Similar Documents at Zion |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments 1999-09-30
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F6631990-11-16016 November 1990 Forwards Safety Insp Repts 50-295/90-26 & 50-304/90-28 on 901022-26.No Violations Noted ML20062F0931990-11-0808 November 1990 Forwards Safety Insp Repts 50-295/90-20 & 50-304/90-22 on 900910,24-28 & 1018 & Notice of Violation ML20058H1561990-11-0202 November 1990 Forwards Safety Insp Repts 50-295/90-21 & 50-304/90-23 on 900902-1013.No Violations Noted ML20058F2521990-10-31031 October 1990 Forwards Details of Allegation (RIII-90-A-0100) Re Activities at Plant,For Review & Followup.Encl Withheld (Ref 10CFR2.790) ML20058D7781990-10-31031 October 1990 Forwards Amends 120 & 109 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation ML20058F4641990-10-31031 October 1990 Forwards Safety Insp Repts 50-295/90-22 & 50-304/90-24 on 900924-1012 & Notice of Violation ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20062C5391990-10-24024 October 1990 Ack Receipt of Providing Addl Info Re Licensed Operator Requalification Program at Facility,Per 900706 Request ML20062C7241990-10-22022 October 1990 Forwards Safeguards Insp Repts 50-295/90-19 & 50-304/90-21 on 900813-1003.No Violations Noted ML20062B3601990-10-12012 October 1990 Advises of Termination of CAL-RIII-90-11 Re Validity of Torque Switch Settings on safety-related Motor Operated Valves ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059M6821990-09-24024 September 1990 Forwards Safety Insp Repts 50-295/90-18 & 50-304/90-20 on 900730-0803.No Violations Noted ML20059N1091990-09-21021 September 1990 Forwards Insp Repts 50-295/90-11 & 50-304/90-13 on 900424- 0508 & 29 as Followup to Safety Insp Repts 50-295/87-08 & 50-304/87-10 on 870415 & 24 & Notice of Violation ML20059J7521990-09-13013 September 1990 Ack Receipt of in Response to NRC Re Allegations Pertaining to Improper Use of Check Valve for Isolating RHR & Safety Injection Sys to Repair Swing Check Valve.Investigation Found Evidence to Support Conclusions ML20059J7471990-09-13013 September 1990 Ack Receipt of Responding to Re Allegations Concerning Placement of Contaminated Hose in Diesel Generator 2A Room at Plant.Investigation Satisfactory.Supporting Documents Will Be Retained for 1 Yr ML20059L0141990-09-11011 September 1990 Confirms Plans for 900917 Meeting in Glen Ellyn,Il to Discuss Status of Performance Improvement Program & Issues ML20059L3741990-09-11011 September 1990 Forwards Exam Rept 50-295/OL-90-01 Administered During Wk of 900723,facility Comments,Nrc Resolution,Exams & Answer Keys ML20059H1551990-09-0606 September 1990 Forwards Insp Repts 50-295/90-15 & 50-304/90-17 on 900716- 0808 & Notice of Violation ML20059F7611990-09-0404 September 1990 Forwards Diagnostic Evaluation Team Rept for Plant. Performance Deficiencies Noted in Areas of Operations,Maint & Testing Resulting from Weaknesses in Mgt & Engineering Support.W/O Rept IR 05000295/19900131990-08-24024 August 1990 Forwards Notices of Violations from Insp Repts 50-456/90-13, 50-457/90-16,50-295/90-13 & 50-304/90-15 Inadvertently Removed from Rept Package Due to Administrative Error ML20056B2451990-08-14014 August 1990 Confirms 900821 Mgt Meeting in Zion,Il to Discuss Performance Improvement Progress Update & Recent Findings IR 05000295/19892001990-08-14014 August 1990 Discusses Insp Repts 50-295/89-200 & 50-304/89-200 on 891127-1208 & Forwards Notice of Violation.Review of Vendor Interface Program Indicated Need for Improvement.Nrc Will Review Operability Determination ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A6961990-08-0303 August 1990 Forwards Safety Insp Repts 50-295/90-12 & 50-304/90-14 on 900717-19.No Violations Noted.One Exercise Weakness Identified.Util Should Address Actions Taken or to Be Taken to Improve Performance in Emergency Preparedness Area ML20058N0201990-08-0101 August 1990 Forwards Safety Insp Repts 50-295/90-16 & 50-304/90-18 on 900702-06,16 & 20.No Violations Noted ML20056A0401990-07-31031 July 1990 Forwards AEOD/T925A, Evaluation of Safety Equipment Outages for Significance at Zion (Revised) ML20055J4411990-07-27027 July 1990 Confirms Mgt Meeting on 900731 in Zion,Il to Discuss Performance Improvement Plan Progress Update Which Should Include Det Findings ML20055J2061990-07-24024 July 1990 Confirms Plans for Mgt Meeting W/Util in Region III Ofc on 900725 to Discuss Diagnostic Evaluation Team Findings at Plant Re motor-operated Valve Issues & Svc Water Operability ML20055D2431990-06-22022 June 1990 Forwards Safety Insp Repts 50-295/90-07 & 50-304/90-07 on 900414-0602.No Violations Noted ML20059M8791990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248J1991989-10-0606 October 1989 Confirms Mgt Meeting on 891017 in Zion,Il to Discuss Status of Plant Performance Improvement Plan IR 05000295/19890221989-09-21021 September 1989 Forwards Insp Repts 50-295/89-22 & 50-304/89-20 on 890710-18 & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Re Unprotected Vital Area Barrier.Encls Withheld (Ref 10CFR73.21) ML20247L9791989-09-14014 September 1989 Forwards Security Insp Repts 50-295/89-25 & 50-304/89-23 on 890209-0807.No Violations Noted.Util Intends to Provide Addl Resources to Security Organization in Order to Reduce Need for Individuals to Work Hours That Exceed NRC Guidelines ML20247L0861989-09-14014 September 1989 Forwards Safety Insp Repts 50-295/89-23 & 50-304/89-21 on 890717-21 & 0811 & Notice of Violation ML20247E9471989-09-0808 September 1989 Forwards Safety Insp Repts 50-295/89-24 & 50-304/89-22 on 890731-0804.No Violations Noted ML20247E7101989-09-0808 September 1989 Forwards Amends 118 & 107 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Permit Temporary one-time Changes to Tech Specs Re Auxiliary Electric Power to Allow Performance of Extensive Preventive Maint ML20247A7921989-09-0101 September 1989 Forwards Maint Team Insp Repts 50-295/89-18 & 50-304/89-17 on 890619-0724 & Notice of Violation.Significant Weaknesses Re Instances of Inadequate & Untimely Corrective Action & Failure to Post Maint Test Requirements Noted ML20246M6811989-08-30030 August 1989 Confirms 890818 Telcon Re Emergency Notification Sys Calls in Ref to Discovered Vital Area Degradations.Security Staff in Process of Walking Down Vital Area Barriers as Result of Violation Noted in Insp Repts 50-295/89-22 & 50-304/89-20 ML20246K7721989-08-25025 August 1989 Forwards Enforcement Conference Repts 50-295/89-26 & 50-304/89-24 on 890817 ML20245K8821989-08-11011 August 1989 Forwards Safeguards Insp Repts 50-295/89-22 & 50-304/89-20 on 890710-18.Violations Noted.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action.Enforcement Conference Scheduled for 890817 ML20248D6921989-08-0404 August 1989 Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan ML20248D7141989-08-0101 August 1989 Forwards Safety Insp Repts 50-295/89-20 & 50-304/89-18 on 890619-0714.No Violations Noted ML20245F1541989-08-0101 August 1989 Forwards Amends 117 & 106 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Revise Tech Spec Section 3.3.1.F, Relief Valves to Include Exception to General Limiting Condition 3.0.4 ML20247R1671989-08-0101 August 1989 Confirms 890817 Meeting in Glen Ellyn,Il to Discuss Event Identified During 890710-18 Security Insp,Per 890725 Telcon ML20247J0911989-07-24024 July 1989 Forwards Safety Insp Repts 50-295/89-15 & 50-304/89-15 on 890509-0629 & Notice of Violation.No Response Required Re Item 1 of Notice of Violation ML20247J0361989-07-24024 July 1989 Ack Receipt of 890705 Addl Info Re 890526 Response to Allegations Re Welders,Per 890622 Telcon.Accepts Allegation 5 Per 890626 Memo Stating Corrective Actions Implemented. Considers Allegations Closed ML20247J6971989-07-21021 July 1989 Ack Receipt of 890518 Response to NRC Re Allegation RIII-88-A-0162 Pertaining to fitness-for-duty Issue at Plant.Investigation Found to Be Sufficient to Support Conclusions ML20247D2451989-07-14014 July 1989 Forwards Notice of Consideration of Issuance of Amend to Licenses DPR-39 & DPR-48 & Opportunity for Hearing ML20247B0001989-07-12012 July 1989 Forwards Details of Allegations Re Util Implementation of Fitness for Duty Program,For Info.Allegation Does Not Provide Sufficient Details or Basis to Indicate Potential Safety Concern Exists.Encl Withheld (Ref 10CFR2.790) ML20245K1541989-06-27027 June 1989 Confirms 890707 Senior Mgt Meeting W/Util at Region III Ofc in Glen Ellyn,Il to Discuss Current Status of Improvement Programs Implemented at Plant,Per 890626 Discussion 1990-09-06
