Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR 2.11, Rev. 3, Section 2 References
ML20170A396
Person / Time
Site: Fort Calhoun, 07100256  Omaha Public Power District icon.png
Issue date: 04/30/2020
From: Carlson J
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20170A380 List: ... further results
References
LIC-20-0005
Download: ML20170A396 (6)


Text

Page 1 of 6 DSAR-2.11 Site and Environs Section 2 References Rev 3 Safety Classification:

Usage Level:

Safety Information Change No.:

EC 70091 Reason for Change:

Remove EOF and TSC from DSAR Preparer:

J. Carlson Fort Calhoun Station

DSAR-2.11 Information Use Page 2 of 6 Section 2 References Rev. 3 Table of Contents 2.11 Section 2 References.................................................................................................... 3

DSAR-2.11 Information Use Page 3 of 6 Section 2 References Rev. 3 2.11 Section 2 References

1. Letter from R. G. Burnett, U. S. Army Corps of Engineers to E. G. Drdla, OPPD; dated November 11, 1971
2. Nebraska, A Survey of Universal Knowledge, Volume 16, Encyclopedia Britannica, Inc., Chicago, Illinois, 1959
3. Climatography of the United States No. 60-25, Climates of the States, Nebraska, U. S. Department of Commerce, Weather Bureau, 1959
4. Local Climatological Data, Annual Summary with Comparative Data for Omaha (North), Nebraska 1990, U. S. Department of Commerce, NOAA, NCDC, Asheville, NC
5. Local Climatological Data Annual Summary with Comparative Data for Omaha (Eppley Airfield) Nebraska, U.S. Department of Commerce, NCAA, NCDC, Asheville, NC
6. Krist, James G. Establishing Meteorological Correlations Between the North Omaha National Weather Service Station and the Fort Calhoun Nuclear Station, Master's Thesis, The University of Nebraska - Omaha, October 1991
7. Lundlum, David M., Weather Record Book, United States and Canada, Weatherwise, Inc., Princeton, New Jersey, 1971
8. Climatography of the United States, No. 81 (Nebraska), Monthly Normals of Temperature, Precipitation and Heating and Cooling Degrees Days 1941-70, U. S. Department of Commerce, NOAA, August, 1973
9. DELETED
10. Sagendorf, J. F., A Program for Evaluating Atmospheric Dispersion from a Nuclear Power Station, NOAA Tech. Memo. ERL-ARL-42, 1974
11. Yanskey, G. R. et al., Climatography of National Reactor Testing Station, Idaho Operations Office, USAEC, IDO-12048, 1966
12. Private Communication, Hipp, C. L., Department of the Army, Army Corps of Engineers, Omaha District, to De la Cruz, F., GHD&R, February 7,1967.

(WIP No. 2270).

13. Missouri River Flooded Areas Volume 1, Army Corps of Engineers, October, 1977

DSAR-2.11 Information Use Page 4 of 6 Section 2 References Rev. 3

14. Local Climatological Data, Annual Summary, Omaha (Eppley Airfield), Nebraska, 1985, NOAA, NCDC, Asheville, NC
15. Local Climatological Data, Monthly, Omaha (Eppley Airfield), Nebraska, 1982, 1983 and 1984, NOAA, NCDC, Asheville, NC
16. Implementation of Alternative Source Terms Site Boundary and Control Room Dose Analyses for Fort Calhoun Station, Stone and Webster, January 2001
17. Flood Insurance Study, City of Blair, Nebraska, Washington County, Community Number 310228, Federal Emergency Management Agency, July 17, 1995
18. Terracon Project No. 05077135, Hydrogeologic Assessment Report (revised)

