ML20141N711
Jump to navigation
Jump to search
| ML20141N711 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/31/1985 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20141N703 | List: |
| References | |
| NUDOCS 8603170550 | |
| Download: ML20141N711 (1) | |
Text
.-
~.
OPERATING DATA REPORT DOCKET NO. 50-364
.DATE March 4.
1986 COMPLETED BY 1 D-L'ooda rd s
TELEPHONE r,nu goo-5156 OPERATING STATUS
- 1. Unit Name:
' ^ " " "
- 1="
""h
?-
- 2. Reperdag Peted:
'""u=r-10A%
k) Cuciulative daea since
- 3. Llammand Thenmal Power (MWt):
26s2 7-30-81, date of 4, y,,,,g,,, g,gg,, (g,,, gw,y.
860 conroercial operation.
- 5. Dougn Electrient Rating (Net MWe):
829
- 6. Manismen DepsedeWe Capsesty (Gross MWe):
- ^ 9
- 7. Mamissum DependeWe Capacity (Net MWe):
M.2
- 8. If Changes Oscur in Capacity Ratings (Items Nuseher 3 Tluough 7)Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Amy (Net MWe):
N/A
- 10. Reasons For Restrictions. lf Any:
N/A 9
i TWs Month Yr to Date Cumulative j
II. Hours la Reporting Period 74 a' 5.R31 3 5. 9 S r,
- 12. Number Of Hours Reactor Was Critical 679.2 3.959.I 30,877.e
- 13. Reester Reserve Shusdown Hour 0.0 0.0 136.0
- 14. Hours Generator On-Line 673.9 1.9n%.4 7n u,1. ;
- 15. Unit Reserve Shutdown Hours 00 0.0 c.0 l
- 16. Gross Thennel Energy Generated (MWH) 1.739.9s3 9,770.472 76,623,220
- 17. Gross Electriesl Inorgy Generated (MWH) 573.562 3,so
,,e 25.185.t.In i.
- 18. Mt Electrieel Energy Generated (MWH) 543,470
, 'ni, j,a, 23,871.414
- 19. Unit Serv 6es Feetor 90.6 66.6 85,o
- 20. Unit Availshility Factor 90.6 66.6 90.3 64.7_
85.0
- 31. Unit Capacity Factor IUsing MDC Nt)
- 22. Unit Capacity Factor (Using DER N )
an.I a3 3 t,
nn,
- 23. Unit Terced Outage Rate 9.4 t7 5.2
- 24. Shutdowns Scheduled Over Nxt 6 Months (Type. Dete.and Duration of Each t:
N/A i
- 23. If Shut Down At End Of Report Period. Estiansted Date of Startup:
N/A
- 26. Units in Test Status Prior to Commercial Operation):
Forecast Achieved i
INITIA L CRITICALITY 5-6-81 5-B-81 INITIAL ELECTRICITY 5-24-81 5-25-81 COMMERCIAL OPERATION c 1 o'
7
'C o 1 S603170550 940310 PDR ADOCK 05000364 R
PDR sut*7