ML20149H406
| ML20149H406 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/23/1984 |
| From: | Byron P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20149H143 | List:
|
| References | |
| FOIA-86-202 NUDOCS 8802190254 | |
| Download: ML20149H406 (1) | |
Text
/m
~
C
- WM l
- g, UNITE 3 STATES f'
NUCLEAR REGULATGRY COMMISSION n
{
,I CE lONill g
/
799 ROOSEVELT ROAD l
g
,/
GLEN E LLYN,lLLINotS 60m
....+
Octobe r 23, 1984 Docket No. 50-341 MEMDRANDUM,FDR:
R. C. Knop, Chief, Projects Section 1C F70M:
P. M. By ron, S RI, Fe mi 2 SUBJECri SAFETEAM Concern Responses Attached are the SAFETEAM responses to the following interviews:
Nos. 44, 370, 385, 487, and 495.
These concerns had been previou' sly sent to Region III.
I am also enclosing the response to interview No. 565 relating to fire protection issues.
This concern had previously been transmitted to C.
Ramsey.
The responses to items 1 and 2 of interview No. 385 should be re-j viewed by M&PS during a subsequent inspection.
Deco filed a 50.55(e) l report (83-14-EE) (Deco No. 100) for item 2 which is still open.
I a
O' l
ox P. M. By on, S RI, Fe rmi 2 I
PMB mak Enclosures CC:
T.
Ramsey (Interview No. 565 only) l OCT 2 61984
~8802190204 000216 PDR FOIA GARDE 06-202 PDH
o