MONTHYEAR05000267/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl1983-03-0909 March 1983 Forwards LER 83-009/01T-0.Detailed Event Analysis Encl Project stage: Other ML20080G2081983-09-0606 September 1983 Forwards Response Spectra Curves Used in Reanalysis of Masonry Block Walls,Per Request.Walls Reanalyzed Per IE Bulletin 80-11 for SSE W/Damping Value of 5% Project stage: Other ML20080H0681983-09-16016 September 1983 Masonry Wall Design,Fort St Vrain Nuclear Plant, Technical Evaluation Rept Project stage: Other ML20082K4571983-11-0808 November 1983 Responds to Re IE Bulletin 80-11, Joint Reinforcement in Masonry Walls. Reevaluation Will Be Made of All Class I Masonry Walls Seismically Qualified Considering Dur-o-Wall as Structural Element Project stage: Other ML20079H5421984-01-0606 January 1984 Provides Alternative Acceptance Criteria for Determining Workability of Concrete During Period in Which 1-1/2 H Time Requirement Deleted from Bldg 10 Concrete Spec Project stage: Other ML20093G1291984-07-0606 July 1984 Informs That Util Completed Const Work on 840706 Re Joint Reinforcement in Masonry Walls Per IE Bulletin 80-11.No Structural Credit Taken for Dur-O-Wall in Masonry Block Walls Near safety-related Equipment Project stage: Other ML20108F4381985-03-0101 March 1985 Forwards Sketches Indicating Method Utilized to Reinforce Walls & List of Reworked Walls,Per IE Bulletin 80-11 & Response to NRC 850116 Telcon Questions Project stage: Other ML20132G0221985-07-16016 July 1985 Notifies That Three of Five Unmortared Stacked Block Walls Will Not Be Mortared in Place by 850802,per 850301 Commitment,Due to High Radiation Levels Near Fuel Storage Well.Completion Anticipated by 851231 Project stage: Other ML20141K2701986-01-15015 January 1986 Forwards Sser Based on Review of Util 850301 & 0716 Addl Info Re Compliance W/Ie Bulletin 80-11,Items 2(b) & 3 for safety-related Masonry Walls.Remaining Wall Designs Adequate.Items Fully Implemented Project stage: Approval ML20141K2741986-01-15015 January 1986 Sser Supporting Util 850301 & 0716 Addl Info Re Compliance W/Ie Bulletin 80-11,Items 2(b) & 3 for safety-related Masonry Walls Project stage: Other 1984-01-06
[Table View] |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20246J3261989-08-30030 August 1989 Safety Evaluation Supporting Amend 72 to License DPR-34 ML20245J3781989-08-14014 August 1989 Safety Evaluation Supporting Amend 71 to License DPR-34 ML20245J4511989-08-0808 August 1989 Safety Evaluation Responding to Issues Re Tech Spec Upgrade & Plant Defueling.Stated Tech Spec Sections Should Be Upgraded ML20246J3131989-07-0707 July 1989 Safety Evaluation Concluding That Operators Role in Mitigating High Energy Line Break at Facility Acceptable ML20247R2261989-05-26026 May 1989 Final Safety Evaluation Re LER 87-20 Concerning Interactions Between Steamline Rupture Detection/Isolation Sys,Plant Protective Sys & Control Sys at Facility ML20245C5031989-04-18018 April 1989 Safety Evaluation Supporting Amend 70 to License DPR-34 ML20248D6501989-03-31031 March 1989 Safety Evaluation Supporting Amend 69 to License DPR-34 ML20236A1401989-02-27027 February 1989 Safety Evaluation Supporting Amend 68 to License DPR-34 ML20235T4511989-02-24024 February 1989 Safety Evaluation Re Facility Core Support Flow Vent Sys. Continued Operation of Facility W/Current Core Support Flow Sys Configuration Acceptable ML20235J3421989-02-16016 February 1989 Safety Evaluation