECTIVE ACTION i

M11783 3-43 ZION 2-FEERNATER LINE CRACRS i

M12434 3-44 ZION 2 - LESSONS LEARNED IDFLEMENTATION ~ ~

M39117 B-44 ZION 2-2.2.1 A,3,C SHIFT SUPER. RESP.,

STA, TURNOVER PROCEDURES 1

M38118 B ZION 2-2.1.8.C IMPROVE 3 IODINE INST.

M39119 B-44 ZION 2-2.1.8,3 HION RA800E RADIATION MONITORS

,M30128 3-44 ZION 2-2.1.8.A POST ACCIDENT SAMPLING M39121 3-44 ZION 2-2.1.6.3 SHIELDING REVIEN M39122 3-44 ZION 2-2.1.6.A SYSTEMS INTEORITY FOR HION RADI0 ACTIVITY

,M39123 3-44 ZION 2-2.1.4 DIVERSE CONTAINMENT ISOLATIGli.

l i

M39124 5-44 ZION 2-2.1.3.3 INST. FOR CORE COOLING j

(INCN SUSC00 LING METER)

M38125 3-44 ZION 2-2.1.~3.A DIRECT INDICATION OF VALVE POSITION ACTION e,-

M30126 B-44 ZION 2-2.1.2 RELIEF S SAFETY VALVE TESTING

}

M38113 3-44 ZION 2-2.1.7.3 CONTROL ORADE AUX FEED 1

FLOW INDICATION j

M30114 3-44 ZION 2-2,1.5 A,C DEDICATED M2 CONTROL PENETRATIONS S RECOMBINER PROCEDURE

{'M3e115 B-44 ZION 2-2.1.1. EMER. PONER SUPPLY PORV/

I BLOCK VALVE, PER NEATER & LEVEL M38116 B-44 ZION 2-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, OPERATIONAL SUPPORT CENTER l

M12943 3-45 ZION 2 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES Mi23 3 3-4.

ZION 2 - ANAtYSIS Or TURBINE nISC CRACKS M126:3 3-47 ZION 2 -ECCS CLAD $NELLING S RUPTURE j

M45678 F-47 ZION 2 - NURE0-8737 II.K.3.17, ECC SYSTEM OUTAGES l

!.M13998 ZION 2 - ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS B-48 VOLTAGES I

i i

1

3A-

,y R-1204731'-881 l

REOULAT.0RY INF0mMATION TRACKINO 5Y$ TEM ZION 2 FAC1LITY (CONTINUATION)

IMPLEMENTATION PAGE N0. 8 e4/)

JAC No.

MPA 8 TITLE M11884 3-52 ZION 2 - REVIEW OF SAFETY ASPECTS OF INADVERTENT SAFETY M44448 F-53 ZION 2 - NUREO 0737, II.K.3.25, PONER ON PUMP SEALS ACTUATIONS DURING SURVEILLANCE TESTI M2196 3-57 ZION 2 - DECAY NEA,T REMOVAL M5874 F-57 ZION 2 - NUREG-5737 II.K.3.30, SB LOCA CAPABILITY TECH SPECS M8215 F-54 OUTLINE ZION 2 -NUREG 0737 II.K.3.31 COMPLIANCE MITH M42872 3-53 10 CFR 58.44 ZION 2 - MASONRY MALL DESION. RESPONSE TO IE BULLETIN M2473 3-68 88-11 ZION 2 - ENVIRONMENTAL trUALIFICATION OF SAFETY.

