ML20065A040

From kanterella
Jump to navigation Jump to search

Forwards Rev 49 to Security Plan.Rev Withheld,Per 10CFR73.21
ML20065A040
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/30/1994
From: Johnson I
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M65376, TAC-M65377, NUDOCS 9403300275
Download: ML20065A040 (1)


Text

'

Ccmm::nw=lth Edison

{ 125 South Clark Stred Chicago, Ilknois Address Reply to Post Office Box 767 g

Chicago, libnois 60690 076,'

March 30,1994 CERTIFIED MAIL U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

LaSalle Nucjaar Power Stations Units 1 and 2 LaSalle Station Security Plan NBC Docket Nos. 50-373 & 50-374 TAC Nos. 65376/63377 Enclosed are the original and three (3) copies of Revision 49 of the LaSalle Nuclear Power Station Security Plan. This revision identifies the generic security changes being implemented at Commonwealth Edison's six (6) nuclear generating stations. The attached provides a detailed explanation of the changes along with a technical evaluation of the " Limbo System".

Pursuant to 10CFR 50.54(p), the signed original and three copies of the security plan revisions are being provided to your office. A copy of this letter and two copies of the security plan revisions are being sent to Region Ill.

We have concluded that these changes do not decrease the safeguards effectiveness of the plan. These enclosures contain Safeguards information which must be protected from public disclosure pursuant to 10CFR 73.21.

Sincerely, r

i D,

f Irene M. Johnson Licensing Operations Manager Enclosures cc: John B. Martin (w/two encts.)

THE ENCLOSURE COETAINS SAFEGUARDS INFORMATION Lipon s.aparation, thisJaae is decontrolled I

/2I V'D f

l

$$83388SESo$0!h3

'F .

L

---vvo