- r Helping Build Mississippi M M P. O.
B O X 164 0, J AC K S ON, MIS SIS SIP PI 3 9 2 05
- " " ','J,.,'J,^,7 " "
May 10, 1973 United States Atomic Energy Commission g.g%,
g Washington, D. C.
20545 Attention:
Mr. A. Giambusso, Deputy Director
/*
6h Q n[y,,,g,s ' hgi
,h for Reactor Projects al Directorate of Licensing i d W,,A, ';9, i 'l h
SUBJECT:
Grand Gulf Nuclear Station
'{,. <
Units 1 and 2 W_
Qi
\\h[/Mp[k.[7 Project 9645 Docket No,'s 50-416/417 File 0272/
AEC Press Release Concerning Standardization AECM-34 Gentlemen:
We are writing in response to your letter of April 26, 1972, suggesting that we amend our Application for the Grand Gulf Nuclear Station by reducing the thermal power output of our reactors.
As you are aware, we tendered our Application on September 25, 1972 on the basis of a 3833 Mst rating for each reactor.
During the year prior to our filing, we met on several occasions with members of the regulatory staff to discuss our proposed plans including the proposed power level.
On November 17, 1973 you docketed and started the review of our Application on the basis of 3833 Hat reactor power.
We note that page 7 of the Regulatory Staf f's study (Enclosure 2 to your letter) states that "The size of all new plants accepted for licensing review... will be limited to power levels of less than 3800 megawatts thermal..."
Our plant had been "accepted for licensing review" several months prior to the issuance of the March 3, 1973 AEC press re' Lease. Additionally, you have issued the Draft Enviconmental Statement on the basis of 3833 Hat; the DES concludes "that the action called for under the National Environmental Policy Act of 1969 (NEPA) and Appendix D to 10 CFR Part 50 is the issuance of a construction permit We have proceeded to purchase the reactors and the turbine generators on the basis of 3833 Hat as filed and accepted for review.
While the reduction of power level to 3800 Mwt would not significantly reduce the cost of the plant, the resultant station loss of approximately 22 Mae output (11 Mae per unit) represents a loss of base load capacity which 8806160109 000606 PDR FOIA pDR CONNORO 91 e#
Member Middle South Utilities System b!Y
k SISSIPPI POWER & LIGHT COMI lY e
o 1
5.s U. S. Atomic Energy Commission May 10, 1973 AECM-34 1
would cost us approximately $11,000,000 to replace.
We would also point out that the 251" reactor vessel used in our reactors has been previously licensed and the fuel and Emergency Core Cooling System design represents a more conservative design than many of those previously. licensed.
However, in light on your statement concerning the simplification of the review of our Application, we would be pleased to discuss further with you any issues concerning our reactor power icvel which may jeopardize the review schedule we have both pledged to maintain.
Yours very truly, N. L. Stampley f