OPPD Nuclear Power Generating Station, Fort Calhoun, Nebraska, November 18, 2008

19. Review of Ground Water Protection Program at the Fort Calhoun Nuclear Power Station, TSD#08-015, Revision 01, May 30, 2008
20. Memorandum of Conference between GHD&R and OPPD, held February 15 and 16, 1967, at Gibbs and Hill, Inc., New York, N.Y. (WIP No. 2277)
21. Letter from Charles L. Hipp, U.S. Army Corps of Engineers, to T.E. Short, OPPD, December 12, 1967. (WIP No. 19888)
22. EA10-032 Rev. 0, External Flooding Design Basis
23. Safety Evaluation of the Omaha Public Power District Fort Calhoun Station, Unit No. 1, Issue Date: August 9, 1973, Suppl. 1 - April 23, 1973
24. Safety Guide 23, Onsite Meteorological Programs, dated February 17, 1972
25. Environmental Statement Related to Operation of Fort Calhoun Station Unit 1, August 1972
26. Proposed Revision 1 to Regulatory Guide 1.23, Meteorological Programs in Support of Nuclear Power Plant, dated September 1980
27. DELETED
28. NUREG-0654, Rev 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, dated October 1980

DSAR-2.11 Information Use Page 5 of 6 Section 2 References Rev. 3

29. NUREG-0696, Functional Criteria for Emergency Response Facilities, dated February 1981
30. DELETED
31. DELETED
32. Letter from Omaha Public Power District to NRC, Generic Letter 82-33, Supplement 1 to NUREG-0737, Emergency Response Capabilities, dated April 15, 1983 (LIC-83-0093)
33. Letter from NRC to Omaha Public Power District, NRC Inspection Report 50-285/85-19, dated January 29, 1986 (NRC-86-0027)
34. Calculation FC06247, Meteorological Monitoring Instrument Uncertainty, dated June 30, 1995
35. Modification MC-FC-89-057, 110M Weather Tower Data Collection System
36. CR2010-2387-011 (CAPR), Revise USAR-2.7, to describe the Physical Protection of Vital Structures and Equipment from Flooding to a River Level of 1014' msl including the basis for the 1009.5 and 1014' msl levels
37. NRC Safety Evaluation Supporting Amendment No. 272 to Omaha Public Power District, dated July 26, 2013 (NRC-13-0095)
38. Regulatory Guide 1.76, Revision 1, Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants, March 2007
39. NRC Safety Evaluation Supporting Amendment No. 274 to Omaha Public Power District, dated January 28, 2014 (NRC-14-0001)
40. Calculation FC07384, River Level Required to Maintain RW / CW Pump Minimum Submergence - Includes Variation With Stop Log Height and Frazil Ice Considerations, dated April 27, 2009
41. Calculation FC08400, Submergence Requirements for OPPD Raw Water Pumps, dated October 21, 2014
42. Calculation FC08081, Sizing and Selection for Intake Cell Flood Water Inlet Valves for the AOP-01 Raw Water Flow Path, dated June 23, 2015
43. Calculation FC08429, Intake Structure CW Backwash Pipe Stress Analysis, dated December 1, 2015
44. Calculation FC08431, CW-152 Trash Rack Backwash Piping Penetration and Valve Seismic Evaluation, dated December 1, 2015

DSAR-2.11 Information Use Page 6 of 6 Section 2 References Rev. 3

45. NRC Safety Evaluation Supporting Amendment No. 282 to Omaha Public Power District, dated June 30, 2015 (NRC-15-058)
46. Calculation FC06806, OPPD Meteorological Data Conversion to ARCON 96 and SWEC Formats, dated April 15, 2002
47. Calculation FC06807, Atmospheric Dispersion Coefficients (X/Qs) at the Control Room and TSC Air Intakes for Identified Design Basis Accidents Release Points, dated July 21, 2015
48. Calculation FC06808, Atmospheric Dispersion Coefficients (X/Qs) at the EAB and LPZ for Identified Design Basis Accidents Release Points, dated July 21, 2015
49. EP-FC-1001 Addendum 2 Rev. 0 Evacuation Time Estimates for Fort Calhoun Nuclear Station
50. Memo, KLD Engineering, P.C., 50 Mile Population Calculation from 2010 and 2020 from Kevin Weinisch, dated December 3, 2012