ML20149H406

From kanterella
Jump to navigation Jump to search
Forwards Safeteam Responses to Interviews 44,370,385,487 & 495.W/o Encl
ML20149H406
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/23/1984
From: Byron P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20149H143 List:
References
FOIA-86-202 NUDOCS 8802190254
Download: ML20149H406 (1)


Text

/m

~

C

  • WM l
  • g, UNITE 3 STATES f'

NUCLEAR REGULATGRY COMMISSION n

{

,I CE lONill g

/

799 ROOSEVELT ROAD l

g

,/

GLEN E LLYN,lLLINotS 60m

....+

Octobe r 23, 1984 Docket No. 50-341 MEMDRANDUM,FDR:

R. C. Knop, Chief, Projects Section 1C F70M:

P. M. By ron, S RI, Fe mi 2 SUBJECri SAFETEAM Concern Responses Attached are the SAFETEAM responses to the following interviews:

Nos. 44, 370, 385, 487, and 495.

These concerns had been previou' sly sent to Region III.

I am also enclosing the response to interview No. 565 relating to fire protection issues.

This concern had previously been transmitted to C.

Ramsey.

The responses to items 1 and 2 of interview No. 385 should be re-j viewed by M&PS during a subsequent inspection.

Deco filed a 50.55(e) l report (83-14-EE) (Deco No. 100) for item 2 which is still open.

I a

O' l

ox P. M. By on, S RI, Fe rmi 2 I

PMB mak Enclosures CC:

T.

Ramsey (Interview No. 565 only) l OCT 2 61984

~8802190204 000216 PDR FOIA GARDE 06-202 PDH


o