Requests Generic Issues Info Updates & Completion Dates for Encl Regulatory Info Tracking Sys List,By 860331,to Aid in long-term Program to Improve Documentation Re Implementation of Approved Regulatory Improvements
ML20197G947
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/01/1986
From: Norris J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
References
TASK-***, TASK-TM NUDOCS 8605190009
Download: ML20197G947 (16)


Text

%

g prl

' May 1, 1986 Docket Nos. 50-295 DISTRIBUTION ket File and 50-304 NRC PDR L PDR Gray File J. Norris C. Vogan OELD E. Jordan B. Grimes J. Partlow ACRS(10) H. Smith Mr. D. L. Farrar S. Scott Director of Nuclear Licensing Commonwealth Edison Company

. Post Office Box 767 Chicago, Illinois 60690 .

Dear Mr. Farrar:

Subject:

IMPLEMENTATION OF GENERIC REQUIREMENTS The Comptroller General in a Report to the Congress cated September'19,1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." .To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.

To assist me in developing this information for Zion Nuclear Power Station Units I and 2, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter

" projected" under the Status column. I do not expect or want a major effort made to obtain percise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented is acceptable. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.

l "

l 8605190009 DR 860501 l p ADOCK 05000295:

PDR l

7 This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

Sincere'y, Jan A. Norris, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A, NRR

Enclosures:

As stated cc: See next page i .

\

PAD-3 N P l D PA -3s C. Vogan d. f opris bs 3 S. V g 01/\/86 C 4 l 'j S 6 ^ L s/</n M'9/< 4 f

13 _

I ,y

- .. ~, . ,

5  !

R-1294731-est R E O U L A't.0 R Y INF0RMATION TRACKINO SYSTEM PAGE 110. 8 FACILITY IMPLEMENTATION

  • 04/1 FACILITY: ZION 1 PLANT LOCATION: 40 MI N OF CHICAGO, ILL

,~

BOCKET NUMBER: 850-89295 LICENSE"3 POWER: 3250 leff ARCH / ENGINEER: SSL DESIGN PGNER: 1040 MNE PROJECT MANAGER: J. NORRIS j IE INSPECTOR: NSSS VENDOR: NEST BRANCH CHIEF: S. VARGA M. NOLZMER LIC. ASSISTANT:

1 .

L. PARRISH 1

! TAC NO. IFA 3 i TITLE j N07553 E-01 i ZION 1 - SPENT FUEL POOL MODIFICATION MD6911 A-01 ZIOli 1 - INSERVICE INSPECTION j MO7998 B-91 ZION 1 - DIESEL OENERATOR LOCROUT M88258 C-91 f ZION 1 - PNR SECONDARY CHEMISTRY MONITORING ltE9UIREMENTS - GENERIC M44964 F-91 '

! ZION 1 - NUREG-9737 I.A.1.1 STA LONG TERM RE9UIREMENTS M49683 0-01

{

ZION 1 - REACTOR COOLAlti PUMP TRIP j M68139 A-92 ZION 1 - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN M44137 F-92 ZION 1 - IOUREG-8737 1. A.1.3.1, SHIFT MAINIING  :

M87881 OVERTIME LIMITS L D-92 ,

ZION 1 - ECCS ZIRC CLAD MODEL ERROR '

l Mr,1852 E-92 i ZION 1 - DROPPED FUEL CASK MS6776 B-92 ZION 1 - FIRE PROTECTION MD6554 A-93 ZI0lt 1 - PHYSICAL SECURITY PROGRAM

  • MS8498 B-03 ZIDH 1 - Phit MODERATOR DILUTIOlt M87178 D-03 ZIOli 1- PRES $UltIZER NEATUP RATE CHA100E FROM 200 DEGREES F/NR TO 109 DEGREES F/NR M44298 F-03 ZIOll 1 - DOUltEG-9737 I. A.2.1.4, UPoltADING OF RO l MS8014 AND SRO TRAINING C-04 ZION 1-FILTER TECH SPECS "M86795 3-94 I

ZION 1 - REACT 0ft VESSEL OVERPRESSINtE PROTECTION **

M04862 A-94 i ZION 1 - CONTAINMENT LEAK TESTIllo - APP. J (GENERIC) 4 M40279 F-84 1 ZION 1 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE M44349 F-35 C00LIllG OUIDELINES

}

ZION 1 - PROCEDURES GENERATION PACKAGE REVIEN

!: (NUREG 0737 SUPP/1) 1 I-

A '

~

] .* a.

i O

R-1298731-Set REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s f FACILITY IMPLEMENTATION 04/(

j ZION 1 (CONTINUATION)

TAC NO. frA B TITLE i M06431 E-05 ZION 1 - N-1 LOOP OPERATION

  • i M08874 C-96 ZION 1 - PHR PUMP S S/0 SUPPORTS - LAMELLAR TEARING S FRACTURE TOUGHNESS l
M47263 F-86 ZION 1 - FEEDBACK 0F OPERATING EXPERIENCE (AP I.C.5)

M47335 F-97 ZION 1 - CORRECT PERFORMANCE OF OPERATING ACTIVITIES CAPI.C.6) i M08876 C-97 ZION 1 - FUEL HANDLING ACCIDENT INSIDE CONATAINMENT N07810 3-97 ZION 1 - STEAM OENERATOR FEEDNATER FLON INSTABILITY