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20198C7261998-12-15015 December 1998 Responds to ,By Informing That NRC Sent Response to C Paxton on 980924 Which Stated That NRC Continues to Review Concerns Raised by Petitioners.Nrc Will Continue to Maintain Oversight of Zion NPP During Decommissioning ML20196E2371998-11-27027 November 1998 Discusses Licensee ,Requesting That Agreement in Be Changed to Reflect Latest NRC Conditions Requiring Licensees to Notify NRC of Transfer of Assets to Affiliates Imposed in Connection with Approval of Transfer ML20196A4121998-11-19019 November 1998 Forwards Safety Evaluation Accepting Proposed Changes to QA TR CE-1-A,Rev 66,by ,As Modified by Ltrs & 1027.Proposed QA Tr,Rev 66 Continues to Comply with Criteria of 10CFR50,App B ML20195F2291998-11-13013 November 1998 Refers to Info Provided to NRC on 980513,by Personnel at Zion NPP Re Contractor Employee Who Did Not Wait for Assistance After Receiving Two Contamination Alarms. Concluded That Employee Deliberately Failed to Wait ML20195G8871998-11-13013 November 1998 Forwards Synopsis of OI Rept 3-98-027,conducted to Investigate Circumstances Surrounding Issue Re Two Consecutive Contamination Alarms from Two Portal Monitors Located at Plant ML20155F8721998-11-0303 November 1998 Forwards Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Activities in Area of Mgt & Control,Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined ML20155F5591998-10-29029 October 1998 Forwards Transcript of 980601 Public Meeting Held by NRC Re Decommissioning of Plant,Units 1 & 2 ML20154P9051998-10-20020 October 1998 Ack Receipt of 980821 Submittal,Per 10CFR50.54(a),requesting Review & Approval of Proposed Changes That Reduce Commitments in QA TR,CE-1-A.Util Should Refrain from Implementing Subj Changes Until Formal Notification Given ML20154D0911998-10-0101 October 1998 Responds to 980824 RAI Re Resolution of Potential Safety Isuues Raised by Dienethal & Robarge Re Zion Npp.Informs That NRC Continues to Review & Evaluate Concerns Raised & Will Maintain Oversight During Decommissioning of Zion NPP ML20153E3341998-09-24024 September 1998 Responds to Addressed to D Meyer Re Two Proceedings Before ASLBs Concerning Zion Nuclear Power Station.With Certificate of Svc.Served on 980924 ML20153G0521998-09-24024 September 1998 Responds to Addressed to D Meyer.Two Proceedings Currently Before Aslb.E Dienethal Party in Both.With Certificate of Svc.Served on 980924 ML20153F6641998-09-24024 September 1998 Submits Addl Info Re Resolution of Potential Safety Issues Raised by E Dienethal & R Robarge ML20197C2911998-09-0808 September 1998 Forwards Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted ML20237E2231998-08-26026 August 1998 Informs That NRC Mgt Responsibilities for Plant,Units 1 & 2 Have Been Transferred from SA Richards to Sh Weiss & Effective 980722,AW Markley Relieved R Assa as Lead Project Manager for Plant,Units 1 & 2 ML20236U6161998-07-24024 July 1998 Forwards Amends 179 & 166 to FOLs DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Restore Custom TS & Associated License Conditions That Had Been Replaced by Improved TS & Change Certain Mgt Titles & Responsibilities ML20236T6231998-07-22022 July 1998 First & Final Response to FOIA Request for Records.Records in App a Being Made Available in PDR & Encl.Records in App B Partially Withheld Per Exemption 6 ML20236S3241998-07-20020 July 1998 Forwards SER Accepting Certified Fuel Handlers Training & Retraining Program for Plant,Units 1 & 2 ML20236R6111998-07-17017 July 1998 Responds to Requesting Proration of FY98 Annual Operating Reactor Fee for Zion Station,Units 1 & 2 ML20236M3671998-07-0808 July 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of CY98 for Plant,Units 1 & 2.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events & Source Availability ML20236L4251998-07-0606 July 1998 Informs That NRC Regional Oversight Responsibilities for Plant Units 1 & 2 Have Been Transferred from Region III Div of Reactor Projects to Region III Nmss,Effective 980626 ML20236G0081998-06-30030 June 1998 Forwards Exemption from Requirements of 10CFR50.71, Maint of Records,Making of Repts, for Zion Nuclear Power Station, Units 1 & 2.Exemption Permits Extension of Time Interval for Updating Zion FSAR ML20236L4451998-06-26026 June 1998 Forwards Insp Repts 50-295/98-07 & 50-304/98-07 on 980425- 0609.No Violations Noted ML20236F4901998-06-25025 June 1998 Informs of Completion of Licensing Action for NRC Bulletin 96-002,for Plant ML20249C1681998-06-24024 June 1998 Forwards Environ Assessment Related to Application for Exemption from Certain Requirements of 10CFR50.71 for Units 1 & 2.Exemption Would Permit Extension of Time Interval for Submittal of Updated FSAR ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20249C3121998-06-23023 June 1998 Inorms That Proposed Revision 66 to QA Topical Rept,CE-1-A, Not Acceptable.Requests That Licensee Refrain from Implementing Changes Until Formally Notified ML20249B2121998-06-15015 June 1998 Discusses Closure of CAL-3-97-02,CAL-3-97-02A & CAL-3-97-02B & NRC Manual Chapter 0350 Restart Action Plan for Zion Station ML20248C4281998-05-26026 May 1998 Informs That Due to Inclement Weather on 971112 & 980123,all Students Did Not Receive hands-on Training on Use of Fire Extinguishers During Fire Watch Training Demonstration IR 05000295/19980051998-05-20020 May 1998 Forwards Insp Repts 50-295/98-05 & 50-304/98-05 on 980314-0424.No Violations Noted.Staff Responded to Several Events Involving Configuration Control Deficiencies ML20217Q5081998-05-0404 May 1998 Ack Receipt of Certification of Permanent Cessation of Power Operation & Permanent Removal of Fuel from Reactors Vessels. Therefore,Pursuant to 10CFR50.82(a)(2),10CFR50 Licenses for Plants,Unit 1 & 2,no Longer Authorize Operation of Reactor ML20217L8041998-04-23023 April 1998 Forwards Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted ML20216G6311998-04-0909 April 1998 Summarizes 980312 Meeting Conducted at Region III Ofc in Lisle,Il,To Discuss Util Performance Re Action That Util Taken in Response to NRC 10CFR50.54(f) Ltr, Re Safety Performance at Facilities.List of Attendees Encl ML20217J2131998-04-0202 April 1998 Forwards Copy of Each Revised Forms 398,personal Qualifications Statement & 396,certification of Medical Exam by Facility Licensee.Due to Error on Instructions for Form 398,addendum for Completing Form Are Provided 1999-09-27
[Table view] |
Text
%
g prl
' May 1, 1986 Docket Nos. 50-295 DISTRIBUTION ket File and 50-304 NRC PDR L PDR Gray File J. Norris C. Vogan OELD E. Jordan B. Grimes J. Partlow ACRS(10) H. Smith Mr. D. L. Farrar S. Scott Director of Nuclear Licensing Commonwealth Edison Company
. Post Office Box 767 Chicago, Illinois 60690 .