Supporting Util Action in Response to Generic Ltr 83-28,item 2.1 (Part 2) Confirming Establishment of Interface W/Either NSSS Vendor or Vendors of Each Component in Reactor Trip Sys ML20235J3841989-02-13013 February 1989 Safety Evaluation Concluding That Continued Operation of Facility Not Affected by Steam Generator Tube Failures Experienced by Advanced gas-cooled Reactors ML20195D3911988-10-27027 October 1988 Safety Evaluation Supporting Corrective Actions of LER 86-017 ML20205G0021988-10-24024 October 1988 Safety Evaluation Supporting Amend 65 to License DPR-34 ML20154J8021988-09-15015 September 1988 Safety Evaluation Supporting Amend 64 to License DPR-34 ML20154J4621988-09-15015 September 1988 Safety Evaluation Supporting Amend 63 to License DPR-34 ML20207F0571988-08-10010 August 1988 Safety Evaluation Supporting Util 870206 Submittal Re Safe Shutdowns During Postulated Accident Conditions ML20207F0431988-08-0505 August 1988 Safety Evaluation Supporting Amend 61 to License DPR-34 ML20207F2411988-08-0505 August 1988 Safety Evaluation Supporting Amend 62 to License DPR-34 ML20151M1601988-07-21021 July 1988 Safety Evaluating Supporting Requirements for Redundancy in Responding to Rapid Depressurization Accident ML20151A9961988-06-20020 June 1988 Safety Evaluation Supporting Amend 60 to License DPR-34 ML20195K0651988-06-15015 June 1988 SER Concurring W/Util Proposed Corrective Actions in Engineering Rept Entitled, Rept of Helium Circulator S/N 2101 Damage & Inlet Piping S/N 2001 Repair & Mod Activities ML20195F9661988-06-15015 June 1988 Safety Evaluation Re Destructive Exam Rept for Fuel Test Assembly-2.Fuel Represented by Fuel Test Assembly-2 Predicted to Be Safe for Operation in Facility for 1,800 EFPDs ML20154F8891988-05-10010 May 1988 Safety Evaluation Re Proposed Safe Shutdown Sys & Exemption Requests Concerning 10CFR50,App R.Licensee Request for Exemptions in Listed Areas Should Be Granted.Concept for Providing post-fire Shutdown Acceptable ML20148S6031988-04-0707 April 1988 Safety Evaluation Supporting Amend 59 to License DPR-34 ML20151B6651988-04-0101 April 1988 Supplemental Safety Evaluation Supporting Util Compliance w/10CFR50.App R Re Safe Shutdown DHR Capacity ML20150C4541988-03-10010 March 1988 Safety Evaluation Concluding That Seismic Analysis Methods for Bldg 10 & Walkover Structure Conservative.Gaps Provided Adequate to Accommodate Relative Motions Which Occur Between Subj Structures & Walkover Structure & Turbine Bldg ML20147C8181988-02-25025 February 1988 Safety Evaluation Supporting Changes to Interim Tech Specs 3/4.1.7, Reactivity Change W/Temp NUREG-1220, Safety Evaluation Accepting Plant Special Senior Licensed Fuel Handler Initial & Requalification Operator Training Program,Per NUREG-1220, Training Review Criteria & Procedures1988-01-13013 January 1988 Safety Evaluation Accepting Plant Special Senior Licensed Fuel Handler Initial & Requalification Operator Training Program,Per NUREG-1220, Training Review Criteria & Procedures ML20237D7631987-12-18018 December 1987 Safety Evaluation Updating 861118 Fire Protection Sys Safety Evaluation.Util Alternate Fire Protection Configuration Acceptable ML20149E1621987-12-18018 December 1987 Marked-up Safety Evaluation Re Proposed Safe Shutdown Sys & Exemption Requests Concerning 10CFR50,App R ML20236U6961987-11-23023 November 1987 Safety Evaluation Supporting Amend 57 to License DPR-34. Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise,Limiting Condition for Operation..., Technical Evaluation Rept Encl ML20236U5761987-11-20020 November 1987 Safety Evaluation Re Helium Circulator S/N C-2101 Damage. Util Corrective Action Program Initiated ML20236R3001987-11-13013 November 1987 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Programs for All safety-related Components ML20238C7621987-09-0202 September 1987 Safety Evaluation Concurring W/Util 870702 & 27 Ltrs & 870818 Telcon Re Elimination or Reduction of Maint Requirements on Certain Fire Seals ML20235N6491987-07-13013 July 1987 Safety Evaluation Supporting Amend 56 to License DPR-34 ML20235F5281987-07-0202 July 1987 Safety Evaluation Re Safe Shutdown of Steam Generator Matls. Under Severe Transient Conditions,Fuel Temp Can Be Maintained Under Accepted Temp Limits & Plant Can Be Safely Shutdown ML20235F5151987-07-0202 July 1987 Safety Evaluation Re Safe Emergency Shutdown of Reactor Sys. Operation at 82% Acceptable ML20235F5441987-07-0202 July 1987 Safety Evaluation Re Effect of Firewater Cooldown on Steam Generator Structural Integrity.All Tests Acceptable ML20235E5281987-06-29029 June 1987 Safety Evaluation Supporting Amend 55 to License DPR-34 ML20216G9511987-06-24024 June 1987 Revised Safety Evaluation Re Steam Line Rupture Detection & Isolation Sys (Slrdis).Slrdis Meets Requirements of 10CFR50, App A,Gdc 20 & GDC 4 ML20216G9911987-06-24024 June 1987 Supplemental Safety Evaluation Supporting Application for Amend to License DPR-34 Re Tech Specs for Steam Line Rupture Detection & Isolation Sys ML20215J5401987-06-22022 June 1987 Draft Safety Evaluation Re Safe Emergency Shutdowns.Facility Operation at 82% Power Acceptable ML20216J1921987-06-17017 June 1987 Safety Evaluation Re Mods to Reduce Moisture Ingress Into Reactor Vessel.Periodic Insps & Preventive Maint Should Be Performed on Pertinent Components.Operational Performance Should Be Continuously Upgraded ML20214M4681987-05-20020 May 1987 Safety Evaluation Supporting Amend 54 to License DPR-34 ML20215J8271987-05-0505 May 1987 Safety Evaluation Supporting Amend 53 to License DPR-34 ML20209D7561987-04-22022 April 1987 Safety Evaluation Supporting Util 870211 Submittal Re Performance Enhancement Program,Finding 4-10 ML20206J9331987-04-0606 April 1987 Safety Evaluation Supporting Amend 52 to License DPR-34 ML20205S1141987-03-31031 March 1987 Safety Evaluation Accepting Util 831104 Response to Generic Ltr 83-28,Item 4.5.2, Reactor Trip Sys Reliability On-Line Testing. Facility Designed to Permit on-line Functional Testing,Including Testing of Reactor Trip Contactors 1997-05-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20196G6731997-07-0101 July 1997 Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01
[Table view] |
Text
.
ENCLOSURE SAFETY EVALUATION REPORT SUPPLEMENT MASONRY WALL DESIGN, IE BULLETIN 80-11 FORT ST. VRAIN NUCLEAR PLANT DOCKET N0.: 50-267 ,
In the Safety Evaluation Report (SER), the staff concluded that except for seventeen walls qualified by the licensee via the use of the horizontal joint reinforcing as structural elements to resist the tensile stresses, items 2(b) l and 3 of IE Bulletin 80-11 have been fully implemented at the Ft. St. Vrain facility for the remaining walls. The SER also included a staff position on the use of the joint reinforcing and stated that the implementation of this position was required to render the above seventeen walls acceptable to the staff.