} N06689 A-37 ZION 1 - FRACTURE TOUONNESS RERUIREMENTS APPEND 0 M08175 5-98 ZION 1 - PNR HPSI-LPSI FLON RESISTANCE - GENEitIC '

M51217 F-08 ZION 1 - I.D.1.1 - DETAILED CONTROL ROOM DESION REVIEN PROGRAM PLAN F-98

, M51297 F-89 ZION 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM 1

i M08475 C-09 ZION 1 - PNR AUXILIARY FEEDNATER PUMPS (GL-4)

MS8988 A-99 ZION 1 - PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE MATERIAL SURVEILLANCE i M07837 B-09 ZION 1 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM i M19741 A-10 ZION 1 - CONTINGENCY PLAN REVIEN MS8992 C-18 ZION 1 -CONTROL OF HEAVY LOADS OVER SPENT' FUEL POOL (NUREO 8612) l j MS8872 D-10 ZION 1 - REVIEN OF ASYIO1 ETHIC LOCA LOADS SUBMITTAL j- M44417 F-10 ZION 1 - NUREG-0737 II.D.1, RCS HIGH POINT VENTS j M47986 F-11 ZION 1 - PLANT SHIELDIIIG MODIFICATIONS (11.B.2.2)

', M19739 A-11 ZION 1 - GUARD TRAINING PLAN REVIEW 4

"M10004 D-11 ZION 1 - ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LNR FUEL s' j M18745 A-12 ZION 1 - VITAL AREA ANALYSIS M44087 F-12 ZION 1 - NUREG-e737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS

} M44558 F-13 ZION 1 - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE l  :

'I {r l

R-1208731-901

  • REOULATORY . .

INF0RMATION TRACKINO -

ZION 1 FACILITY SYSTEM (CONTINUATION) IMPLEMEN7ATION PAGE NO.0 04/

JAC NO. MPA 0 _

TITLE N08878 D-14 M08849 8-14 ZION 1 - REACTOR VESSEL HELD HIRE DEFICIENCY .

M44630 F-14 ZION 1 - CONTROL ROD OUIDE TUBE NEAR ZION 1 - RV AND SV, TESTING M43637 C-14 M12282 D-15 ZION 1 - SEISMIC QUALIFICATION OF THE AUXILIARY FEEDNATER SYSTEM M46556 F-15 ZION 1 - HELB AND CONSEQUENTIAL SYSTEM ZION 1 FAILURE M52285 C-15 ZION 1 - NUREG-0737, II.E.1.1, AFN SYSTEM EVAL M59003 C-16 ZION 1 - CONTROL OF HEAVY LOADS .- - PHASE II M44700 F-16 ZION 1 - UTILITY RESPONSES TO STAFF (FDLLONUP RECOMMENDATIONS OF MPASC-10)

M12129 B-16 ZION 1 - NUREG-0737 II.E.1.2.1, AFN SAFETY ORADE CONCERNING STEAM OENERATORS COL ZION 1 - EMERGENCY PLAN REVIEN AUTO INITIATION M51367 A-17 M11228 B-17 ZION 1 - INSTRUMENTATION TO FOLLON THE COURSE ,

M44739 F-17 ZION 1 - NYDRAULIC SNUBBERS UPORADEOFTECH AN ACCIDENT SPECS (RG 1.97)

M43815 D-17 ZION 1 - NUREG-0737 II.E.1.2.2, AFM SAFETY ORADE '

FLON INDICATION M44826 F-18 ZION 1 - TECHNICAL SPECIFICATIONS DEFINING M55756 ZION 1 - NUREG-0737 II.E.4.1.2, DEDICATED ' OPERABILITY FOR SAFETY SYSTEMS A-18 NYDROGEN PENETRATIONS M55920 D-19 ZION 1 - TECN. SPECS. AFFECTED BY 50.72 . AND 50 73 (OL 83-43)

M44897 F-19 ZION 1 - DIESEL DENERATOR RELIABILITY(GL . TECN.

84-15)

SPECS M10278 ZION 1 - NUREG-0737 II.E.4.2, CONTAINMENT B-20 "M59160 A-20 ZION 1 - CONTAINMENT LEAKAGE DUE ISOLATION TO SEAT DEPENDABILITY DETERIORATION M44968 F-20 ZION 1 - 10CFR50.62 OPERATINO REACTOR REVIENS M45039 ZION 1 - NUREG-0737 II.F.1.1, NOBLE GAS **

F-21 ZION 1 - NUREG-0737 II.F.1.2, IODINE / MONITOR M60777 A-21

~

PARTICULATE SAMPLING ZION 1 - 10CFR50.61 - PRESSURIZER THERMAL SHOCK RULE REQUIRENENTS, PHASE 1

il 1.. [ ~ '

