Other: ML19342D046, ML20045H049, ML20064B717, ML20065A040, ML20072H397, ML20078H835, ML20083M358, ML20091K242, ML20094H550, ML20094K513, ML20094S337, ML20099F133, ML20100G704, ML20100G719, ML20100G725, ML20101K416, ML20105B980, ML20105C354, ML20128K728, ML20149K214, ML20197D356, ML20211B100, ML20216B539, ML20217F961
|
MONTHYEARML20091K2421992-01-10010 January 1992 Forwards Rev 40 to Security Plan,Addressing Issues Raised in NRC .Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20094H5501992-02-20020 February 1992 Forwards Rev 41 to Security Plan.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20094S3371992-04-0303 April 1992 Forwards Rev 42 to Security Plan.Rev in Response to 10CFR73.56 & Reg Guide 5.66.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20101K4161992-06-23023 June 1992 Forwards Rev 42 to Security Plan.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20099F1331992-07-28028 July 1992 Forwards Rev 43 to Plant Security Plan,Updating App E & Reflecting Changes Necessary to Facility Improvement Project.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20105B9801992-09-11011 September 1992 Forwards Rev 44 to Security Plan.Rev Adds Alternate Perimeter Alarm Reporting Sys & Redundant Access Control Sys to Security Plan.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20105C3541992-09-17017 September 1992 Forwards Rev 45 to Security Plan.Rev & Addendum Address Concerns Listed in Cd Pederson .Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20128K7281993-02-0404 February 1993 Forwards Rev 46 to Security Plan.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20045H0491993-06-17017 June 1993 Forwards Rev 44 to Security Plan Addressing Issues Re Use of Alternate Perimeter Alarm Sys & Redundant Access Control Sys.Rev 44 Withheld (Ref 10CFR73.21) Project stage: Other ML19342D0461993-10-21021 October 1993 Forwards Rev 47 to LaSalle Nuclear Power Station,Units 1 & 2 Security Plan,Per 10CFR50.4.Plan Withheld,Per 10CFR73.21 Project stage: Other ML20064B7171994-02-25025 February 1994 Forwards Rev 48 to Security Plan,Addressing Issues Identified by Jr Creed,In Response to Rev 47 of Plant Security Plan.Rev Withheld,Per 10CFR73.21 Project stage: Other ML20065A0401994-03-30030 March 1994 Forwards Rev 49 to Security Plan.Rev Withheld,Per 10CFR73.21 Project stage: Other ML20072H3971994-08-22022 August 1994 Forwards Copy of Rev 50 of Facility Security Plan.Rev Addresses Issues Identified in Ja Zwolinski Response of 940426 Re Submittal of Rev 49 of Security Plan Project stage: Other ML20078H8351995-01-31031 January 1995 Forwards Rev 51 to Security Plan.Plan Withheld Project stage: Other ML20083M3581995-05-0505 May 1995 Forwards Rev 52 of Plant Security Plan,Addressing Issue Identified in Rj Caniano Re Rev 48 of Plant Security Plan.Encl Withheld Per 10CFR73.21 Project stage: Other ML20094K5131995-11-0808 November 1995 Forwards Rev 53 to Security Plan.Encl Withheld Per 10CFR73.21 Project stage: Other ML20149K2141996-02-15015 February 1996 Forwards Rev 54 of Lasalle Nuclear Power Station Security Plan.Encl Withheld Project stage: Other ML20100G7191996-02-19019 February 1996 Forwards New Cover Page for Rev 54 of Plant Security Plan. Insert Signed Cover Page W/Rev 54 & Destroy Unsigned Page. Encl Withheld Project stage: Other ML20100G7041996-02-20020 February 1996 Forwards Rev 55 to Security Plan.Rev Identifies Hand Geometry Biometric Sys Proposed for Implementation at Plant. Rev Withheld,Per 10CFR73.21 Project stage: Other ML20100G7251996-02-20020 February 1996 Requests Exemption from Certain Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities ...Against...Sabotage, to Allow Use of Hand Geometry Biometric Sys.Details Encl.Encl Withheld (Ref 10CFR73.21) Project stage: Other ML20211B1001997-09-12012 September 1997 Informs That Revised Security Plan Was Inaccurate Due to Realignment of Nuclear Operating Division Organizational Structure on 970903.Submittal of Current Structure Will Be Made by 971103 Project stage: Other ML20217F9611997-10-0202 October 1997 Forwards Rev 56 of LaSalle Nuclear Power Station Security Plan Which Reflects Changes in Organizational Structure of Utils Nuclear Security Dept.Plan Withheld Project stage: Other ML20197D3561997-12-18018 December 1997 Forwards Rev 57 of LaSalle Nuclear Power Station Security Plan Which Identifies Implementation of New Security Computer Sys,Per 10CFR50.54(p).Plan Withheld Project stage: Other ML20216B5391998-05-0101 May 1998 Forwards Rev 58 of LaSalle Security Plan.Rev Withheld,Per 10CFR73.21 Project stage: Other 1994-03-30
[Table View] |
Text
..
r Comm:nwntth Edison 125 Soi rth Clark Street, Chicago. Ilknois Address Re;#y to-Post Offce Boa 767
/
Chcago,lilinois 606910767 October 21,1993 CERTIFIED Mall U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
LaSalle Nuclear Power Stations Units 1 and 2 LaSalle Station Security Plan NRC Docket Nos. 50-373 & 50-374 7AC Nos 65376/65377 m
Enclosed are the original and three (3) copies of Revision 47 of the LaSalle Nuclear Power Station Security Plan. This Revision addresses an inspector follow-up item identified in LaSalle's inspection Report dated June 30,1993 which stated that some Security Plan drawings of the Main Access Facility (MAF) did not accurately reflect the building design. The Security Plan drawings of the MAF have been updated to better rcflect actual building design. In addition, a number of Security Plan drawings were updated to include the construction of a new service building and warehouse. This Revision also defines the Perimeter Intrusion Detection System (PIDS), eliminates the color coding of security badges to indicate employment relationship and updates the current station organizational ctructures as it applies to the Security Department.
Pursuant to 10CFR 50.4, the signed original and three copies of the security plan revisions are being provided to your off%a. A copy of this letter and two copies of the security plan revisions are being sent to Region Ill.
We have concluded that these changes do not decrease the safeguards effectiveness of the nian. These enclosures contain Safeguards Information which must be protected from p-
,a disclosure pursuant to 10CFR 73.21.
Sincerely, g.,t,lrene M. Johnson Licensing Operations Manager Enclosures cc: John B. Martin (w/two encls.)
THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Upon separation, this ga_ge is decontrolled
\\
I 931t030329 931021 hDR ADOCK 05000373 I