ML20149K214

From kanterella
Jump to navigation Jump to search

Forwards Rev 54 of Lasalle Nuclear Power Station Security Plan.Encl Withheld
ML20149K214
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/15/1996
From: Johnson I
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M65376, TAC-M65377, NUDOCS 9602220042
Download: ML20149K214 (2)


Text

.-

~. -.

e jg Commonwcahh Ediw>n Compan)

'lli Somh Llark Street P O ik3x ~6" chiami. n. m,w n,-

i 1

February 15,1996 CERTIFIED Mall d

j U.S. Nuclear Regulatory Commission ATTN: Document Control Desk I

Washington, DC 20555 q

)

i

Subject:

LaSalle N=_W-- Power Station Units 1 and 2 LaSalle Station Security Plan i

NRC Docket Nos. 50-373-50-374 l

TAC Nos. 65376/65377 j

Enclosed is the original and three (3) copies of Revision 54 of the LaSalle 1

i Nuclear Power Station Security Plan. This submittal contains the following 2

changes:

j i

Chapter 1:

CECO definition changed to Comed Clarifies the training requirements in the watchman category Defines the Vehicle Barrier System Chapter 3:

Reduces the frequency of security patrols p

i i

Chapter 5:

Identifies the Vehicle Barrier System l

Conects a Vital Area door number Eliminates certain security requirements for controlling access of l

personnel and materials into reactor containment in accordance with the deletion of paragraph (d)(8) of 10 CFR 73.55 as published j

September 7,1995 in the Federal Register Figure 5-2 identifies existing Lake Screen House gates and reflects the Service Building now as the Training Building i

l Chapter 9:

i Eliminates the need for an armed member of the security l

organization te process through the firearms detector during the course of official duties subsequent to their initial entry and search.

Chapter 15:

Clarifies the personnel involved in conducting independent security 220076 96oY/2oo42,6021s

/

j</,6; i h

PDR ADOCK 05000373

_f' /

r F

ppg t

y i

M k 2M3snBei A L:nicom Company i

e U.S.N.R.C.

Page Two Appendix B Eliminates the polygraph examination due to the Access Authorization requirements which have surpassed any benefit received f~)m the polygraph examination. Therefore, the polygraph is considered to be a duplication of effort and no longer provides benefit.

Pursuant to 10CFR 50.54(p), the signed original and three copies of the Security Plan revisions are being provided to your office. A copy of this letter and two copies of the Security Plan revisions are being sent to Region Ill.

We have concluded that these changes do not decrease the safeguards effectiveness of the plan. These enclosures contain Safeguards Information which must be protected from public disclosure pursuant to 10CFR 73.21.

Sincerely, C'

y//bilsfJNj &fx v

-fe M. Johnson Licensing Operations Director Enclosures cc:

H. Miller (w/two encls.)

THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Upon separation. this paae is decontrolled 3

-