e OPERATING DATA REPORT DOCKET NO.50-36c DATE. March 4.1986 COMPLETED BY J. D.'..' oo d a r d TELEPHONE (205)89'-5156 OPERATING STATUS Joseph M. Farley - Unit 2 Not**
I*
"IIN***
- 1) Cumulative data since JanuarF' 1985
- 2. Reportas Penod:
7-30-81, date of commercial l 2652
- 3. Licensed Thennal Power (MWt):
,p,,,ti,3, 860 l
- 4. Namepiste Rating (Gross MWe):
i 829
- 5. D-saga Elecincal Rasms (Net MWe):
850.2
- 6. Maximum Dependable Capacity (Gross MWe):
Roo.?
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Item (<6 and (7 have been changed due to evaluation of operating experience.
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr..to-Date Cumulatne 744 744 30.7Ao
- 11. Hours In Reporting Penod 96.2 96.2 27.014.7
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 13E.0
- 13. Reactor Reserve Shutdown Hours
.0 96.0 2 e', M. I
- 14. Hours Generator On.Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 239.473 239.473 67.092,221
- 16. Gross Thermal Energy Generated (MWH) 77,496 77,498 22.023,7M
- 17. Gross Electrical Energy Generated (MhH) 69.316 69.316 20, PSP,23E
- 18. Net Electrical Energy Generated (MWH) 12.9 12.9 6n.7
- 19. Unit Service Factor 12.9 12.9 86.7
- 20. Unit Availability Factor A)
11 S 83.*
- 21. Unit Capacity Factor iUsing MDC Net) 11.2 I1.2 81.9
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 5.4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete. and Duration of Eschi:
N/A 3-19-85
- 25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
- 26. Units in Test 5tatus IPnor to Commercial Operation):
Forecast Achies ed 05-06-81 05-08-61 INITIAL CRITICALITY 05-24-81 05-25-81 INITIAL ELECTRICITY 06-01-81 0 7 E l COMMERCIAL OPERATION 1
8603170543 860310 PDR ADOCK 05000364 R
)
_, _ _ _ ~. _. _.. _ _ _ _. -. _ _ _.,. _ _ _ - _ _ _. ~ _ _ _