R-1208731-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM ZION 1 FAC1LITY IMPLEMENTATION PAGE NO (CONTINUATION) C' TAC NO. MPA 0 TITLE M11144 B-21 ZION 1- LOSS OF 125 V DC BUS VOLTAGE M08864 B-22 ZION 1 - MECNANICAL SNUBBERS M45110 F-22 ZION 1 - NUREG-07J7 II.F.1.3, CONTAINMENT MIGH M47647 F-23 RANGE MONITOR M10061 ZION 1 - NUREO 0737 ITEM II F1.4 CONTAINMENT 3-23 PRE *,SURE INSTRUMENT M10200 3-24 ZION 1 - POTENTIAL EQUIPMENT FAILURES ASSOCIATED WITH ORID VOLTA ZION 1 - CONTAINMENT PURGE M47718 F-24 M42566 ZION 1 - NUREG 0737 ITEM II F1.5 CONTAINMENT' B-24 MATER LEVEL MONITOR M47789 F-25 ZION 1 - LONG TERM REVIEN CONTAINMENT PURGE A'ND VENT (3-24)

M45180 ZION 1 - NUREG 0737 ITEM II F1.6 CONTAINMENT F-26 NYDROGEN MOIIITOR ZION 1 - NUREG-0737 II.F.2.3, INADEQUATE CORE M10239 B-26 C0 CLING INSTRUMENTATION M46913 F-30 ZION 1 - INADVERTENT SAFETY INJECTION DURING COOLDONN (PNR'S) .

M47827 ZION 1 - II K2.13 THERMAL MECHANICAL REPORT F-33 '

M45257 ZION 1 - NUREG 0737 ! TEM II K2.17 POTENTIAL F-36 FOR VOIDING IN kCS ZION 1 - NUREG-0737 II.K.3.1, AUTO PORY

  1. 45303 F-37 ISOLATION ZION 1 - NUREG-0737 II.K.3.2, REPORT ON PORV M45390 F-38 FAILURES

' ZION 1 - NUREG-0737 II.K.3.3, REPORT ON

' ' M08688 B-39 RV/SV FAILURES M45420 ZION 1 - PWR PRESSURE-TEMPERATURE TECH SPECS F-39 ZION 1 - NUREG-0737 II.K.3.5, AUTO TRIP OF M45469 F-40 RCPS ZION 1 - NUREG-0737 II.K.3.9, PID "M45499 F-41 CONTROLLER ZION 1 - NUREG-0737 II.K.3.10, ANTICIPATORY TRIP M11071 3-41 MODIFICATIONS ZION 1 - FIRE PROTECTION SUPPLEMENT 02 s'

M11718 B-42 M45529 ZION 1 - THREE MILE ISLAND FOLLON UP NORK F-42

~ ZION 1 - NUREG-0737 II.K.3.12, ANTICIPATORY TRIP DN TURBINE TRIP

II 7- ,[ , .

l

} R-1298731-901 R E O U L*A T 0 R Y INF0RMATION TRACKINO SYSTEM "

PA0E NO.i

ZION 1 FACILITY IMPLEMENTATION i (CONTINUATION) 04s j TAC NO. MPA.9 TITLE M43159 B-43 M11782 D-43 ZION 1 - PHR FEEDWATER LINE CRACKS LONO TERMACTION CORRECTIVE
ZION 1- FEEDHATER LINE CRACKS i M12433 3-44 5 ZION 1-LESSONS LEARNED IMFLEMENTATION M30099 B-44 ZION 1-2.1.7.3 CONTROL ORADE AUX FEED l M30100 3-44 FLON INDICATION ZION 1-2.1.5 A,C DEDICATED N2 CONTROL j M30101 3-44 ZION 1-2.1.1. EMER. PONER SUPPLY PORV/ PENETRATIONS 8 RECOMBINER PROCEDURE i M39102 3-44 BLOCR VALVE, PER HEATER S LEVEL ZION 1-2.2.2 A,B,C CONTROL ROOM ACCESS. TSC,'~.

M39193 3-44 OPERATIONAL SUPPORT CENTER ZION 1-2.2.1 A,B,C SHIFT SUPER. RESP., '

i M30104 ~ B-44 '

STA, TURNOVER PROCEDURES '

ZION 1-2.1.8.C IMPROVED IODINE INST.

M30105 B-44 ZION 1-2,1.B.B HION RANGE RADIATION M30106 B-44 MONITORS ZION 1-2.1.8.A POST ACCIDENT SAMPLING '

4 M39107 B-44 ZION 1-2.1.6.3 SHIELDING REVIEN

{ M30196 3-44 ~ '

M39199 B-44 ZION 1-2.1.6.A SYSTEMS INTEGRITY FOR HION. RADIDACTIVITY ZION 1-2.1.4 DIVERSE CONTAINMENT ISOLATION M39110 3-44 ZION 1-2.1.3.3 INST. FOR CORE COOLING

  • M39111 3-44 (INCN SURC00 LING METER) s ' ' M39112 ZION 1-2.1.3.A DIRECT INDICATION OF VALVE POSITION ACTION B-44 I ZION 1-2.1.2 RELIEF S SAFETY VALVE TESTING M12942 3-45

! M12587 B-46 ZION 1 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES ZION 1 - ANALYSIS OF TURBINE DISC CRACKS

$ "M45677 F-47 i ZION 1 - NUREG-0737 II.K.3.17, ECC SYSTEM

M12692 3-47 OUTAGES **

ZION 1 -ECCS CLAD SHELLING S RUPTURE f M13907 B-48 ZION 1.-

ADESUACY OF STATION ELECTRIC DISTRIBUTION k M11883 B-52 SYSTEMS VOLTAGES ZION 1 - REVIEN OF SAFETY ASPECTS OF INADVERTENT SAFETY

! SYSTEM ACTUATIONS DURING SURVEILLANCE TE

~

l *I -_

.. 1 l . .

l +

R-1298731-901 .

