ML20197C359

From kanterella
Jump to navigation Jump to search
Forwards Action Plan for Tornado Missile Problem.Requests Comments on Sched.W/O Encl
ML20197C359
Person / Time
Issue date: 04/04/1978
From: Costello J
NRC OFFICE OF STANDARDS DEVELOPMENT
To: Chan C
ELECTRIC POWER RESEARCH INSTITUTE
Shared Package
ML20197C120 List:
References
REF-GTECI-A-38, REF-GTECI-IT, TASK-A-38, TASK-OR NUDOCS 7811210070
Download: ML20197C359 (1)


Text

-_____

W>

4e APR

.1

..,,7g l

i Dr. Conwy Chan l

Electric Power T'esearch Institute P. O. Box 10d1?

Palo /lto, CA 94303

Dear Conuay:

Enclosed is a copy of the action plan for the tornado missile problem.

Please note the projected availability dates for the EPRI reports.

If they no lenger look realistic, please let me know.

l 1 look forward to your cooperation in the resolution of the safety issues related to the tornado missile phenonenon.

Sincerely, I

S ( 3 F C c-A d c James F. Costello Engineerinn :'ethodology Standards Bra nch

Division of Engineerinn Standards l

Of fice of Standards Develorment 1

cc:

Dr. '.. A. Tw i s da l e l

Carolina Power and Light Co.

P. O. Box 1551 Raleigh, M. C.

27602 bec:

R. Minogue DISTRIBUTION R. Smith CENTRAL FILES G. Arlotto SD ALPHA M. Kehnemuyi SD RD V. Panciera EMSB:RD, SJ, C 7811210070 Task No.

EM 501-4 4/4/78 jfh,,

SD:EMSB JCg{o 4/ 4 /78 om*

t I.,rm MC 318 (Rn. 9.$3) AICM 0240 W u. s. novERNM ENT PRm TmG OFFICEI 1974,536-166