By a letter dated November 8,1983, the licensee indicated its intention to reevaluate the above walls by taking no structural credit for the joint rein-forcement. Th'e licen:ee stated that these walls will be modified, as required, by reinforcing them with the metal bar straps to withstand the loading resulting from the safe shut-down seismic event. By a letter dated July 6, 1984, the licensee has informed the staff that the required reinforcements for these walls are complete. Based on this information, the staff concludes that the issue regarding the use of the joint reinforcement to qualify the masonry walls is now satisfactorily resolved as the joint reinforcement is no longer relied upon to resist design basis loads.
Subsequent to the issuance of the staff SER, during an inspection conducted
, e 8601220407 86 PDR ADOCK O
{7 pg Q
\.
,P under the Resident Inspection Program (Inspection Report 50-267/84-22), it was discovered that several different types of modifications had been made to the
~
Ft. St. Vrain's masonry walls of which the staff had no knowledge. The staff findings reported in the SER were based on only one type of the modification scheme. The staff had reviewed this modification scheme and found it to be acceptable.
In order to evaluate the safety impact of the inspection finding, the staff conducted a site visit and meeting with the licensee on December 12-13, 1984.
As a result of this meeting and the subsequent conference call: on January 16, 1985, the licensee informed the staff of the following additional actions by a letter dated March 1, 1985.
- The licensee submitted a series of sketches indicating how the licensee reinforced each of the walls within the scope of IE Bulletin 80-11.
"The licensee committed to adding lateral restraints to the top,of turbine room walls #4, #6, #7, #8 and #9 to qualify the top boundaries as pinned joints (during the site visit the staff had questioned the appropriateness of the pinned end assumption).
- The licensee committed to remove one of the unmortared stacked block
, e f
~s .
,' wall (wall #97) and mortared remaining five safety related walls of the similar construction such that they can withstand the seismic forces.
'The licensee committed to extend all bar straps (external bar straps are used to reinforce the walls)past the masonry-concrete boundary and anchor the straps to the concrete or install clip angles. Originally, these straps in some cases did not extend beyond the wall boundary.
All strap extensions, clip angles and anchors will be designed to resist seismic loads. ,
'The licensee committed to install a missing strap on wall #12. This discrepancy was discovered during the staff site visit. The licensee also reviewed the other similar situations to confirm that this i
discrepancy was an isolated incidence. ;
i "The licensee analyzed the shear stress transferred from the masonry <
to the bolts and analyzed the compression stresses in the masonry resulting i from the bolt bearing. The results of these analyses demonstrated that actual masonry and steel stresses are within the allowables and the strap -
design is adequate as installed.
By a letter dated July 16, 1985, the licensee confirmed that all of the above r
6 i
=
i
\
. 4 described wall modifications are designed to meet the staff acceptance criteria (Appendix A of the Attachment 1 to the staff SER). The litensee also indicated that all wall modifications will be complete by December 31, 1985 (the licensee had committed to complete most of the wall modifications by August 2, 1985 in a March 1, 1985 letter),
t In a July 16, 1985 letter, the licensee stated that the safety related masonry walls located in the newly constructed facility, Building 10, have been conservatively analyzed as unreinforced masonry walls, although in reality the walls are constructed of reinforced masonry. Based on this conservative analyses, it is shown that these walls comply with the staff acceptance criteria.
Based on the above findings and the licensee's committments, the staff concludes that the following issues are resolved: (1) the use of the joint rein-forcement to qualify the masonry walls; (2) the use of modification schemes other than that addressed in the staff SER; and (3) the staff findings during the site visit. Therefore, there is a reasonable assurance that all safety related masonry walls at the Ft. St. Vrain facility (including Building 10 walls) will withstand the specified design load conditions without impairment of wall integrity or the performance of the required safety function. Items 2(b) and 3 of IE Bulletin 80-11 are considered fully implemented at the Ft. St. Vrain facility. ,