is en s..r...,.
..a..:
be.:.enbe: d. 19 E.-
Lochet No. %-341 MEMDRANDUM FVRt. Region III Tile TH RU:
J. E. Konklin, Chief, Projects Section IA TRDM:
P. M. Byron, SRI Terr.i JI
SUBJECT:
ALLEGTION RECEIVED BY TERMI II SAFETIAM On August 22, 19E3, Nuclear Inergy Services (NES) employee si the f ollowing allegation in his exit interview to the Terr.i II Fefeteam.
2.
No docuser.tation to verify that ultrasonic r.achiner are in horizontal or vertical linearity. RE:
AWS D1.1 1972 Idition 2.
T. lute heads in Airlock and Sican Tunnel - About 24 welds that require UT inspection - Inspection could not be perfoITned as documented.
At least 22 or the 24 have. incomplete fusion.
3.
NES was asked to perform I-ray inspection of jet pumps.
Due to configuration of equipment, an oversize
- film was utilized.
The welds that were the targets of the inspection were satis-f actory, but a number of welds adjacent to the target welds were found to be rejectable. Hollingsworth (Wismer & Becker) fe' requested NES to cut film to eliminate reject welds.
The film and reports have been manipulated to conceal rejectable welds.
A surveillance report was issued on t.his but the number is.
unknown. Wayne Leaverett of PDA was also involved in the above situation.
4.
A number of UT reports purportedly signed by the interviewee are forgeries.
The licensee is currently investigating these allegations.
The NRC inspectors will perform a followup of the licensee's action on this ratter and will doeurtent their findings in.a subsequent inspection report.
Jt" C
\\
P. M. byron SRI, Terni II PC- : r.a.k 8802190280 800216 Q4 C M PDR FOIA a*