Forwards Press Release 84-58 Re NRC Proposed Fine Against Util for Alleged Violation of NRC Requirements During Preoperational TestingML20140H867 |
Person / Time |
---|
Site: |
Diablo Canyon, 05000000 |
---|
Issue date: |
05/17/1984 |
---|
From: |
Kammerer C NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
---|
To: |
Cranston, Lagomarsino, Markey, Ottinger R, Panetta, Simpson, Thomas, Udall, Wilson HOUSE OF REP., HOUSE OF REP., ENERGY & COMMERCE, SENATE |
---|
Shared Package |
---|
ML20140C961 |
List: ... further results |
---|
References |
---|
FOIA-85-478 NUDOCS 8510230173 |
Download: ML20140H867 (3) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C3541989-03-17017 March 1989 Forwards Detailed Info Re Status of Implementation of TMI Action Plan Items at Listed Plants.Small Number of Action Items Still Need Resolution ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20245D6531988-09-14014 September 1988 Responds to Re Requested Response to Concerns of H Nickerson Long Work Hrs for Personnel at Various Central Illinois Nuclear Generating Plants.Related Info Encl ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20151D3921988-04-0606 April 1988 Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20195J6611988-01-20020 January 1988 Responds to Concerns Raised in Re Stainless Steel Matl Designated as E-Brite 26-1.Actions Taken to Address Allegation That E-Brite 26-1 Unsuitable for Use in Nuclear Power Plants Listed ML20236K8761987-11-0303 November 1987 Responds to Sztaba Expressing Concerns Re Safe Operation of State of CT Nuclear Power Plants.Plants in State Not Rated Among Most Troublesome in Nation.Licensee Performance Monitored in Publicly Available SALP Repts ML20236G1831987-10-27027 October 1987 Responds to Re Proposed Rule 10CFR50 & Congressional Ltrs Received on Morning of 871022 Meeting. Commission Stands Behind Declaring Process for Proposed Rule Open ML20235J1171987-09-28028 September 1987 Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review ML20235J5351987-09-28028 September 1987 Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed ML20236L1811987-08-0404 August 1987 Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing ML20215K5981987-06-10010 June 1987 Responds to 870508 Request for Testimony at 870514 Hearing on External Influence on NRC Adjudicatory Procedures in Shoreham Proceeding.Index of Pertinent Documents Encl ML20215H9431987-06-0505 June 1987 Advises That Review of B&W Designed Nuclear Power Plants Will Not Satisfactorily Address Safety Issues Associated W/ B&W Design.Supports Efforts to Create Independent Safety Review Board ML20214J5261987-05-15015 May 1987 Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards ML20214P8401987-05-15015 May 1987 Responds to Rj Mrazek Re Util Request to Operate Facility at 25% Power.Commission Will Not Make Decision on Merits of Request Until All Parties Have Opportunity to Have Views Considered ML20207A2061987-04-17017 April 1987 Responds to Request for Rept Re Legal & Institutional Aspects Under NRC Jurisdiction on Possible Conversion of Unit 1 to Defense Matls Production Reactor.Cp Still in Effect.Util Plans to Mothball Reactor by June 1988 ML20210U9971986-10-0303 October 1986 Responds to 860826 Request for Review of Milwaukee Journal 860813 Article Submitted W/P Vollrath Ltr Expressing Concerns Re Safe Operation of Plant Following Seismic Event in State of Ca.All Plants Must Meet Seismic Requirements ML20210N2161986-09-25025 September 1986 Discusses Governor Celeste Opposing Full Power Operations of Plants.Order Bars Commission from Voting Until Further Order by Us Court of Appeals.Served on 860930 NUREG-0396, Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs1986-09-10010 September 1986 Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs NUREG-1068, Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls1986-08-26026 August 1986 Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls ML20209E6291986-08-26026 August 1986 Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities ML20206Q1321986-08-20020 August 1986 Submits Interim Response to Re Alleged Falsification of Welding Certificates for Welders at Plants Employed by Powerplant Specialists,Inc ML20204F9361986-07-30030 July 1986 Responds to