Dear Mr. Farrar:
Subject:
IMPLEMENTATION OF GENERIC REQUIREMENTS The Comptroller General in a Report to the Congress cated September'19,1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." .To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.
To assist me in developing this information for Zion Nuclear Power Station Units I and 2, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter
" projected" under the Status column. I do not expect or want a major effort made to obtain percise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented is acceptable. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
l "
l 8605190009 DR 860501 l p ADOCK 05000295:
PDR l
7 This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincere'y, Jan A. Norris, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A, NRR
Enclosures:
As stated cc: See next page i .
\
PAD-3 N P l D PA -3s C. Vogan d. f opris bs 3 S. V g 01/\/86 C 4 l 'j S 6 ^ L s/</n M'9/< 4 f
13 _
I ,y
- .. ~, . ,
5 !
R-1294731-est R E O U L A't.0 R Y INF0RMATION TRACKINO SYSTEM PAGE 110. 8 FACILITY IMPLEMENTATION
- 04/1 FACILITY: ZION 1 PLANT LOCATION: 40 MI N OF CHICAGO, ILL
,~
BOCKET NUMBER: 850-89295 LICENSE"3 POWER: 3250 leff ARCH / ENGINEER: SSL DESIGN PGNER: 1040 MNE PROJECT MANAGER: J. NORRIS j IE INSPECTOR: NSSS VENDOR: NEST BRANCH CHIEF: S. VARGA M. NOLZMER LIC. ASSISTANT:
1 .
L. PARRISH 1
! TAC NO. IFA 3 i TITLE j N07553 E-01 i ZION 1 - SPENT FUEL POOL MODIFICATION MD6911 A-01 ZIOli 1 - INSERVICE INSPECTION j MO7998 B-91 ZION 1 - DIESEL OENERATOR LOCROUT M88258 C-91 f ZION 1 - PNR SECONDARY CHEMISTRY MONITORING ltE9UIREMENTS - GENERIC M44964 F-91 '
! ZION 1 - NUREG-9737 I.A.1.1 STA LONG TERM RE9UIREMENTS M49683 0-01
{
ZION 1 - REACTOR COOLAlti PUMP TRIP j M68139 A-92 ZION 1 - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN M44137 F-92 ZION 1 - IOUREG-8737 1. A.1.3.1, SHIFT MAINIING :
M87881 OVERTIME LIMITS L D-92 ,
ZION 1 - ECCS ZIRC CLAD MODEL ERROR '
l Mr,1852 E-92 i ZION 1 - DROPPED FUEL CASK MS6776 B-92 ZION 1 - FIRE PROTECTION MD6554 A-93 ZI0lt 1 - PHYSICAL SECURITY PROGRAM
- MS8498 B-03 ZIDH 1 - Phit MODERATOR DILUTIOlt M87178 D-03 ZIOli 1- PRES $UltIZER NEATUP RATE CHA100E FROM 200 DEGREES F/NR TO 109 DEGREES F/NR M44298 F-03 ZIOll 1 - DOUltEG-9737 I. A.2.1.4, UPoltADING OF RO l MS8014 AND SRO TRAINING C-04 ZION 1-FILTER TECH SPECS "M86795 3-94 I
ZION 1 - REACT 0ft VESSEL OVERPRESSINtE PROTECTION **
M04862 A-94 i ZION 1 - CONTAINMENT LEAK TESTIllo - APP. J (GENERIC) 4 M40279 F-84 1 ZION 1 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE M44349 F-35 C00LIllG OUIDELINES
}
ZION 1 - PROCEDURES GENERATION PACKAGE REVIEN
!: (NUREG 0737 SUPP/1) 1 I-
A '
~
] .* a.
i O
- R-1298731-Set REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s f FACILITY IMPLEMENTATION 04/(
j ZION 1 (CONTINUATION)
TAC NO. frA B TITLE i M06431 E-05 ZION 1 - N-1 LOOP OPERATION
- i M08874 C-96 ZION 1 - PHR PUMP S S/0 SUPPORTS - LAMELLAR TEARING S FRACTURE TOUGHNESS l
- M47263 F-86 ZION 1 - FEEDBACK 0F OPERATING EXPERIENCE (AP I.C.5)
M47335 F-97 ZION 1 - CORRECT PERFORMANCE OF OPERATING ACTIVITIES CAPI.C.6) i M08876 C-97 ZION 1 - FUEL HANDLING ACCIDENT INSIDE CONATAINMENT N07810 3-97 ZION 1 - STEAM OENERATOR FEEDNATER FLON INSTABILITY
} N06689 A-37 ZION 1 - FRACTURE TOUONNESS RERUIREMENTS APPEND 0 M08175 5-98 ZION 1 - PNR HPSI-LPSI FLON RESISTANCE - GENEitIC '
M51217 F-08 ZION 1 - I.D.1.1 - DETAILED CONTROL ROOM DESION REVIEN PROGRAM PLAN F-98
, M51297 F-89 ZION 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM 1
i M08475 C-09 ZION 1 - PNR AUXILIARY FEEDNATER PUMPS (GL-4)
MS8988 A-99 ZION 1 - PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE MATERIAL SURVEILLANCE i M07837 B-09 ZION 1 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM i M19741 A-10 ZION 1 - CONTINGENCY PLAN REVIEN MS8992 C-18 ZION 1 -CONTROL OF HEAVY LOADS OVER SPENT' FUEL POOL (NUREO 8612) l j MS8872 D-10 ZION 1 - REVIEN OF ASYIO1 ETHIC LOCA LOADS SUBMITTAL j- M44417 F-10 ZION 1 - NUREG-0737 II.D.1, RCS HIGH POINT VENTS j M47986 F-11 ZION 1 - PLANT SHIELDIIIG MODIFICATIONS (11.B.2.2)
', M19739 A-11 ZION 1 - GUARD TRAINING PLAN REVIEW 4
"M10004 D-11 ZION 1 - ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LNR FUEL s' j M18745 A-12 ZION 1 - VITAL AREA ANALYSIS M44087 F-12 ZION 1 - NUREG-e737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS
} M44558 F-13 ZION 1 - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE l :
'I {r l
R-1208731-901
INF0RMATION TRACKINO -
ZION 1 FACILITY SYSTEM (CONTINUATION) IMPLEMEN7ATION PAGE NO.0 04/
JAC NO. MPA 0 _
TITLE N08878 D-14 M08849 8-14 ZION 1 - REACTOR VESSEL HELD HIRE DEFICIENCY .
