CY-20-009, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019
| ML20143A097 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/16/2020 |
| From: | Lenois J Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| CY-20-009 | |
| Download: ML20143A097 (2) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 April 16, 2020 CY-20-009 10 CFR 50.4 and 10 CFR 50.36a(a)(2)
A T1N: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket No. 50-213) 7 z._ - /) 3 CJ I
Subject:
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic Power Company (CY APCO) Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI), and Section F.2 of the Off-Site Dose Calculation Manual (ODCM) for the Haddam Neck ISFSI require CY APCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 through December 31, 2019.
Section 2.3.1 of Appendix C of the CY APCO QAP for the Haddam N eek ISFSI and Section F.1 of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2019.
Section 2.2.c of Appendix C of the CY APCO QAP for the Haddam Neck ISFSI requires CY APCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the ODCM for the Haddam N eek ISFSI were issued in calendar year 2019.
If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 303.
Respectfully, a
if'-~s;,
JimLenois ISFSI Manag*er
)-!Jl>9
-cE4P
_;.---r~zs jV"JSS_ 2
~
rvHS5
Connecticut Yankee Atomic Power Company CY-20-009/April 16, 2020/Page 2
Enclosures:
- 1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January -December 2019.
- 2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January-December 2019.
cc:
D. Lew, NRC Region I Administrator A. Dimitriadis, Chief, Decommissioning Branch, NRC, Region I J. McKirgan, Chief, Division of Fuel Management, Storage and Transportation Licensing Branch J. Semancik, Director, CT DEEP, Radiation Division