M2717 B-61 ZION 2 - IE BULLETIN 79-27, LOSS OF NON CLASS IE RELATED ELECTRICAL EQUIPMENT (80-CL j

M2789 B-62 ZION 2 - ESF RESET CONTROL DESIGN DEFICfENCY - ISE INST 8 CONTR. PONER. REV. 8 EVAL. RE M43900 3-63 ZION UNIT 2 - STATION BLACKOUT PROCEDURES SULLETIN 88-04 M5993 F-63 ZION 2 - NUREG-0737 III.A.1.2, TECHNICAL S TRAINING M46965 F-64 ZION 2 - NUREG-4737 III.A.1.2, OPERATIONAL SUPPORT CENTER M46137 F-45 ZION 2 - NUREG-0737 III.A.1.2, EMER0ENCY SUPPORT CENTER M7184 B-66 ZION E NATURAL CIRCULATION COOLDONN (GENERIC LTR OPERATIONS FACILITY M46299 F-64 81-21)

ZION 2 - III.A.2 NUCLEAR DATA LINK M46281 F-67 DATA SION 2 - III.A.2.1 EMER0ENCY PLAN UP0kADE TO MEET RULE M46352 F-68 ZION 2 - NUREG-9737 III.A.2.2, METEOROLOGICAL M6870 3-69 DATA UPORADE POINT BEACM 2 - EXTENSION OF NUREG-9737 SUPPLEMENT 1 ORDER M46423 F-69 ZION 2 - NUREG-9737 III.D.3.3, INPLANT DATES (SAS, REO. OUIDE i.97 AND EOF)

"M6557 F-70 ZION 2 - NUREG-9737,III.D.3.4 CONTROL ROOM RADIATION MONITORING M46644 3-78 NABITABILITY ZION 2 - MONITORING OF FATIOUE TRANSIENT LIMITS J

M56183 F-71 ZION 2 - I.D.1.2 DETAILED CONTROL ROOM DESIGN FOR THE REACTOR COOLANT SYSTEM M49778 B-72 ZION 2 - "NUREO 0737 TECM SPECS (GENERIC LETTER 82-16 REVIEN SUMNARY REPORT - F-71 82-16 OR 83-02)"

- - - - - - -i

II r

~

-1 l

R-titi8731-901 REOUL5T1RY INF0RMATIeN TRACKINO 3YSTEM PAGE NO.

FACILITY I M P L E M E N T A T I.O l? -

84/.

ZION 2 (CONTINUATION)

.\\

TAC NO.

MPA 9 TITLE MS2815 B-76 l

ZION 2 - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION

't AND PROCEDURES 3

M52896 3-77 ZION 2 - ITEM 2.1 - E9UIPMENT CLASSIFICATION AND VENDOR l

INTERFACE - RTS COMPONENTS

{

M52977 B-78 ZION 2 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING ZION 2-tTEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO PROCEDURES / VENDOR RECOMMENDATIONS f

M53054 3-79 I

TECM SPECS-RTS COMPONENTS M53111 B-88 ZION 2 - i'EACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATES MODIFICATIONS M53144 3-81 ZION 2 - ITL*$ 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE ZION 2 - ITEM 4.3 - AUTOAMTIC ACTUATION OF SilUNT TRIP PROGRAM FOR REACTOR TRIP BREAKERS - MAIN MS3206 3-82 ATTACHMENT FOR M AND B 8 M PLANTS M54581 3-83 ZION 2 - TECHNICAL SPECIFICATIONS COVERED BY GENERICLETTERS 83-36, 83-37 FOR NUREG-8737 M53649 E-85 ZION 2 - ITEM 1.2 - POST TRIP REVIEM-Be.TA AND INFORMATION f

M53732 3-86 CAPABILITY ZION 2 - ITEM 2.2 - E90IPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53815 3-87 ZION 2-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING ZION 2 - ITEM 3.2.3 - POST-MAINTEMAIICE TESTING PROCEDURES AND VENDOR REC 099fENDATIONS

'ALL SR COMPI M53898 B-88

-CHAIIGES TO TECH. SPEC. - ALL SR COMPONENTS l

M53951 3-89 ZIOff 2 - ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTEIIANCE ZION 2 - ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SMUllT PROGRAM FOR RX TRIP BREAKERS - LIFE TESTIN

{

M55388 E-90 TRIP FOR M AND B8M PLANTS - TECM SPECS M54125 3-92 ZIOll 2 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY M54942 3-93 ZION 2 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM 4

FUIICTIONAL TESTING - ALTERNATIVES S TEST IN t

=

l