M44630 F-14 ZION 1 - CONTROL ROD OUIDE TUBE NEAR ZION 1 - RV AND SV, TESTING M43637 C-14 M12282 D-15 ZION 1 - SEISMIC QUALIFICATION OF THE AUXILIARY FEEDNATER SYSTEM M46556 F-15 ZION 1 - HELB AND CONSEQUENTIAL SYSTEM ZION 1 FAILURE M52285 C-15 ZION 1 - NUREG-0737, II.E.1.1, AFN SYSTEM EVAL M59003 C-16 ZION 1 - CONTROL OF HEAVY LOADS .- - PHASE II M44700 F-16 ZION 1 - UTILITY RESPONSES TO STAFF (FDLLONUP RECOMMENDATIONS OF MPASC-10)
M12129 B-16 ZION 1 - NUREG-0737 II.E.1.2.1, AFN SAFETY ORADE CONCERNING STEAM OENERATORS COL ZION 1 - EMERGENCY PLAN REVIEN AUTO INITIATION M51367 A-17 M11228 B-17 ZION 1 - INSTRUMENTATION TO FOLLON THE COURSE ,
M44739 F-17 ZION 1 - NYDRAULIC SNUBBERS UPORADEOFTECH AN ACCIDENT SPECS (RG 1.97)
M43815 D-17 ZION 1 - NUREG-0737 II.E.1.2.2, AFM SAFETY ORADE '
FLON INDICATION M44826 F-18 ZION 1 - TECHNICAL SPECIFICATIONS DEFINING M55756 ZION 1 - NUREG-0737 II.E.4.1.2, DEDICATED ' OPERABILITY FOR SAFETY SYSTEMS A-18 NYDROGEN PENETRATIONS M55920 D-19 ZION 1 - TECN. SPECS. AFFECTED BY 50.72 . AND 50 73 (OL 83-43)
M44897 F-19 ZION 1 - DIESEL DENERATOR RELIABILITY(GL . TECN.
84-15)
SPECS M10278 ZION 1 - NUREG-0737 II.E.4.2, CONTAINMENT B-20 "M59160 A-20 ZION 1 - CONTAINMENT LEAKAGE DUE ISOLATION TO SEAT DEPENDABILITY DETERIORATION M44968 F-20 ZION 1 - 10CFR50.62 OPERATINO REACTOR REVIENS M45039 ZION 1 - NUREG-0737 II.F.1.1, NOBLE GAS **
F-21 ZION 1 - NUREG-0737 II.F.1.2, IODINE / MONITOR M60777 A-21
~
PARTICULATE SAMPLING ZION 1 - 10CFR50.61 - PRESSURIZER THERMAL SHOCK RULE REQUIRENENTS, PHASE 1
il 1.. [ ~ '
R-1208731-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM ZION 1 FAC1LITY IMPLEMENTATION PAGE NO (CONTINUATION) C' TAC NO. MPA 0 TITLE M11144 B-21 ZION 1- LOSS OF 125 V DC BUS VOLTAGE M08864 B-22 ZION 1 - MECNANICAL SNUBBERS M45110 F-22 ZION 1 - NUREG-07J7 II.F.1.3, CONTAINMENT MIGH M47647 F-23 RANGE MONITOR M10061 ZION 1 - NUREO 0737 ITEM II F1.4 CONTAINMENT 3-23 PRE *,SURE INSTRUMENT M10200 3-24 ZION 1 - POTENTIAL EQUIPMENT FAILURES ASSOCIATED WITH ORID VOLTA ZION 1 - CONTAINMENT PURGE M47718 F-24 M42566 ZION 1 - NUREG 0737 ITEM II F1.5 CONTAINMENT' B-24 MATER LEVEL MONITOR M47789 F-25 ZION 1 - LONG TERM REVIEN CONTAINMENT PURGE A'ND VENT (3-24)
M45180 ZION 1 - NUREG 0737 ITEM II F1.6 CONTAINMENT F-26 NYDROGEN MOIIITOR ZION 1 - NUREG-0737 II.F.2.3, INADEQUATE CORE M10239 B-26 C0 CLING INSTRUMENTATION M46913 F-30 ZION 1 - INADVERTENT SAFETY INJECTION DURING COOLDONN (PNR'S) .
M47827 ZION 1 - II K2.13 THERMAL MECHANICAL REPORT F-33 '
M45257 ZION 1 - NUREG 0737 ! TEM II K2.17 POTENTIAL F-36 FOR VOIDING IN kCS ZION 1 - NUREG-0737 II.K.3.1, AUTO PORY
- 45303 F-37 ISOLATION ZION 1 - NUREG-0737 II.K.3.2, REPORT ON PORV M45390 F-38 FAILURES
' ZION 1 - NUREG-0737 II.K.3.3, REPORT ON
' ' M08688 B-39 RV/SV FAILURES M45420 ZION 1 - PWR PRESSURE-TEMPERATURE TECH SPECS F-39 ZION 1 - NUREG-0737 II.K.3.5, AUTO TRIP OF M45469 F-40 RCPS ZION 1 - NUREG-0737 II.K.3.9, PID "M45499 F-41 CONTROLLER ZION 1 - NUREG-0737 II.K.3.10, ANTICIPATORY TRIP M11071 3-41 MODIFICATIONS ZION 1 - FIRE PROTECTION SUPPLEMENT 02 s'
M11718 B-42 M45529 ZION 1 - THREE MILE ISLAND FOLLON UP NORK F-42
~ ZION 1 - NUREG-0737 II.K.3.12, ANTICIPATORY TRIP DN TURBINE TRIP
II 7- ,[ , .
l
} R-1298731-901 R E O U L*A T 0 R Y INF0RMATION TRACKINO SYSTEM "
PA0E NO.i
- ZION 1 FACILITY IMPLEMENTATION i (CONTINUATION) 04s j TAC NO. MPA.9 TITLE M43159 B-43 M11782 D-43 ZION 1 - PHR FEEDWATER LINE CRACKS LONO TERMACTION CORRECTIVE
- ZION 1- FEEDHATER LINE CRACKS i M12433 3-44 5 ZION 1-LESSONS LEARNED IMFLEMENTATION M30099 B-44 ZION 1-2.1.7.3 CONTROL ORADE AUX FEED l M30100 3-44 FLON INDICATION ZION 1-2.1.5 A,C DEDICATED N2 CONTROL j M30101 3-44 ZION 1-2.1.1. EMER. PONER SUPPLY PORV/ PENETRATIONS 8 RECOMBINER PROCEDURE i M39102 3-44 BLOCR VALVE, PER HEATER S LEVEL ZION 1-2.2.2 A,B,C CONTROL ROOM ACCESS. TSC,'~.