R E O U l' A T 0 R Y INF0RMATION TRACKINO FACILITY 5YSTEM PAGE NO ZION 1 IMPLEMENTATION 8i (CONTINUATION) k 1 TAC NO.

MPA 9 _

TITLE M44439 F-53 ZION 1 - NUREO 9757, II.K.3.25, PONER ON PUMP SEALS

{ M42195 B-57 ZION 1 - DECAY HEAT REMOVAL j M45873 F-57 CAPABILITY TECH SPECS ZION 1 - NUREG-0737 II.K.3.30, SB LOCA

} M48214 F-58 OUTLINE M42871 3-59 ZION 1 -NUREO 5737 II.K.3.31 COMPLIANCE NITN IS CFR 58.46 I M42472 3-68 ZION 1 - MASONRY MALL DESION. RESPONSE TO 80-11 IE BULLETIN i M2716 B-61 ZION 1 - ENVIR0lWIENTAL QUALIFICATION OF SAFETY

( M42788 ZION 1 - IE BULLETIN 79-27, LOSS OF NON CLAS5 IE RELATED ELECTRICAL EQUIPMENT (80-CLI-B-62 INST 4 CONTR. POWER. REV. 8 EVAL. RESP M43499 B-43 ZION 1 - ESF RESET CONTROL DESION DEFICIENCY - ISE BULLETIN 89-06 M45992 ZION UNIT 1 - STATION BLACROUT PROCEDUI'tES F-63 8 TRAININO M46964 ZION 1 - NUREG-9737 III.A.1.2. TECNIIICAL F-64 SUPPORT CENTER l

ZION 1 - IIUREG-9737 III. A.1.2, OPERATIO90AL M46136 F-65 SUPPORT CENTER s .

ZION 1 - NUREG-9737 III. A.1.2, EMERGEllCY M47187 B-66 OPERATIONS FACILITY '

1946298 F-66 ZION 1 NATURAL CIRCULATIOII COOLDOINt (GENERIC 81-21)LTR ZION 1 - III.A.2 NUCLEAR DATA LINK M46289 F-67 DATA 4

1 M46351 F-64 ZION 1 - III. A.2.1 EMEltOENCY PLAN UPORADE TO MEET RULE 3-ZION 1 - NUREG-0737 III.A.2.2, METEOROLOGICAL 4

' 0046869 B-69 DATA UPoltADE

{ M46422 F-69 ZIoll 1 - PMR MSLB NITH CONTINUED FEEDNATER ADDITION Z1011 1 - NUltE0-8737 III.D.3.3, IIIPLANT M46555 F-70 ZION 1 - NUREG-0737, III.D.3.4, C001 TROL ROOM RADIO. TION MONITORING '

i "M46643 B-78 MARITABILITY f M56182 F-71 ZION 1 - MOIIITORIII0 0F FATIOUE TRANSIENT LIMITS F0ft THE REACTOR COOLANT SYST'EM **

l M49769 B-72 ZION 1 - I.D.1.2 DETAILED CollTROL ROOM DESIGN i REVIEN SUP91ARY REPORT - F-71 j M52814 B-76 ZION 1 - "NUREG 0737 TECH SPECS (GENERIC LETTER ZION 1 82-16 82-16 OR 83-02)*

. ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION

!. AND PROCEDURL':

i g ..

s_______ _ _ _ _ . _ _ _ _ _ . _ _ _ - _ _ _

88 "N '? "'! E, , ,/ . .

R-1208731-001 .'

REOULAT0RY INF0RMATION TRACRINO FACILITY I M P L E.M E N T A T I O N SYSTEM PAGE NO ZION 1 (CONTINUATION) es JAC NO. MPA_t TITLE i

M52895 B-77 M52976 3-78 ZION 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR ZION 1 - ITEMS 3.1.1 8 3.1.2 - INTERFACE - RTS COMPONENTS M53057 B-79 POST MAINTENANCE TESTING M53110 B-80 ZION 1-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CNANGES PROCEDURES / TO VENDOR RECOMMENDA TECM SPECS-RTS COMPONENTS M53163 3-81 ZION 1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED MODIFICATIONS ZION 1 - ITEMS 4.2.1 8 4.2.2 -

M53205 3-82 PREVENTATIVE MAINTENANCE M54580 B-83 ZION 1 - ITEM 4.3 - AUTOAMTIC ACTUATION OFPROGRAM SHUNT TRIP FOR REACTOR TRIP BREAK ZION 1 - TECHNICAL SPECIFICATIONS COVERED BY'0EMERIC ATTACNMENT FOR H AND B & N PLANTS M53648 B-85 LETTERS 83-36, 83-37 FOR NUREG-0737 M53731 5-86 ZION ITEM 1.2 - POST TRIP REVIEM-DATA AND CAPABILITY INfORMATION M53814 5-87 ZION 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR ZION 1- ITEMS 3.2.1 4 3.2.2 - POST-MAINT TESTING INTERFACE - ALL SR COMPONENTS M53897 B-88 M53950 3-89 ZION 1 - ITEM 3.2.3 - POST-MAINTENANCE TESTINOPROCEDURES ANO VENDOR RECOMMEN M55587 B-90 ZION 1 - ITEMS 4.2.3 4 4.2.4-PP.EVENTATIVE MAINTENANCE -CNANGES TO TECH. SPEC. - ALL SR COMP M54124 3-92 ZION 1 - ITEN 4.3(TS) - AUTOMATIC ACTUATIONPR00 RAM FOR RX TRIP BREAKERS -

OF SHUNT M54041 ZION ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TRIP FOR H AND 88N PLANTS - TECH SPECS B-93 CAPABILITY ZION 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM 9

FUNCTIONAL TESTING - ALTERNATIVE e

0 1

l 1 ..

