ML20140F512

From kanterella
Jump to navigation Jump to search
Forwards Containment Sys Branch Input to Draft Sser 2 & Request for Addl Info.Areas of Concern from Review of Unsteady Drag on Submerged Structures Listed.Meetings W/ GE Planned to Discuss Impact Load Profiles
ML20140F512
Person / Time
Site: 05000000, 05000447
Issue date: 12/28/1976
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20140F372 List: ... further results
References
FOIA-85-665 NUDOCS 8604010067
Download: ML20140F512 (6)


Text

$

\\,

\\p' 9,(

A

[ma ano A

UNITED STATES

_,,s NUCLEAR REGULATORY COMMIS$10N y

WASHINGTON, D. C. 20085 5

- E

%*....}

DEC 2 8 1976 Docket No. STN 50-447 MEMORANDUM FOR:

D. B. Vassallo, Assistant Director for Light Water Reactors, DPM FROM:

R. L. Tedesco, Assistant Director for Plant Systems, DSS SUBJECT-DRAFT SUPPLEMENT 2 TO THE GESSAR SAFETY EVALUATION REPORT Plant Name: GESSAR-238 Nuclear Island Docket Number: STN 50-447 Licensing Stage: Preliminary Design Approval NSSS Supplier: General Electric Architect Engineer: N/A Containment Type: Mark III Responsible Branch and Project Manager:

LWR-1; J. Thomas Requested Completion Date: N/S Applicant's Response Date:

N/S Review Status:

Incomplete Enclosed is a draft of the CSB input to supplement 2 to the GESSAR Safety Evaluation Report and a request for additional infonnation.

The applicant has provided additional infonnation by Amendment Number 45 to the GESSAR-238 NI dated October,1976, in support of the sizing of the containmep+. vacuum breakers for a postulated containment depressurization i

based on the assumption of inadvertent containment spray operation.

Based on our review of the above infonnation and our confirmatory calculations, j

we find the containment external design pressure of 0.8 psid and the containment vacuum breaker design acceptable. We require, however, that the applicant connit to maintain the containment atmosphere conditions during normal plant operation within the' conditions specified in the i

Technical Specifications for the GESSAR-238 Nuclear Island. Our draft SER supplement for this item is enclosed.

Contact:

T. Su, CSB 492-7711 06b4010067860114 F$RES DN-665 PDR t-5 D

s j

l D. B. Vassallo DEC 2 8 1976 We reviewed the applicant's load criteria for submerged structures as l

described in the applicant's report " Unsteady Drag on Submerged Structures,"

l which is attached to the letter dated March 24, 1976 (G. L. Gyorey of GE to R. L. Tedesco of NRC).

During tha course of our review, the Containment Systems Branch has identified several areas of concern and has prepared i

the enclosed request for additional infonnation. The concerns include the following:

)

1.

The applicability of the method which assumes an idealized spherical gas bubble for air charging through the horizontal vent system following a LOCA.

2.

The applicability of the single spherical bubble for the SRV with quencher as discharge device.

We are also reviewing GE's proposed change to the impact load profile for structures located above the pool surface. We plan to meet with GE and 1

further discuss this aspect. We will address these matters in a future supplement to the SER.

%M 4.xv Robert L. Tedesco. Assistant Director for Plant Systems Division of Systems Safety i

)

Enclosure:

As Stated 1

)

cc:

S. Hanauer j

W. Mcdonald R. Heineman i

)

R. Boyd R. Tedesco J. Stolz G. Lainas

)

J. Kudrick l

J. Shapaker J. Glynn T. Kuang T. Su P. Baranowsky i

l l

i

,,..,,----_,,.--.----,--------,,-.--,-,,--------,--.,_--_w..

_n___,,,,,

..,,m,n-_n,--

nn,-..-,,_n--,

1%

Draft Supplement 2 to the Safety Evaluation Report GESSAR-238 NI Docket No. STN 50-447 6.2.1.5 External Pressure Design Delete paragraph 2, page 6-13 "The containment vessel

......a motor operated globe valve."

Insert in place of paragraph 2, page 6-13, the following:

The Containment vessel is designed for an external pressure of 0.8 psid.

A containment vacuum relief system consisting of two, 24-inch lines, is provided to maintain external pressures within design limits. Each vacuum relief line connects the containment to shield building annulus, and contains one check valve in series with an air operated butterfly valve.

Deleta paragraph 4, page 6-13 "We have reviewed the applicant's sizing analysis........ in a supplement to the Safety Evaluation."

Insert in place of paragraph 4, page 6-13 the following:

We have reviewed the applicant's sizing analysis for the codtainment vacuum breakers. The limiting containment operating condition of 90'F containment temperature with an associated relative humidity of 20 percent was selected by the applicant to establish the vacu:m breaker sizing. Based on these conditions, the applicant has calculated that an external pressure differential of 0.72 psid will not be exceeded. We have performed confirmatory calculations using the CONTEMPT LT 26 computer.

program which are in reasonable agreement with the applicant's result.

-.m-

j

't

\\

- d '.

' $ ].

4 The CONTEMPT calculation assumes instantaneous vaporization of the spray water until the containment reaches 100 percent relative humidity.

Based on our review and our confinnatory calculations, we find the external containment design pressure and the containment vacuum breaker j

sizing acceptable. However, we require that the applicant comit to maintain the containment atmosphere conditions during plant operation within conditions specified in the Technical Specifications. They are a i

minimum relative humidity of 20 percent at 90*F and 30 percent at 105*F.

Between these limits, the minimum humidity would vary linearly, i

i

)

{

~

f I

f 9

1 Request for Additional Information GESSAR-238 Nuclear Island Docket No. STN 50-447 041.1 The method presented in the GE report " Unsteady Drag on Submerged Structures," which is attached to the letter dated March 24, 1976 (G. L. Gyorey of GE to R. L. Tedesco of NRC), has been reviewed for the calculation of submerged structure loads. Since this model presents a departure from our current acceptance load criteria for submerged structures, the following additional information should be provided:

1.

Discuss and justify the applicability of this model, which assumes an idealized spherical gas bubble, for air charging through the horizontal vent system following a LOCA.

Information should include methods of determining initial bubble pressure, location, size and velocity.

Compare and justify these initial conditions hith the PSTF test data.

2.

Discuss and justify the applicability of this single spherical bubble for the SRV quencher design. 'Information should include methods of determining initial bubble pressure, location, size and velocity.

Method of calculating bubble pressure attenuation should be also provided.

041.2 With respect to the development of the drag coefficients for submerged structures, provide the following additional information:

b o

i r

i 1.

A detailed description of the analytical method used to calculate the drag coefficient for all complex structures (i.e., pipe i

supported by an I-beam).

2.

Applicable experimental data.

i i

l 1

i i

i i

I i

1 I

]

I i

)

i l

\\

l l

l I

i l

1 l

i j

1

_. _ _ _ _ _ _. - _ _ _ _. _ _.. _ _ _ _ _.,. _ _.,., _ _ _ _ - _ _, -, _, _.. _ _, _ _ _ _. _. _ _ _. _ _ - _ _,... _.. _ _ _... _ _ _. _. - _ _ _ _... _ _ _.. ~