ML20149L629

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Supporting Proposed Design for Standby Liquid Control Sys.Tech Spec Change Request Needed by 880331
ML20149L629
Person / Time
Site: Oyster Creek
Issue date: 02/18/1988
From: Dromerick A
Office of Nuclear Reactor Regulation
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20149L631 List:
References
TAC-66126, NUDOCS 8802240332
Download: ML20149L629 (2)


Text

a

I '

IfEB 181988 Docket No. 50-219 Mr. P. B. Fiedler Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Fiedler:

i

SUBJECT:

STANDBY LIQUID CONTROL SYSTEM COMPLIANCE WITH THE ATWS RULE - 10 CFR 50.62(c)(4) - OYSTER CREEK NUCLEAR GENERATING STATION (TAC h0. 66126)

By letter dated September 3, .1987 and December 30, 1987, GPU Nuclear Corporation provided information concerning the requiren;ents of 10 CFR 50.62 for Oyster Creek Nuclear Generating Station. Based on our review of this inforvation, we have concluded that the proposed design for the Standby Liquid Control System is consistent with the requirement of 10 CFR 50.62(c)(4) and is acceptable. This is discussed in the enclosed Safety Evaluation. Other matters related to the requirements of 10 CFR 50.62 will be the subject of a future letter from the staff when the evaluation is conpleted.

It is requested that you submit a Technical Specification Change Request that will provide limiting conditions for operations and surveillance requirements for the Standby Liquid Control System as discussed in the staff's Safety Evaluation. You are requested to respond to this request by March 31, 1988 so that the staff can conplete its review in accordance with the schedule nmpletion date.

The reportinC and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.I.97-511.

Sincerely, original signed by Alexander W. Dromerick, Project Manager Project Directorate I-4 Division of Reactor Projects I/II

, Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure See next page 88022403328802]9 p

DR ADOCK 0 DISTRIBUTION <

.aDoctet File ? A. Dromerick "hRC Alocal PDRs OGC )

PD#14 Rdg. E. Jordan l S. Varga J. Partlow i B. Boger ACRS(10) l S. Norris Grey File l LA:PDI- FFgfDI D. 4

$larri AbVorf r k:bd JSt ' zN 2 'Y 02/g 8 02/ /88 l

(

Mr. P. B. Fiedler Oyster Creek Nuclear

, Dyster Creek Nuclear Generating Station Generating Station

~

ec: l Ernest L. Blake, Jr. Resident Inspector  !

Shaw, Pittman, Potts and Trowbridge e/o U.S. NRC 2300 N Street, kk' Post Office Box 445 Washington, D.C. 20037 Forked River, New Jersey 08731 J .B . Li be rnan , Esqui re Commissioner Bishop. Liberman, Cook, et al. New Jersey Department of Energy  !

1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Mr. David M. Scott, Acting Chief Regional Administrator, Region I Bureau of Nuclear Engineering U.S. Nuclear Regulatory Commission Department of Environmental Protection 631 Park Avenue .

CN 411 -

King of Prussia, Pennsylvania 19406 Trenton, New Jersey 08625 o BWR Licensing Manager  !

GPU Nuclear Corporation l

d. 1 Upper Pond Road  !

Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey 1 Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township .

818 West Lacey Road Forked River, New Jersey 08731 Licensing kanager Cyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg. '

P. O. Box 3B8 Forked River, New Jersey 08731 4

9 e