~

se

___ { ,

R-120873f-est 4

! REOULki0RY INF0RMATION l l

FACILITY IMPLEMENTATION TRACKINO SY$ TEM l PAGE NO.

FACILITY: ZION 2 1 04/

j PLANT LOCATION:

DOCKET NUMBER: 40 MI N OF CHICA00, ILL 3

858-99394 ARCN/ ENGINEER: SSL LICENSED PONER: 3250 IG4T DESIGN POWER:

j IE INSPECTOR: 1949 MWE M. NOLZMER NSSS VENDOR: NEST PROJECT MANAGER: J. NORRIS BRANCN CHIEF: S. VARGA LIC. ASSISTANT: L. PARRISH l.

IAC MO._ IFA _3 TITLE M07035 A-01 _

MS7909 ZION 2 - INSERVICE INSPECTION 9 B-91 k M8864 -ZION 2 - DIESEL DENERATOR LOCKOUT E-91 k ZION 2 - SPENT FUEL POOL MOD M98259 C-01 ,

M40967 F-91 ZION 2 - PMR SECONDARY CHEMISTRY- GENERIC MONITORIl00 REQUIREMENTS M49684 0-81 ZION 2 - NUREG-9737 1.A.1.1 STA LONO TERM '

RE9UIREMENTS

! Me8131 A-92 ZION 2 - REACTOR COOLANT PUMP TRIP M44138 F-82 ZION 2 - APPENDIX I TECM SPEC IMPLEMENTATION REVIEN MOS871 ZION 2 - 100REO-9757 1.A.1.3.1, SHIFT MAllNING 3-92 ,

ZIO90 2 - FIRE PROTECTION OVERTIME LIMITS M8852 E-02 ZION 2 - BROPPED FUEL CASK '

M7882 D-92 i M7859 D-03 ZION 2 - ECCS ZIRC CLAD MODEL ERROR MS8867 ZION 2 PRESSURIZER NEATUP RATE

  • A-03

!, MS8489 ZION 2 - PHYSICAL SECURITY PROGRAM

\

B-03 i

M44209 F-03 ZION 2 - OENERIC - Plet MODERATOR DILUTION

\

{ MS8853 ZION 2 - NUREG-4737 I.A.2.1.4, UPORADING OF R0 C-94 ZION 2 - FILTER TECM SPECS AND SRO TRAINING

'M98863 A-94

! M88342 3-04 ZION 2 - CONTAINMENT LEAK TESTING - APP. J (GENERIC)

! M44280 ZION 2 - REACTOR VESSEL OVERPRESSURE PROTECTION F F-84 M44356 ZION 2 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE F-05

!: ZION 2 - PROCEDURES GENERATION PACKAGECOOLING REVIEWOUIDELINES (NUREO 0737 $UPP/1) i I

i

I R-1288731-001 REOUL'ATORY INF0RMATION TRACRINO ZION 2 FACILITY $Y$ TEM (CONTINUATION) IMPLEMENTATION PAGE N0 0 IAC NO. MPA 0 00 TITLE M08844 E-OS M68875 C-06 ZION 2 - N-1 LOOP OPERATION ZION 2 - PWR PUMP & S/0 SUPPORTS - LAMELLAR TE M47264 F-86 M47336 F-07 ZION 2 - FEEDBACR 9F OPERATING ARING 8EXPERIENCE FRACTURE TOUONNESS MC8877 C-07 ZION 2 - CORRECT PERFORMANCE OF OPERATING (AP I.C.5)

M07832 3-07 ZION 2 - FUEL HANDLING ACCIDENT MENT INSIDE (API.C.6)

ACTIVITIES CONTAIN M08182 A-07 ZION 2 - STEAM GENERATOR FEEDWATER FLON INSTAB ILITY -

M68176 B-08 ZION 2 - FRACTURE TOUONNESS ND 0 REQUIREMENTS APPE M51218 F-88 ZION 2 - PNR HPSI-LPSI FLON RESISTANCE

- GENERIC M51298 F-09 ZION 2 - I.D.1.1 - DETAILED CONTROL N REVIEN ROON DESIG N08989 A-09 ZION 2 - I.D.2. SAFETY PARAMETER EM DISPLAY PROGRAM PLANSYST F-08 M68476 C-09 ZION 2 - PRESSURE VESSELVEILLANCE BELTLINE MATERIAL SUR '

N07838 B-09 ZION 2 - PHR AUXILIARY FEEDNATER -

) PUMPSSURVEILLANCE MATERIAL (GL 4 M19742 A-10 ZION 2 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM '

M68873 D-10 ZION 2 - CONTINGENCY PLAN REVIEN -

M08093 C-10 ZION 2 - REVIEN OF ASYMMETRIC TAL LOCA LOADS SUBMIT M44418 F-10 ZION 2 -CONTROL OF HEAVYL POOL LOADS OVER SPENT FUE ZION 2 - NUREG-0737 II.B.1, RCS HION POINT M47987 F-11 (NUREG 0612) -

VENTS M19748 A-11 ZION 2 - PLANT SHIELDINO. .MODIFICATIONS 2) (11 B 2

'"H10005 D-11 ZION 2 - GUARD TRAINING PLAN REVIEN l M18744 A-12 ZION 2 - ENHANCED FISSION IGH ZION 2 - VITAL AREA ANALYSIS PRODUCT RELEASE FOR H BURNUP LHR FUEL M44488 F-12 F M44559 F-13 ZION 2 - NUREG-0737 II.B.3.2, POST ACCIDENT 8 ZION 2 - HUREG-0737 II.B.4.1, TRAINING FOR SAMPLING MODIFICATIONS MITIGATING CORE

.. , ...am g

R-1208731-001 REOULAT0RY ZION 2 INF0RMATION TRACKINO (CONTINUATION)

FAC1LITY SYSTEM IMPLEMENTATION PAGE No c IAC NO._ MPA 0 _

SC M08879 TITL E D-14 M08870 5-14 ZION 2 - REACTOR VESSEL NELD HIRE _

M44631 F-14 ZION 2 - CONTROL ROD GUIDE TUBE NEAR DEFICIENCY M43658 C-14 ZION 2 - RV AND SV. TESTING M12283 D-15 ZION 2 - SEISMIC QUALIFICATION XILIARY OF THE AU M46558 F-15 ZION 2 - NELB AND CONSEQUENTIAL LURE SYSTEM FEEDNATER SYSTEM FAI M52286 C-15 ZION 2 - NUREG-0737, II.E.1.1, AFM SYSTE

  • ZION 2 M EVAL M59004 C-16 ZION 2 - CONTROL OF HEAVY 1 LOADS - PHASE 1 M44701 F-16 ZION 2 - UTILITY RESPONSES MMENDATIONS TO STAFF RECOOF MPASC-10)

(FOLLONUP M12130 3-16 ZION 2 - NUREG-0737 II.E.1.2.1, AFM SAF5TY GRADE M51368 A-17 ZION 2 - EMERGENCY PLAN REVIEN CONCERNING STEAM GENERATORS AUTO INITIATION

- 2)

M11229 B-17 ZION 2 - INSTRUMENTATION OURSE TO FOLLON THE C M44740 F-17 ZION 2 - NYDRAULIC SNUBBERS M SPECS UPGRADE TEC (RG 1.97)

OF AN ACCIDENT M43016 D-17 ZION 2 - NUREG-0737 II.E.1.2.2, AFN SAFE TY GRADE M44827 ZION 2 - TECHNICAL SPECIFICATIONS FLONDEFININd F-18 INDICATION M55757 A-18 ZION 2 - NUREG-0737 II.E.4.1.2. D* DEDICATE OPERABILITY FOR SAFETY SYSTEMS

' M55921 D-19 ZION 2 - TECH. SPECS. AFFECTED .

ND 50.73 BY 50 72 A HYDROGEN PENETRATIONS M44898 F-19 ZION 2 - DIESEL GENERATOR . SPECS. RELIABILITY TECN (GL 83-43)

M19279 B-20 ZION 2 - NUREG-0737 II.E.4.2, CONTAINMEN T (OL 84-15)

"M59161 A-20 ZION 2 - CONTAINMENT LEAKAGE DUE TO SEAT ISOLATION DEPENDAEILITY M44969 F-20 ZION 2 - 10CFR50.62 OPERATING IENS REACTOR REVDETERIORATION M45040 F-21 ZION 2 - NUREG-0737 II.F.1.1, NOBLE GAS M60778 ZION 2 - NUREG-0737 II.F.1.2, IODINE / **

A-21 MONITOR ZION 2 - 10CFR50.61, PRESSURIZED THERMAL PARTICULATE SAMPLING SHOCK RULE REQUIREMENTS, PHASE I

-' ~~ _

T ..

{

R-1298731-991 '

ZION 2 REotiLAT.0RY .

INF0RMATION

\

\

(CONTINUATION) FACILITY TRACKINO j

i TAC NO. ?tPA.3 IMPLEMENTATION $YSTEM PAGE M11145 TITIf 5-21 Me8845 M45111 3-22 ZION 2 LOSS OF 125V AGE DC SUS VOLT M47648 F-22 ZION 2 - MECNAMICAL SNUSSERS

\

F-23 ZION 2 - NUREG-9737 II.F 1 3 M19942 3-23 ZION 2 - NUREO 9737 ITEM II F. . , CONTAINMENT HION M19199

{

M47719 B-24 ZION 2 - POTENTIAL E9UIPMENT 1.4 CONTAINMENT RANGE MONITOR i

F-24 ZION 2 - CONTAINMENT FAILURES PtNt0E ASSOCIATED MITH ORID PRES $URE I M42567 VOLTAGE j M47798 S-24 ZION 2 - NUREO 8737 ITEM II F1 ,

I M45181 F-25 ZION 2 - LONO TERM REVIEN CONT 5 CONTAINMENT .

