ML20141N715

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Dec 1985
ML20141N715
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1985
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20141N703 List:
References
NUDOCS 8603170554
Download: ML20141N715 (1)


Text

..... -. _ _ _ _ _.

OPERATING DATA REPORT DOCKET NO. 50_-364 DATE Fech 4.1986 COMPLETED BY J.D.Woodard s

TELEPHONE onunoo_s156 OFERATING STATUS g, y,gg y,,,.

Joseph M. Farlev - Unit Notes

2. Reperdag Puted: Decembe r. 1985
1) Cumdlative data since
3. t la===l Thennel Power (MWt): 2,652 7-30-81, date of consnereial 860 operation.

4, p g,gg,, (g,,, gy,).

a29

5. Desip Eisseisel Redag(Not MWe):
6. Maximum Dependable Cepecity (Gross MWe): 850.2
7. Manissum Dependable Cepecity (Net MWe):

809.2

8. If Chemens Oscar in Capacity Resimp (leases Number 3 Thsough 7) Since Last Reps. t. Give Reasons:

N/A N/A

9. Power Level To Whsch Resericted.If Any (Net MWe):
10. Reasons For Restrictions. If Any:

WA This Month YrAo.Dete~

Canaletive

!!. Hours la Reporting Period 744 8,760 38,785

12. Nanber Of Hows Reactor Was Critical 744.0 6,888.1 38,806.6 u.v 0.0 138.0
13. Reester Rassen Shusdown Hows
14. Hours Generosor On.Line 744.0 6.814.3
13.392.4
15. Unit Reserve Shusdown Hours 0.0 0.0 0.0
16. Gross Thennel Emergy Generated (>*H) 1.962.073 17.381.802 e4.234.550
17. Gross Electrieel Energy Generated tMWH) 647.616 5.776.406 27.722.65l8
18. Nt Eleserieel Eiwegy Generated (MWH) 617.316 5.470.318 26.289.240
19. Unit Service Factor 100.0 77.8 86.1
20. Unit Availability Facto, 100.0 77.8 86.1
21. Unit Capacity Factor (Using MDC Nt) 102.5 77.2 83.7 100.1 75.3 81.b
22. Unit Capedty Factor (Using DER Nt) 0.0 z.2 4.g
23. Unit Forced Outage Rete
24. Shutdowns Scheduled Over Nat 6 Months (Type. Dete. and Duratka of Each t:

Re f ueline /n. min tenan ce outane. 4/4/86. anoroximately 5 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status IPrior io Commercial Operation 1:

Forecast Achwved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 0603170554 860310 DR ADOCM O 364 py-,

-