ML20141N712
Jump to navigation
Jump to search
| ML20141N712 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/30/1985 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20141N703 | List: |
| References | |
| NUDOCS 8603170551 | |
| Download: ML20141N712 (1) | |
Text
n
[
OPERATING DATA REPORT DOCKET NO. 50-364 DATE _)1 arch 4.1986 COMPLETED BY t n Lan Am rd TELEPHONE (205)899-5156 OPERATkNG STATUS i
- 1. Unit Name:- J 8ePh M. Farley Unit 2 Notes
- 2. Reporting pwted: September, 1985
- 1) Cuniulative data since 2652 7-30-81, date of
- 3. Liseased Theriaal Power (MWt):
860 coneercial operation,.
- 4. Namepiste Rating (Gross MWe):
- 29
- 5. Demon Electrical Rates (Net MWe):
- 6. Maaksum Dependable Capacity (Gross MWe):
850.2
- 7. Maaimuss Dec"- Capacity (Na MWe):
809.2
- 8. If Changes Occur in Capeaty Ratags (Iteams Number 3 Thsough 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Le~el To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any: M/A h
i This Month Yr. to.Dete Cumulative 720 6,551 36.576
!!. Hours la Reporting Period
- 12. Nusaber Of Hours Reactor Was Critical 720.0 4,6 79.1 31,597.6
- 13. Reactor Reserve Sheadown Hours 0.0 0.0 136.0 nu.o 4,oud.J J1,ae;.4 g,
- 15. 'Jnit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Emergy Generated (MWH) 1,867,238 11,637,710 78,490.458
- 17. Gross Electrical Energy Generated (MWH) 618,848 3,857,976 25.804.258
- 18. Net Electrieal Energy Generated (MWH) 589,632 3,642,124 24,461.046 100*U 70'3 55 3
- 19. Unit Serv 6ce Factor 100.0 70.3 85.3
- 20. Unit Avadability Factor 101 2 68.7 82.6
- 21. Unit Capacity Factor IUsing MDC Net) 98.8 67.1 80.7
- 22. Unit Capacity Factor (Using DER Net) 23, Unit Forced Outage Rate 0.0 3.2 5.1 i
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete. sad Duration of Each t:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status iPrior to Commercial Operation):
Forecast Achie$ed l
M 05/06/81 05/08/81
.y INITIAL CRITICALITY INITIAL ELECTRICITY 05/24/81 US/25/81 COMMERCIAL OPERATlON 08/01/81 07/30/81 r
8603170551 960310 PDR ADOCK 05000364 R
PDR (4/ T
.