Page 1 of 3 DSAR-Appendix A Quality Assurance Program Rev 1 Safety Classification:
Usage Level:
Safety Information Change No.:
EC 70143 Reason for Change:
This section is being updated to reflect changes to the Quality Assurance Topical Report to align its scope based on FCSs decommissioning status.
Preparer:
Hugenroth, R.
Fort Calhoun Station
DSAR-Appendix A Information Use Page 2 of 3 Quality Assurance Program Rev. 1 Table of Contents
1.0 INTRODUCTION
.......................................................................................................... 3
DSAR-Appendix A Information Use Page 3 of 3 Quality Assurance Program Rev. 1
1.0 INTRODUCTION
OPPD has ultimate responsibility for assuring that the Fort Calhoun Station is designed, maintained, tested, and operated in compliance with applicable regulations, codes, and standards and in a manner to protect the health and safety of the public.
In meeting this responsibility, a Quality Assurance program has been established and implemented which complies with the provisions of:
- a.
Title 10, Code of Federal Regulations Part 50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants", and
- b.
Applicable sections of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code.