ML20141N715
Jump to navigation
Jump to search
| ML20141N715 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/31/1985 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20141N703 | List: |
| References | |
| NUDOCS 8603170554 | |
| Download: ML20141N715 (1) | |
Text
..... -. _ _ _ _ _.
OPERATING DATA REPORT DOCKET NO. 50_-364 DATE Fech 4.1986 COMPLETED BY J.D.Woodard s
TELEPHONE onunoo_s156 OFERATING STATUS g, y,gg y,,,.
Joseph M. Farlev - Unit Notes
- 2. Reperdag Puted: Decembe r. 1985
- 1) Cumdlative data since
- 3. t la===l Thennel Power (MWt): 2,652 7-30-81, date of consnereial 860 operation.
4, p g,gg,, (g,,, gy,).
a29
- 5. Desip Eisseisel Redag(Not MWe):
- 6. Maximum Dependable Cepecity (Gross MWe): 850.2
- 7. Manissum Dependable Cepecity (Net MWe):
809.2
- 8. If Chemens Oscar in Capacity Resimp (leases Number 3 Thsough 7) Since Last Reps. t. Give Reasons:
N/A N/A
- 9. Power Level To Whsch Resericted.If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
WA This Month YrAo.Dete~
Canaletive
!!. Hours la Reporting Period 744 8,760 38,785
- 12. Nanber Of Hows Reactor Was Critical 744.0 6,888.1 38,806.6 u.v 0.0 138.0
- 13. Reester Rassen Shusdown Hows
- 14. Hours Generosor On.Line 744.0 6.814.3
- 13.392.4
- 15. Unit Reserve Shusdown Hours 0.0 0.0 0.0
- 16. Gross Thennel Emergy Generated (>*H) 1.962.073 17.381.802 e4.234.550
- 17. Gross Electrieel Energy Generated tMWH) 647.616 5.776.406 27.722.65l8
- 18. Nt Eleserieel Eiwegy Generated (MWH) 617.316 5.470.318 26.289.240
- 19. Unit Service Factor 100.0 77.8 86.1
- 20. Unit Availability Facto, 100.0 77.8 86.1
- 21. Unit Capacity Factor (Using MDC Nt) 102.5 77.2 83.7 100.1 75.3 81.b
- 22. Unit Capedty Factor (Using DER Nt) 0.0 z.2 4.g
- 23. Unit Forced Outage Rete
- 24. Shutdowns Scheduled Over Nat 6 Months (Type. Dete. and Duratka of Each t:
Re f ueline /n. min tenan ce outane. 4/4/86. anoroximately 5 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status IPrior io Commercial Operation 1:
Forecast Achwved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 0603170554 860310 DR ADOCM O 364 py-,
-