_M19248 F-26 ZION 2 - NURES 9737 ITEM II F AllWEENT NATERPtNt0E (B-24)

LEVEL AND VENT MONITOR M46914 S-26 ZION 2 - NUREG-8737 II F 2 3 1.6 CONTAllIMENT k M49423 F-38 ZION 2 - INADVERTENT SAFETY INJ.HYDROGEN . IMADE90 ATE CORE MONITOR ,

\ M47828 3-32 ZION 2 - II K2.13 TMERMAL ECTION MANICAL MEC REPORTDURING )COOLDONN (PHR'SCOOLING IN F-33 ZION 2 - BLOCKING SI SIONAL E' M45258 F-36 ZION 2 - NUREO 9737 ITEM II K2, RING C00i.DONN k M45394 .17 POTENTIAL F-37 ZION 2 - NUREG-8737 . . . II K 3 1 '

M45391 F-38 ZION 2 - NUREG-9737 . .

II.K 3 2, AUTO PORV FOR VOIDING IN RCS i M08489 B-39 ZION 2 - NUREG-9737 II K 3 3, REPORT ON PORV ISOLATION M45421 , REPORT ON FAILURES

  • M45470 F-39 ZION 2 - PNR PRESSURE-TEMPEAAT URE TECN SPECS F-48 ZION 2 - NUREG-9737 . . II.K 3 5 RV/SV FAILURES M45598 F-41 ZION 2 - NUREG-8737 . . . ,II K 3 9 , AUTO TRIP OF PID RCPS M11972 5-41 ZION 2 - NUREO-0737 II K 3 19

~.11719 5-42 ZION 2 - FIRE PROTECTION SER , ANTICIPATORY TRIP CONTROLLER s'

- ZION 2 - TNREE MILE ISLANO FOLLOW P MORK MODIFICATIONS USUPPLEMENT 92

- #' # ,s s-- __ __ _ -

at

-- - g j . .i l -

l R-1208731'-801 R E O U L A*T 0 R Y l

INF0RMATION TRACKINO 3YSTEM PAGE 100. 8

! FACILITY IMPLEMENTATION ZION 2 (CONTINUATION) -

34/1{

i TAC NO. frA 9 TITLE

, M45558 F-st2 ZION 2 - NUREG-0737 II.K.3.12, ANTICIPATURY TRIP I DN TURBINE TRIP M43160 3-43 ZION 2 - PNR FEERNATER LINE CRACKS .- LONG TERM CORRECTIVE ACTION i M11783 3-43 ZION 2- FEERNATER LINE CRACRS

M12434 3-44 ZION 2 - LESSONS LEARNED IDFLEMENTATION ~ ~

M39117 B-44 ZION 2-2.2.1 A,3,C SHIFT SUPER. RESP.,

STA, TURNOVER PROCEDURES 1 M38118 B ZION 2-2.1.8.C IMPROVE 3 IODINE INST.

M39119 B-44 ZION 2-2.1.8,3 HION RA800E RADIATION ,. MONITORS

,M30128 3-44 '

ZION 2-2.1.8.A POST ACCIDENT SAMPLING M39121 3-44 ZION 2-2.1.6.3 SHIELDING REVIEN M39122 3-44 ZION 2-2.1.6.A SYSTEMS INTEORITY FOR HION RADI0 ACTIVITY

,M39123 .:

i 3-44 ZION 2-2.1.4 DIVERSE CONTAINMENT ISOLATIGli . .

M39124 5-44 ZION 2-2.1.3.3 INST. FOR CORE COOLING (INCN SUSC00 LING METER) '

M38125 3-44 ZION 2-2.1.~3.A DIRECT INDICATION OF VALVE POSITION ACTION e ,-

, M30126 B-44 ZION 2-2.1.2 RELIEF S SAFETY VALVE TESTING

} M38113 3-44 1 ZION 2-2.1.7.3 CONTROL ORADE AUX FEED

FLOW INDICATION j M30114 3-44 ZION 2-2,1.5 A,C DEDICATED M2 CONTROL

{'M3e115 B-44 PENETRATIONS S RECOMBINER PROCEDURE ZION 2-2.1.1. EMER. PONER SUPPLY PORV/

I BLOCK VALVE, PER NEATER & LEVEL M38116 B-44 ZION 2-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, .

M12943 3-45 OPERATIONAL SUPPORT CENTER l

ZION 2 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES Mi23 3 3-4.

ZION 2 - ANAtYSIS Or TURBINE nISC CRACKS -

M126:3 3-47 ,

ZION 2 -ECCS CLAD $NELLING S RUPTURE j M45678 F-47 ZION 2 - NURE0-8737 II.K.3.17, ECC SYSTEM l OUTAGES B-48

! .M13998.

ZION 2 - ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES i

i 1

,y 3A- .. $ _ . .

R-1204731'-881 l .

