Corrected Page to Monthly Operating Rept for Jan 1985.Items 6 & 7 Re Max Dependable Capacity Changed Due to Evaluation of Operating Experience
ML20141N704
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/31/1985
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20141N703 List:
References
NUDOCS 8603170543
Download: ML20141N704 (1)


Text

-

e OPERATING DATA REPORT DOCKET NO.50-36c DATE. March 4.1986 COMPLETED BY J. D.'..' oo d a r d TELEPHONE (205)89'-5156 OPERATING STATUS Joseph M. Farley - Unit 2 Not**

I*

"IIN***

1) Cumulative data since JanuarF' 1985
2. Reportas Penod:

7-30-81, date of commercial l 2652

3. Licensed Thennal Power (MWt):

,p,,,ti,3, 860 l

4. Namepiste Rating (Gross MWe):

i 829

5. D-saga Elecincal Rasms (Net MWe):

850.2

6. Maximum Dependable Capacity (Gross MWe):

Roo.?

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Item (<6 and (7 have been changed due to evaluation of operating experience.

N/A

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

N/A This Month Yr..to-Date Cumulatne 744 744 30.7Ao

11. Hours In Reporting Penod 96.2 96.2 27.014.7
12. Number Of Hours Reactor Was Critical 0.0 0.0 13E.0
13. Reactor Reserve Shutdown Hours

.0 96.0 2 e', M. I

14. Hours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 239.473 239.473 67.092,221
16. Gross Thermal Energy Generated (MWH) 77,496 77,498 22.023,7M
17. Gross Electrical Energy Generated (MhH) 69.316 69.316 20, PSP,23E
18. Net Electrical Energy Generated (MWH) 12.9 12.9 6n.7
19. Unit Service Factor 12.9 12.9 86.7
20. Unit Availability Factor A)

11 S 83.*

21. Unit Capacity Factor iUsing MDC Net) 11.2 I1.2 81.9
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 5.4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete. and Duration of Eschi:

N/A 3-19-85

25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
26. Units in Test 5tatus IPnor to Commercial Operation):

Forecast Achies ed 05-06-81 05-08-61 INITIAL CRITICALITY 05-24-81 05-25-81 INITIAL ELECTRICITY 06-01-81 0 7 E l COMMERCIAL OPERATION 1

8603170543 860310 PDR ADOCK 05000364 R

PDR

)

_, _ _ _ ~. _. _.. _ _ _ _. -. _ _ _.,. _ _ _ - _ _ _. ~ _ _ _