M39193 3-44 OPERATIONAL SUPPORT CENTER ZION 1-2.2.1 A,B,C SHIFT SUPER. RESP., '
i M30104 ~ B-44 '
STA, TURNOVER PROCEDURES '
ZION 1-2.1.8.C IMPROVED IODINE INST.
M30105 B-44 ZION 1-2,1.B.B HION RANGE RADIATION M30106 B-44 MONITORS ZION 1-2.1.8.A POST ACCIDENT SAMPLING '
4 M39107 B-44 ZION 1-2.1.6.3 SHIELDING REVIEN
{ M30196 3-44 ~ '
M39199 B-44 ZION 1-2.1.6.A SYSTEMS INTEGRITY FOR HION. RADIDACTIVITY ZION 1-2.1.4 DIVERSE CONTAINMENT ISOLATION M39110 3-44 ZION 1-2.1.3.3 INST. FOR CORE COOLING
- M39111 3-44 (INCN SURC00 LING METER) s ' ' M39112 ZION 1-2.1.3.A DIRECT INDICATION OF VALVE POSITION ACTION B-44 I ZION 1-2.1.2 RELIEF S SAFETY VALVE TESTING M12942 3-45
! M12587 B-46 ZION 1 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES ZION 1 - ANALYSIS OF TURBINE DISC CRACKS
$ "M45677 F-47 i ZION 1 - NUREG-0737 II.K.3.17, ECC SYSTEM
- M12692 3-47 OUTAGES **
ZION 1 -ECCS CLAD SHELLING S RUPTURE f M13907 B-48 ZION 1.-
ADESUACY OF STATION ELECTRIC DISTRIBUTION k M11883 B-52 SYSTEMS VOLTAGES ZION 1 - REVIEN OF SAFETY ASPECTS OF INADVERTENT SAFETY
! SYSTEM ACTUATIONS DURING SURVEILLANCE TE
~
l *I -_
.. 1 l . .
l +
R-1298731-901 .
R E O U l' A T 0 R Y INF0RMATION TRACKINO FACILITY 5YSTEM PAGE NO ZION 1 IMPLEMENTATION 8i (CONTINUATION) k 1 TAC NO.
- MPA 9 _
TITLE M44439 F-53 ZION 1 - NUREO 9757, II.K.3.25, PONER ON PUMP SEALS
{ M42195 B-57 ZION 1 - DECAY HEAT REMOVAL j M45873 F-57 CAPABILITY TECH SPECS ZION 1 - NUREG-0737 II.K.3.30, SB LOCA
} M48214 F-58 OUTLINE M42871 3-59 ZION 1 -NUREO 5737 II.K.3.31 COMPLIANCE NITN IS CFR 58.46 I M42472 3-68 ZION 1 - MASONRY MALL DESION. RESPONSE TO 80-11 IE BULLETIN i M2716 B-61 ZION 1 - ENVIR0lWIENTAL QUALIFICATION OF SAFETY
( M42788 ZION 1 - IE BULLETIN 79-27, LOSS OF NON CLAS5 IE RELATED ELECTRICAL EQUIPMENT (80-CLI-B-62 INST 4 CONTR. POWER. REV. 8 EVAL. RESP M43499 B-43 ZION 1 - ESF RESET CONTROL DESION DEFICIENCY - ISE BULLETIN 89-06 M45992 ZION UNIT 1 - STATION BLACROUT PROCEDUI'tES F-63 8 TRAININO M46964 ZION 1 - NUREG-9737 III.A.1.2. TECNIIICAL F-64 SUPPORT CENTER l
ZION 1 - IIUREG-9737 III. A.1.2, OPERATIO90AL M46136 F-65 SUPPORT CENTER s .
ZION 1 - NUREG-9737 III. A.1.2, EMERGEllCY M47187 B-66 OPERATIONS FACILITY '
1946298 F-66 ZION 1 NATURAL CIRCULATIOII COOLDOINt (GENERIC 81-21)LTR ZION 1 - III.A.2 NUCLEAR DATA LINK M46289 F-67 DATA 4
1 M46351 F-64 ZION 1 - III. A.2.1 EMEltOENCY PLAN UPORADE TO MEET RULE 3-ZION 1 - NUREG-0737 III.A.2.2, METEOROLOGICAL 4
' 0046869 B-69 DATA UPoltADE
{ M46422 F-69 ZIoll 1 - PMR MSLB NITH CONTINUED FEEDNATER ADDITION Z1011 1 - NUltE0-8737 III.D.3.3, IIIPLANT M46555 F-70 ZION 1 - NUREG-0737, III.D.3.4, C001 TROL ROOM RADIO. TION MONITORING '
i "M46643 B-78 MARITABILITY f M56182 F-71 ZION 1 - MOIIITORIII0 0F FATIOUE TRANSIENT LIMITS F0ft THE REACTOR COOLANT SYST'EM **
l M49769 B-72 ZION 1 - I.D.1.2 DETAILED CollTROL ROOM DESIGN i REVIEN SUP91ARY REPORT - F-71 j M52814 B-76 ZION 1 - "NUREG 0737 TECH SPECS (GENERIC LETTER ZION 1 82-16 82-16 OR 83-02)*
. ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION
!. AND PROCEDURL':
i g ..
s_______ _ _ _ _ . _ _ _ _ _ . _ _ _ - _ _ _
88 "N '? "'! E, , ,/ . .
R-1208731-001 .'
REOULAT0RY INF0RMATION TRACRINO FACILITY I M P L E.M E N T A T I O N SYSTEM PAGE NO ZION 1 (CONTINUATION) es JAC NO. MPA_t TITLE i
M52895 B-77 M52976 3-78 ZION 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR ZION 1 - ITEMS 3.1.1 8 3.1.2 - INTERFACE - RTS COMPONENTS M53057 B-79 POST MAINTENANCE TESTING M53110 B-80 ZION 1-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CNANGES PROCEDURES / TO VENDOR RECOMMENDA TECM SPECS-RTS COMPONENTS M53163 3-81 ZION 1 - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED MODIFICATIONS ZION 1 - ITEMS 4.2.1 8 4.2.2 -
M53205 3-82 PREVENTATIVE MAINTENANCE M54580 B-83 ZION 1 - ITEM 4.3 - AUTOAMTIC ACTUATION OFPROGRAM SHUNT TRIP FOR REACTOR TRIP BREAK ZION 1 - TECHNICAL SPECIFICATIONS COVERED BY'0EMERIC ATTACNMENT FOR H AND B & N PLANTS M53648 B-85 LETTERS 83-36, 83-37 FOR NUREG-0737 M53731 5-86 ZION ITEM 1.2 - POST TRIP REVIEM-DATA AND CAPABILITY INfORMATION M53814 5-87 ZION 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR ZION 1- ITEMS 3.2.1 4 3.2.2 - POST-MAINT TESTING INTERFACE - ALL SR COMPONENTS M53897 B-88 M53950 3-89 ZION 1 - ITEM 3.2.3 - POST-MAINTENANCE TESTINOPROCEDURES ANO VENDOR RECOMMEN M55587 B-90 ZION 1 - ITEMS 4.2.3 4 4.2.4-PP.EVENTATIVE MAINTENANCE -CNANGES TO TECH. SPEC. - ALL SR COMP M54124 3-92 ZION 1 - ITEN 4.3(TS) - AUTOMATIC ACTUATIONPR00 RAM FOR RX TRIP BREAKERS -
OF SHUNT M54041 ZION ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TRIP FOR H AND 88N PLANTS - TECH SPECS B-93 CAPABILITY ZION 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM 9
FUNCTIONAL TESTING - ALTERNATIVE e
0 1
l 1 ..