REOULAT.0RY INF0mMATION TRACKINO ZION 2 FAC1LITY IMPLEMENTATION 5Y$ TEM PAGE N0. 8 (CONTINUATION) e4/)

JAC No. MPA 8 TITLE M11884 3-52 M44448 F-53 ZION 2 - REVIEW OF SAFETY ASPECTS OF INADVERTENT SAFETY M2196 ZION 2 - NUREO 0737, II.K.3.25, PONER ON PUMP SEALS ACTUATIONS DURING SURVEILLANCE TESTI 3-57 ZION 2 - DECAY NEA,T REMOVAL M5874 F-57 ZION 2 - NUREG-5737 II.K.3.30, SB LOCA CAPABILITY TECH SPECS M8215 F-54 ., OUTLINE M42872 3-53 ZION 2 -NUREG 0737 II.K.3.31 COMPLIANCE MITH

10 CFR 58.44 M2473 3-68 ZION 2 - MASONRY MALL DESION. RESPONSE ,

88-11TO IE BULLETIN M2717 B-61 ZION 2 - ENVIRONMENTAL trUALIFICATION OF SAFETY.

M2789 ZION 2 - IE BULLETIN 79-27, LOSS OF NON CLASS IE RELATED ELECTRICAL EQUIPMENT (80-C B-62 M43900 3-63 ZION 2 - ESF RESET CONTROL DESIGN DEFICfENCY INST 8 CONTR.- ISE PONER. REV. 8 EVAL. RE SULLETIN 88-04 M5993 F-63 ZION UNIT 2 - STATION BLACKOUT PROCEDURES S TRAINING ZION 2 - NUREG-0737 III.A.1.2, TECHNICAL M46965 F-64 ,

' ZION 2 - NUREG-4737 III.A.1.2, OPERATIONAL SUPPORT CENTER M46137 F-45 ZION 2 - NUREG-0737 III.A.1.2, EMER0ENCY SUPPORT CENTER '

M7184 B-66 OPERATIONS FACILITY M46299 F-64 ZION E NATURAL CIRCULATION COOLDONN (GENERIC 81-21) LTR M46281 ZION 2 - III.A.2 NUCLEAR DATA LINK

F-67 DATA M46352 F-68 SION 2 - III.A.2.1 EMER0ENCY PLAN UP0kADE TO MEET RULE ZION 2 - NUREG-9737 III.A.2.2, METEOROLOGICAL M6870 3-69 DATA UPORADE M46423 F-69 POINT BEACM 2 - EXTENSION OF NUREG-9737 ZION 2 - NUREG-9737 III.D.3.3, INPLANT SUPPLEMENT 1 ORDER DATES (SAS, REO. OUIDE i.97 AND EOF)

"M6557 F-70 ZION 2 - NUREG-9737,III.D.3.4 CONTROL ROOM RADIATION MONITORING M46644 3-78 NABITABILITY J M56183 F-71 ZION 2 - MONITORING OF FATIOUE TRANSIENT LIMITS M49778 ZION 2 - I.D.1.2 DETAILED CONTROL ROOM DESIGN

, FOR THE REACTOR COOLANT SYSTEM B-72

" REVIEN SUMNARY REPORT - F-71 ZION 2 - "NUREO 0737 TECM SPECS (GENERIC LETTER 82-16 82-16 OR 83-02)"

_ - -- _ __ _ _ _ _ _ _ _ - - - - - - -i

II -

-- r ~ *

-1 ,

l R-titi8731-901 REOUL5T1RY INF0RMATIeN TRACKINO 3YSTEM '

PAGE NO.

FACILITY I M P L E M E N T A T I.O l? -

ZION 2 (CONTINUATION) 84/.

.\

TAC NO. MPA 9 TITLE MS2815 B-76 . '

l M52896 ZION 2 - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES

't 3

3-77 ZION 2 - ITEM 2.1 - E9UIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS

{ M52977 B-78 ZION 2 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING f M53054 3-79 PROCEDURES / VENDOR RECOMMENDATIONS ZION 2-tTEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECM SPECS-RTS COMPONENTS M53111 B-88 M53144 ZION 2 - i'EACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATES MODIFICATIONS 3-81 ZION 2 - ITL*$ 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE MS3206 3-82 PROGRAM FOR REACTOR TRIP BREAKERS - MAI ZION 2 - ITEM 4.3 - AUTOAMTIC ACTUATION OF SilUNT TRIP M54581 3-83 ATTACHMENT FOR M AND B 8 M PLANTS ZION 2 - TECHNICAL SPECIFICATIONS COVERED BY GENERICLETTERS 83-36, 83-37 FOR NUREG-8737 M53649 E-85 ZION 2 - ITEM 1.2 - POST TRIP REVIEM-Be.TA AND INFORMATION CAPABILITY f M53732 3-86 ZION 2 - ITEM 2.2 - E90IPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53815 3-87 ZION 2- ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING M53898 B-88 PROCEDURES AND VENDOR REC 099fENDATIONS 'ALL SR COMPI ZION 2 - ITEM 3.2.3 - POST-MAINTEMAIICE TESTING l M53951 3-89 -CHAIIGES TO TECH. SPEC. - ALL SR COMPONENTS ZIOff 2 - ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTEIIANCE

{ M55388 E-90 PROGRAM FOR RX TRIP BREAKERS - LIFE TESTI ZION 2 - ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SMUllT M54125 3-92 TRIP FOR M AND B8M PLANTS - TECM SPECS ZIOll 2 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY 4

M54942 3-93

, , ZION 2 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM

. FUIICTIONAL TESTING - ALTERNATIVES S TEST IN t

=

l ,e

}