ML20141N714
Jump to navigation
Jump to search
| ML20141N714 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/30/1985 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20141N703 | List: |
| References | |
| NUDOCS 8603170553 | |
| Download: ML20141N714 (1) | |
Text
-
OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 4.1986 COMPLETED BY J. D. Woodard TELEPHONE r?nu agg_s156 OPERATING STATUS
- 1. Unit Name: J seph M. Farley - Unie 2 N*t#
November, 19 85
- 2. Reporthis Period:
g
- 3. IJeassed Theriaal Power (MWt):
2,652 7-30-81, date of cornercial 860
- 4. Namepiste Rating (Gross MWe):
operation.
829
- 5. Demon Electrical Rats (Net MWe):
- 6. Maximust IL,
'-t Capacity (Gross MWe): 850.2 809.2
- 7. Maninnent Dependable Capacity (Net MWe):
- 8. If Champes Occur in Capacity Ratings (Itenes Nussber 3 Thsough 7) Since 1.aet Report. Give Reasons:
N/A
/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
O
~
This Month Yr..to Dete Cumulative 720 8,016 38,041
- 11. Hours la Reporting Perted
- 12. Number Of Hours Reactor Was Critical 720.0 6.144.1 33.062.6 0.0 0.0 138.0
- 13. Reactor Reserve Shutdown Hours 7z0.0 6,o70.3 32,64 e 4
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,874,503 10.455,729 82,308,477
- 17. Gross Electrieel Energy Generated (MWH) 625.098 5,128,790 27.075.072 595,532 de,853,0 {
25,671,924
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Samos Facto, 100.0 r5'. 7 8 '.. e 100.0 75.7 85.8
- 20. Unit Availabdity Factor
- 21. Unit Capacity Factor (Using MDC Net) 102.2,,
74.8 83.3
- 22. Unit Capacity Factor (Using DER Net) 99.B 73.0 81.4
- 23. Unit Forced Outage Rate 0.0 2.4 4.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each t:
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achmed INITIAL CRITICALITY 05-08.-81 0,1-qS,g,1 INITIAL ELECTRICITY 05-24-81 05-25-81 0&Ol-81 07-30-81 COMMERCIAL OPERATION 8603170553 860310 PDR ADOCK 05000364 R
PDR WAl
.