~
se
___ { ,
R-120873f-est 4
! REOULki0RY INF0RMATION l l
FACILITY IMPLEMENTATION TRACKINO SY$ TEM l PAGE NO.
FACILITY: ZION 2 1 04/
j PLANT LOCATION:
DOCKET NUMBER: 40 MI N OF CHICA00, ILL 3
858-99394 ARCN/ ENGINEER: SSL LICENSED PONER: 3250 IG4T DESIGN POWER:
j IE INSPECTOR: 1949 MWE M. NOLZMER NSSS VENDOR: NEST PROJECT MANAGER: J. NORRIS BRANCN CHIEF: S. VARGA LIC. ASSISTANT: L. PARRISH l.
IAC MO._ IFA _3 TITLE M07035 A-01 _
MS7909 ZION 2 - INSERVICE INSPECTION 9 B-91 k M8864 -ZION 2 - DIESEL DENERATOR LOCKOUT E-91 k ZION 2 - SPENT FUEL POOL MOD M98259 C-01 ,
M40967 F-91 ZION 2 - PMR SECONDARY CHEMISTRY- GENERIC MONITORIl00 REQUIREMENTS M49684 0-81 ZION 2 - NUREG-9737 1.A.1.1 STA LONO TERM '
RE9UIREMENTS
! Me8131 A-92 ZION 2 - REACTOR COOLANT PUMP TRIP M44138 F-82 ZION 2 - APPENDIX I TECM SPEC IMPLEMENTATION REVIEN MOS871 ZION 2 - 100REO-9757 1.A.1.3.1, SHIFT MAllNING 3-92 ,
ZIO90 2 - FIRE PROTECTION OVERTIME LIMITS M8852 E-02 ZION 2 - BROPPED FUEL CASK '
M7882 D-92 i M7859 D-03 ZION 2 - ECCS ZIRC CLAD MODEL ERROR MS8867 ZION 2 PRESSURIZER NEATUP RATE
!, MS8489 ZION 2 - PHYSICAL SECURITY PROGRAM
\
B-03 i
M44209 F-03 ZION 2 - OENERIC - Plet MODERATOR DILUTION
\
{ MS8853 ZION 2 - NUREG-4737 I.A.2.1.4, UPORADING OF R0 C-94 ZION 2 - FILTER TECM SPECS AND SRO TRAINING
'M98863 A-94
! M88342 3-04 ZION 2 - CONTAINMENT LEAK TESTING - APP. J (GENERIC)
! M44280 ZION 2 - REACTOR VESSEL OVERPRESSURE PROTECTION F F-84 M44356 ZION 2 - NUREG-0737 I.C.1.2.A, INADE9UATE CORE F-05
!: ZION 2 - PROCEDURES GENERATION PACKAGECOOLING REVIEWOUIDELINES (NUREO 0737 $UPP/1) i I
i
I R-1288731-001 REOUL'ATORY INF0RMATION TRACRINO ZION 2 FACILITY $Y$ TEM (CONTINUATION) IMPLEMENTATION PAGE N0 0 IAC NO. MPA 0 00 TITLE M08844 E-OS M68875 C-06 ZION 2 - N-1 LOOP OPERATION ZION 2 - PWR PUMP & S/0 SUPPORTS - LAMELLAR TE M47264 F-86 M47336 F-07 ZION 2 - FEEDBACR 9F OPERATING ARING 8EXPERIENCE FRACTURE TOUONNESS MC8877 C-07 ZION 2 - CORRECT PERFORMANCE OF OPERATING (AP I.C.5)
M07832 3-07 ZION 2 - FUEL HANDLING ACCIDENT MENT INSIDE (API.C.6)
ACTIVITIES CONTAIN M08182 A-07 ZION 2 - STEAM GENERATOR FEEDWATER FLON INSTAB ILITY -
M68176 B-08 ZION 2 - FRACTURE TOUONNESS ND 0 REQUIREMENTS APPE M51218 F-88 ZION 2 - PNR HPSI-LPSI FLON RESISTANCE
- GENERIC M51298 F-09 ZION 2 - I.D.1.1 - DETAILED CONTROL N REVIEN ROON DESIG N08989 A-09 ZION 2 - I.D.2. SAFETY PARAMETER EM DISPLAY PROGRAM PLANSYST F-08 M68476 C-09 ZION 2 - PRESSURE VESSELVEILLANCE BELTLINE MATERIAL SUR '
N07838 B-09 ZION 2 - PHR AUXILIARY FEEDNATER -
) PUMPSSURVEILLANCE MATERIAL (GL 4 M19742 A-10 ZION 2 - PIPE VIBRATION PROBLEMS IN CVC SYSTEM '
M68873 D-10 ZION 2 - CONTINGENCY PLAN REVIEN -
M08093 C-10 ZION 2 - REVIEN OF ASYMMETRIC TAL LOCA LOADS SUBMIT M44418 F-10 ZION 2 -CONTROL OF HEAVYL POOL LOADS OVER SPENT FUE ZION 2 - NUREG-0737 II.B.1, RCS HION POINT M47987 F-11 (NUREG 0612) -
VENTS M19748 A-11 ZION 2 - PLANT SHIELDINO. .MODIFICATIONS 2) (11 B 2
'"H10005 D-11 ZION 2 - GUARD TRAINING PLAN REVIEN l M18744 A-12 ZION 2 - ENHANCED FISSION IGH ZION 2 - VITAL AREA ANALYSIS PRODUCT RELEASE FOR H BURNUP LHR FUEL M44488 F-12 F M44559 F-13 ZION 2 - NUREG-0737 II.B.3.2, POST ACCIDENT 8 ZION 2 - HUREG-0737 II.B.4.1, TRAINING FOR SAMPLING MODIFICATIONS MITIGATING CORE
.. , ...am g
R-1208731-001 REOULAT0RY ZION 2 INF0RMATION TRACKINO (CONTINUATION)
FAC1LITY SYSTEM IMPLEMENTATION PAGE No c IAC NO._ MPA 0 _
SC M08879 TITL E D-14 M08870 5-14 ZION 2 - REACTOR VESSEL NELD HIRE _
M44631 F-14 ZION 2 - CONTROL ROD GUIDE TUBE NEAR DEFICIENCY M43658 C-14 ZION 2 - RV AND SV. TESTING M12283 D-15 ZION 2 - SEISMIC QUALIFICATION XILIARY OF THE AU M46558 F-15 ZION 2 - NELB AND CONSEQUENTIAL LURE SYSTEM FEEDNATER SYSTEM FAI M52286 C-15 ZION 2 - NUREG-0737, II.E.1.1, AFM SYSTE
- ZION 2 M EVAL M59004 C-16 ZION 2 - CONTROL OF HEAVY 1 LOADS - PHASE 1 M44701 F-16 ZION 2 - UTILITY RESPONSES MMENDATIONS TO STAFF RECOOF MPASC-10)
(FOLLONUP M12130 3-16 ZION 2 - NUREG-0737 II.E.1.2.1, AFM SAF5TY GRADE M51368 A-17 ZION 2 - EMERGENCY PLAN REVIEN CONCERNING STEAM GENERATORS AUTO INITIATION
- 2)
M11229 B-17 ZION 2 - INSTRUMENTATION OURSE TO FOLLON THE C M44740 F-17 ZION 2 - NYDRAULIC SNUBBERS M SPECS UPGRADE TEC (RG 1.97)
OF AN ACCIDENT M43016 D-17 ZION 2 - NUREG-0737 II.E.1.2.2, AFN SAFE TY GRADE M44827 ZION 2 - TECHNICAL SPECIFICATIONS FLONDEFININd F-18 INDICATION M55757 A-18 ZION 2 - NUREG-0737 II.E.4.1.2. D* DEDICATE OPERABILITY FOR SAFETY SYSTEMS
' M55921 D-19 ZION 2 - TECH. SPECS. AFFECTED .
