ML20141N711

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Aug 1985
ML20141N711
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1985
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20141N703 List:
References
NUDOCS 8603170550
Download: ML20141N711 (1)


Text

.-

~.

OPERATING DATA REPORT DOCKET NO. 50-364

.DATE March 4.

1986 COMPLETED BY 1 D-L'ooda rd s

TELEPHONE r,nu goo-5156 OPERATING STATUS

1. Unit Name:

' ^ " " "

      • 1="

""h

?-

2. Reperdag Peted:

'""u=r-10A%

k) Cuciulative daea since

3. Llammand Thenmal Power (MWt):

26s2 7-30-81, date of 4, y,,,,g,,, g,gg,, (g,,, gw,y.

860 conroercial operation.

5. Dougn Electrient Rating (Net MWe):

829

6. Manismen DepsedeWe Capsesty (Gross MWe):
    • ^ 9
7. Mamissum DependeWe Capacity (Net MWe):

M.2

8. If Changes Oscur in Capacity Ratings (Items Nuseher 3 Tluough 7)Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. lf Amy (Net MWe):

N/A

10. Reasons For Restrictions. lf Any:

N/A 9

i TWs Month Yr to Date Cumulative j

II. Hours la Reporting Period 74 a' 5.R31 3 5. 9 S r,

12. Number Of Hours Reactor Was Critical 679.2 3.959.I 30,877.e
13. Reester Reserve Shusdown Hour 0.0 0.0 136.0
14. Hours Generator On-Line 673.9 1.9n%.4 7n u,1. ;
15. Unit Reserve Shutdown Hours 00 0.0 c.0 l
16. Gross Thennel Energy Generated (MWH) 1.739.9s3 9,770.472 76,623,220
17. Gross Electriesl Inorgy Generated (MWH) 573.562 3,so

,,e 25.185.t.In i.

18. Mt Electrieel Energy Generated (MWH) 543,470

, 'ni, j,a, 23,871.414

19. Unit Serv 6es Feetor 90.6 66.6 85,o
20. Unit Availshility Factor 90.6 66.6 90.3 64.7_

85.0

31. Unit Capacity Factor IUsing MDC Nt)
22. Unit Capacity Factor (Using DER N )

an.I a3 3 t,

nn,

23. Unit Terced Outage Rate 9.4 t7 5.2
24. Shutdowns Scheduled Over Nxt 6 Months (Type. Dete.and Duration of Each t:

N/A i

23. If Shut Down At End Of Report Period. Estiansted Date of Startup:

N/A

26. Units in Test Status Prior to Commercial Operation):

Forecast Achieved i

INITIA L CRITICALITY 5-6-81 5-B-81 INITIAL ELECTRICITY 5-24-81 5-25-81 COMMERCIAL OPERATION c 1 o'

7

'C o 1 S603170550 940310 PDR ADOCK 05000364 R

PDR sut*7