from R Blank,Addressing Concerns Re Safety of Older Nuclear Plants,Per SO Conte 860701 Request ML20211P5021986-07-11011 July 1986 Responds to Seeking Justification for Commission 860611 Request That Distribution of Two Ofc of Inspector & Auditor Repts Be Restricted.Partially Deleted 851021 Rept Placed in Pdr.Rept Released in Entirety ML20215L2051986-06-16016 June 1986 Responds to to NRC Requesting That FEMA Conduct Public Meeting Re FEMA Assessment of 861213 Emergency Planning Exercise.Commission Addressed Similar Response in 860606 Memorandum & Order NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco1986-04-23023 April 1986 Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress1986-04-23023 April 1986 Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress ML20151R1271986-01-24024 January 1986 Forwards General Counsel 860121 Legal Memo Supporting Commission View,Per NRC Re Consideration of Earthquakes & Emergency Planning in Licensing Proceeding ML20137P5121986-01-24024 January 1986 Provides Info Concerning Financial Qualifications of Utils Re Safety of Plants.Nrc Regulation of Commercial Nuclear Power Based on Responsibility of Licensees for Safe Operation.Addl Views of Asselstine Encl ML20132G6251985-09-19019 September 1985 Forwards Responses to Gao Rept, NRC Should Rept on Progress in Implementing Lessons Learned from TMI Accident ML20137A6471985-08-16016 August 1985 Discusses Commission 850812 Response to E Markey Requests That NRC Reconsider Decision on Earthquakes & Emergency Planning.Decision Cannot Be Reconsidered Since Jurisdiction Passed to Us Court of Appeals ML20140H5551985-08-13013 August 1985 Forwards Press Release 85-108 Re Proposed Fine Concerning Util Alleged Violation of NRC Requirements Which Prohibit Discrimination Against Employee for Identifying Safety Concerns to Mgt ML20134F9751985-08-12012 August 1985 Forwards Rept Identifying Significant Inaccuracies in Subcommittee on Energy Conservation & Power 850709 Memo Re Emergency Planning Issue.Subcommittee Use of Internal NRC Documents Incomplete Picture of NRC Deliberations ML20134F9731985-08-12012 August 1985 Provides Commission Views Re Appropriateness of Addl Hearing on Facility Issues & Generic Question of Earthquake Emergency Planning,In Response to 850710 Request.Nrc Decision in Facility Case Correct & Proper ML20140H5741985-08-12012 August 1985 Forwards Press Release 85-106 Re Proposed Fine for Util Alleged Violation of NRC Requirements Concerning Employee Discrimination in Cleanup Program ML20140H5911985-07-23023 July 1985 Forwards Press Release 85-99 Re NRC Proposed Civil Penalty in Amount of $150,000 Against Util for Violation of Requirements Concerning Reactor Vessel Water Level Instruments ML20132B8341985-07-18018 July 1985 Forwards Quarterly Status Rept for Second Quarter CY85. Licensing Delay for Limerick 1 Projected to Be 5 Months. Delay Cannot Be Quantified for Shoreham Due to Litigation. Full Power OL Issued for Palo Verde 1 on 850601 IR 05000409/20050311985-07-16016 July 1985 Forwards Notice of Violation Issued to Util Based on 850409-0531 Insp ML20140H6231985-07-15015 July 1985 Forwards Press Release 85-95 Re NRC Proposed Fine Against Util for Alleged Violations of Safety Requirements During Apr 1985 1990-08-10
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247G2781989-09-13013 September 1989 Partial Response to FOIA Request for Records.Apps F & G Records Available in Pdr.App H Records Partially Withheld & App I Record Completely Withheld (Ref FOIA Exemption 5) ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny 1999-09-13
[Table view] |
Text
.
~~
~
'M. _',. .
3 T.
. . g,
. , y -,,
May 17, 1984 I
b op
\
The Honorable Richard L. Ottinger, Chaiman Subcomittee on Energy Conservation and Power Comittee on Energy and Comerce United States House of Representatives Washington, D.C. 20515
Dear *ir. Chaiman:
Enclosed for your infomation is an announcement that the Nuclear -
Regulatory Comission staff today infomed the Pacific Gas & ~
Electric Company of a proposed $50,000 fine against the company for an alleged violation of NRC requirements that occurred during preoperation11 testing at the Diablo Canyon Nuclear Plant.
It is planned to nail this infomation to the news nedia today, May 17, 1984.