ND 50.73 BY 50 72 A HYDROGEN PENETRATIONS M44898 F-19 ZION 2 - DIESEL GENERATOR . SPECS. RELIABILITY TECN (GL 83-43)
M19279 B-20 ZION 2 - NUREG-0737 II.E.4.2, CONTAINMEN T (OL 84-15)
"M59161 A-20 ZION 2 - CONTAINMENT LEAKAGE DUE TO SEAT ISOLATION DEPENDAEILITY M44969 F-20 ZION 2 - 10CFR50.62 OPERATING IENS REACTOR REVDETERIORATION M45040 F-21 ZION 2 - NUREG-0737 II.F.1.1, NOBLE GAS M60778 ZION 2 - NUREG-0737 II.F.1.2, IODINE / **
A-21 MONITOR ZION 2 - 10CFR50.61, PRESSURIZED THERMAL PARTICULATE SAMPLING SHOCK RULE REQUIREMENTS, PHASE I
-' ~~ _
- T ..
{
R-1298731-991 '
ZION 2 REotiLAT.0RY .
INF0RMATION
\
\
(CONTINUATION) FACILITY TRACKINO j
i TAC NO. ?tPA.3 IMPLEMENTATION $YSTEM PAGE M11145 TITIf 5-21 Me8845 M45111 3-22 ZION 2 LOSS OF 125V AGE DC SUS VOLT M47648 F-22 ZION 2 - MECNAMICAL SNUSSERS
\
F-23 ZION 2 - NUREG-9737 II.F 1 3 M19942 3-23 ZION 2 - NUREO 9737 ITEM II F. . , CONTAINMENT HION M19199
{
M47719 B-24 ZION 2 - POTENTIAL E9UIPMENT 1.4 CONTAINMENT RANGE MONITOR i
F-24 ZION 2 - CONTAINMENT FAILURES PtNt0E ASSOCIATED MITH ORID PRES $URE I M42567 VOLTAGE j M47798 S-24 ZION 2 - NUREO 8737 ITEM II F1 ,
I M45181 F-25 ZION 2 - LONO TERM REVIEN CONT 5 CONTAINMENT .
_M19248 F-26 ZION 2 - NURES 9737 ITEM II F AllWEENT NATERPtNt0E (B-24)
LEVEL AND VENT MONITOR M46914 S-26 ZION 2 - NUREG-8737 II F 2 3 1.6 CONTAllIMENT k M49423 F-38 ZION 2 - INADVERTENT SAFETY INJ.HYDROGEN . IMADE90 ATE CORE MONITOR ,
\ M47828 3-32 ZION 2 - II K2.13 TMERMAL ECTION MANICAL MEC REPORTDURING )COOLDONN (PHR'SCOOLING IN F-33 ZION 2 - BLOCKING SI SIONAL E' M45258 F-36 ZION 2 - NUREO 9737 ITEM II K2, RING C00i.DONN k M45394 .17 POTENTIAL F-37 ZION 2 - NUREG-8737 . . . II K 3 1 '
M45391 F-38 ZION 2 - NUREG-9737 . .
II.K 3 2, AUTO PORV FOR VOIDING IN RCS i M08489 B-39 ZION 2 - NUREG-9737 II K 3 3, REPORT ON PORV ISOLATION M45421 , REPORT ON FAILURES
- M45470 F-39 ZION 2 - PNR PRESSURE-TEMPEAAT URE TECN SPECS F-48 ZION 2 - NUREG-9737 . . II.K 3 5 RV/SV FAILURES M45598 F-41 ZION 2 - NUREG-8737 . . . ,II K 3 9 , AUTO TRIP OF PID RCPS M11972 5-41 ZION 2 - NUREO-0737 II K 3 19
~.11719 5-42 ZION 2 - FIRE PROTECTION SER , ANTICIPATORY TRIP CONTROLLER s'
- ZION 2 - TNREE MILE ISLANO FOLLOW P MORK MODIFICATIONS USUPPLEMENT 92
- #' # ,s s-- __ __ _ -
at
-- - g j . .i l -
l R-1208731'-801 R E O U L A*T 0 R Y l
INF0RMATION TRACKINO 3YSTEM PAGE 100. 8
! FACILITY IMPLEMENTATION ZION 2 (CONTINUATION) -
34/1{
i TAC NO. frA 9 TITLE
, M45558 F-st2 ZION 2 - NUREG-0737 II.K.3.12, ANTICIPATURY TRIP I DN TURBINE TRIP M43160 3-43 ZION 2 - PNR FEERNATER LINE CRACKS .- LONG TERM CORRECTIVE ACTION i M11783 3-43 ZION 2- FEERNATER LINE CRACRS
- M12434 3-44 ZION 2 - LESSONS LEARNED IDFLEMENTATION ~ ~
M39117 B-44 ZION 2-2.2.1 A,3,C SHIFT SUPER. RESP.,
STA, TURNOVER PROCEDURES 1 M38118 B ZION 2-2.1.8.C IMPROVE 3 IODINE INST.
M39119 B-44 ZION 2-2.1.8,3 HION RA800E RADIATION ,. MONITORS
,M30128 3-44 '
ZION 2-2.1.8.A POST ACCIDENT SAMPLING M39121 3-44 ZION 2-2.1.6.3 SHIELDING REVIEN M39122 3-44 ZION 2-2.1.6.A SYSTEMS INTEORITY FOR HION RADI0 ACTIVITY
,M39123 .:
i 3-44 ZION 2-2.1.4 DIVERSE CONTAINMENT ISOLATIGli . .
