Informs That Util Completed Committed Actions Prior to Exceeding 5% Power Operation.Issuance of Full Power License Recommended
ML20149H158
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/12/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20149H143 List:
References
FOIA-86-202 NUDOCS 8802190154
Download: ML20149H158 (2)


Text

_

- ' t a

q., } } 2 q

JUL 121985 i,

MEMORANDUM FOR: Harold R. Denton, Director, Office of Nuclear Reactor Regulation ,

~'

FROM: James G. Keppler, Regional Administrator, Region III

SUBJECT:

8ENMlIl8NlADINESSFORFULLPOWERLICENSE 1

Region III has verified that Detroit Edison Company has completed. actions which they had connitted to complete prior to exceeding five percent power  ;

operation.

j All allegations related to Fenni have been reviewed by my staff. Onsite l inspections of all technical issues have been performed as required, and the i findings have been evaluated by management. While some reports are not yet  !

issued, no items have been identified to preclude issuance of a full power 1 license.  :

We believe the licensee is ready and competent to operate Fenni 2 safely. We  :

recommend issuance of a full ~ power license conditioned as ~ described in i Attachment 1.

Origtnn1 signed by  ;

J. anes G. Kappler James G. Xcppler Regional Administrator

Attachment:

As stated RIII RIII RIII Ch otimos/r1 is K p er 7/12/85 L i SS M

f4 UN D 02

> . ,0.'

) ")

i ATTACHMENT 1 PRE 0PERATIONAL TESTS, STARTUP TESTS AND OTHER ITEMS FERMI-2 Docket No: 50-341 This attachment identifies certain preoperational tests and other items which must be completed to the Commission's satisfaction and identifies the required timing for their completion.

S. .

The preoperational tests and testing deficiencies identified in Attachments A and B respectively, to the July 8,1985, letter from Wayne H. Jens to Janes G. Keppler shall be completed in accordance with the scheduled commitments contained in those attachments.

2. Prior.to startup following the first refueling outege, correct all remaining draving deviations identified during walkdowns associated with the

' resciution of 10 CFR 50.55(e), Item No. 143, "Deviations of As-built Plant from Design Documents." Demonstrate that all design documents related to the subject 50.55(e) Item No.143 are reconciled to tiie as-built configur- -

ation of the plant."