Sincerely, Carlton Kammerer, Director Office of Congressional Aftairs
Enclosure:
As stated cc: Rep. Carlos Moorhead IDENTICAL LETTER SENT T0:
Sen. Simpson/cc: Sen. Hart Rep. Udall/cc: Rep. Lujan Rep. Markey/cc: Rep. Marlenee Sen. Wilson Sen. Cranston Rep. Lagomarsino Rep. Thomas Rep. Panetta 8510230173 851004 PDR FOIA j (((,I JACOBS85-478 PDR
- '> . . . . . 0,C. k, (,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,
===> . . .K EJ,1,,:,,,c,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,
enc > . 5. . . . . /.8. 4. . ......................
"%* ** * " ' s a c u 2* OFFICIAL RECORD COPY
Y $)'DC?
- A 'M D///
! j#~N '
D UNITED STATES f7r< i NUCLEAR REGULATORY COMMISSION
\ / ., Office of Public Affairs
- %.;'f.# Washington, D.C. 20656 l
No. 84-58 FOR IMMEDIATE RELEASE Tel. 301/492-7715 (Thursday,May 17,1984)
NRC STAFF PROPOSES $50,000 FINE AGAINST PACIFIC GAS
& ELECTRIC CO. FOR Alt.EGED VIOLATION AT DIABLO CAhf0N The Nuclear Regulatory Comission staff today informed the Pacific Gas & Electric Company of a proposed $50,000 fine against the company for an alleged violation of NRC requirements that occurred on April 6, 1984, during preoperational testing at the Diablo Canyon Nuclear Plant.
The alleged violation cited by the NRC staff occurred when plant operators disabled two redundant subsystems in the plant's emergency -
ore cooling system for a period of about 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> on April 6. Although the reactor had not yet begun operating at the time, it remained in a
- ot standby condition during the 15-hour period. Under the conditions
- ' the Diablo Canyon operating license, the plant must be brought to a
- iot shutdown- condition within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> when both of the ECCS subsystems are inoperable (Hot standby is when the reactor coolant system temperature is above 350 degrees F but the reactor is not operating; hot shutdown is when the reactor cdolant system temperature is between 200 and 350 degrees F.).
- In a May 17 letter to PG&E, NRC Regional Administrator John B.
Martin said that the incident occurred because plant operating personnel
" failed in this instance to exhibit an acceptable degree cf awareness of your facility's technical specification recuirements." Martin said that the purpose of the fine is to emphasize to the company the need for adequate precedures and to assure that operators are fully aware of regulatory requirements.
The NRC staff briefed the Commissioners on the details of the alleged violation prior to the Commission vote on April 13 to authorize low power testing at the plant. "NRC Region V is fully committed to l assuring the safe operation of the Diablo Canyon facility " Martin said.
"We will not tolerate poor performance in the operation of the plant and fully intend to take prompt and aggressive enforcement action whenever license conditions are not met. We believe that all license conditions must be fully complied with, regardless of whether the plant is actually operating at the time or not."
C/R Distribution: Chm, Cmrs, PE, GC, CA, ACRS, Historian, SECY, Records.
l m 200 300'ON O Al-W?u-Mi AI:%t PO %T. 30
DE 2
On April 6, during operatiens to increase the bcron concentration in the baron injection tank, plant personnel isolated the inlet and outlet valves to the tank, according to an approved proce.'ure, to prevent an accidental draining of the tank. However, the NRC inspection found that the company failed to fully evaluate the potential consequences of the new procedure, particularly that isolation of the boron injection tank while the plant was in he.t standby would constitute a violation of the plant's license conditions.
In the plant's emergency core cooling system, two charging pumps are designed to deliver highly borated water into the reactor coolant system to assure safe shutdown and cooldown of the reactor in the event of a small leak in the reactor coolant system. The pumps take water from a large storage tank and deliver it through the boron injection tank to the reactor coolant system. When the inlet and outlet valves to the BIT tank were closed, the flow path for both subsystems was effectively -
blocked.
Under NRC's enforcement policy, when the NRC staff proposes a civil penalty, the licensee is given 30 days to either pay the fine or submit a formal protest. If the utility denies the alleged violation .the NRC staff will consider that response before deciding whether to impose, mitigate or withdraw the proposed civil penalty.