M39124 5-44 ZION 2-2.1.3.3 INST. FOR CORE COOLING (INCN SUSC00 LING METER) '
M38125 3-44 ZION 2-2.1.~3.A DIRECT INDICATION OF VALVE POSITION ACTION e ,-
, M30126 B-44 ZION 2-2.1.2 RELIEF S SAFETY VALVE TESTING
} M38113 3-44 1 ZION 2-2.1.7.3 CONTROL ORADE AUX FEED
FLOW INDICATION j M30114 3-44 ZION 2-2,1.5 A,C DEDICATED M2 CONTROL
{'M3e115 B-44 PENETRATIONS S RECOMBINER PROCEDURE ZION 2-2.1.1. EMER. PONER SUPPLY PORV/
I BLOCK VALVE, PER NEATER & LEVEL M38116 B-44 ZION 2-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, .
M12943 3-45 OPERATIONAL SUPPORT CENTER l
- ZION 2 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES VALVES Mi23 3 3-4.
ZION 2 - ANAtYSIS Or TURBINE nISC CRACKS -
M126:3 3-47 ,
ZION 2 -ECCS CLAD $NELLING S RUPTURE j M45678 F-47 ZION 2 - NURE0-8737 II.K.3.17, ECC SYSTEM l OUTAGES B-48
! .M13998.
ZION 2 - ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES i
i 1
,y 3A- .. $ _ . .
R-1204731'-881 l .
REOULAT.0RY INF0mMATION TRACKINO ZION 2 FAC1LITY IMPLEMENTATION 5Y$ TEM PAGE N0. 8 (CONTINUATION) e4/)
JAC No. MPA 8 TITLE M11884 3-52 M44448 F-53 ZION 2 - REVIEW OF SAFETY ASPECTS OF INADVERTENT SAFETY M2196 ZION 2 - NUREO 0737, II.K.3.25, PONER ON PUMP SEALS ACTUATIONS DURING SURVEILLANCE TESTI 3-57 ZION 2 - DECAY NEA,T REMOVAL M5874 F-57 ZION 2 - NUREG-5737 II.K.3.30, SB LOCA CAPABILITY TECH SPECS M8215 F-54 ., OUTLINE M42872 3-53 ZION 2 -NUREG 0737 II.K.3.31 COMPLIANCE MITH
10 CFR 58.44 M2473 3-68 ZION 2 - MASONRY MALL DESION. RESPONSE ,
88-11TO IE BULLETIN M2717 B-61 ZION 2 - ENVIRONMENTAL trUALIFICATION OF SAFETY.
M2789 ZION 2 - IE BULLETIN 79-27, LOSS OF NON CLASS IE RELATED ELECTRICAL EQUIPMENT (80-C B-62 M43900 3-63 ZION 2 - ESF RESET CONTROL DESIGN DEFICfENCY INST 8 CONTR.- ISE PONER. REV. 8 EVAL. RE SULLETIN 88-04 M5993 F-63 ZION UNIT 2 - STATION BLACKOUT PROCEDURES S TRAINING ZION 2 - NUREG-0737 III.A.1.2, TECHNICAL M46965 F-64 ,
' ZION 2 - NUREG-4737 III.A.1.2, OPERATIONAL SUPPORT CENTER M46137 F-45 ZION 2 - NUREG-0737 III.A.1.2, EMER0ENCY SUPPORT CENTER '
M7184 B-66 OPERATIONS FACILITY M46299 F-64 ZION E NATURAL CIRCULATION COOLDONN (GENERIC 81-21) LTR M46281 ZION 2 - III.A.2 NUCLEAR DATA LINK
F-67 DATA M46352 F-68 SION 2 - III.A.2.1 EMER0ENCY PLAN UP0kADE TO MEET RULE ZION 2 - NUREG-9737 III.A.2.2, METEOROLOGICAL M6870 3-69 DATA UPORADE M46423 F-69 POINT BEACM 2 - EXTENSION OF NUREG-9737 ZION 2 - NUREG-9737 III.D.3.3, INPLANT SUPPLEMENT 1 ORDER DATES (SAS, REO. OUIDE i.97 AND EOF)
"M6557 F-70 ZION 2 - NUREG-9737,III.D.3.4 CONTROL ROOM RADIATION MONITORING M46644 3-78 NABITABILITY J M56183 F-71 ZION 2 - MONITORING OF FATIOUE TRANSIENT LIMITS M49778 ZION 2 - I.D.1.2 DETAILED CONTROL ROOM DESIGN
, FOR THE REACTOR COOLANT SYSTEM B-72
" REVIEN SUMNARY REPORT - F-71 ZION 2 - "NUREO 0737 TECM SPECS (GENERIC LETTER 82-16 82-16 OR 83-02)"
_ - -- _ __ _ _ _ _ _ _ _ - - - - - - -i
II -
-- r ~ *
-1 ,
l R-titi8731-901 REOUL5T1RY INF0RMATIeN TRACKINO 3YSTEM '
PAGE NO.
FACILITY I M P L E M E N T A T I.O l? -
ZION 2 (CONTINUATION) 84/.
.\
TAC NO. MPA 9 TITLE MS2815 B-76 . '
l M52896 ZION 2 - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES
't 3
3-77 ZION 2 - ITEM 2.1 - E9UIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS
{ M52977 B-78 ZION 2 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING f M53054 3-79 PROCEDURES / VENDOR RECOMMENDATIONS ZION 2-tTEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECM SPECS-RTS COMPONENTS M53111 B-88 M53144 ZION 2 - i'EACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATES MODIFICATIONS 3-81 ZION 2 - ITL*$ 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENANCE MS3206 3-82 PROGRAM FOR REACTOR TRIP BREAKERS - MAI ZION 2 - ITEM 4.3 - AUTOAMTIC ACTUATION OF SilUNT TRIP M54581 3-83 ATTACHMENT FOR M AND B 8 M PLANTS ZION 2 - TECHNICAL SPECIFICATIONS COVERED BY GENERICLETTERS 83-36, 83-37 FOR NUREG-8737 M53649 E-85 ZION 2 - ITEM 1.2 - POST TRIP REVIEM-Be.TA AND INFORMATION CAPABILITY f M53732 3-86 ZION 2 - ITEM 2.2 - E90IPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53815 3-87 ZION 2- ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING M53898 B-88 PROCEDURES AND VENDOR REC 099fENDATIONS 'ALL SR COMPI ZION 2 - ITEM 3.2.3 - POST-MAINTEMAIICE TESTING l M53951 3-89 -CHAIIGES TO TECH. SPEC. - ALL SR COMPONENTS ZIOff 2 - ITEMS 4.2.3 8 4.2.4-PREVENTATIVE MAINTEIIANCE
{ M55388 E-90 PROGRAM FOR RX TRIP BREAKERS - LIFE TESTI ZION 2 - ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SMUllT M54125 3-92 TRIP FOR M AND B8M PLANTS - TECM SPECS ZIOll 2 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL CAPABILITY 4
M54942 3-93
, , ZION 2 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM
. FUIICTIONAL TESTING - ALTERNATIVES S TEST IN t
=
l ,e
}
k__.____________.____--------- ~ ~ ~ _ __ __ _ . _ _ . . - _ - - - - - - ~ - - - - - - - - ~ - - ' -