I 25 PAGE np PSI PROGRAM PLAN:
CONTROL ROD DRIVE SYSTEM PERRY NUCLEAR POWER PLANT, UNIT 1 Prepared For CLEVELAND ELECTRIC ILLUMINATING COMPANY ProleCl ApplsCat Copy No Assigned To APPROVALS TITLE / DEPT. - SIGN ATURE - D ATE or REV NO PREPARED BY
~
~N
h M
b/
_f
_p
//j /fy w%4am g/r/rv susan Meyer
,f Vl & l,jb, 2
10/1/84 to-zy-s+
s 1
3 4
MMTD rilen onnu 5
Lb Uf3I I 6
4 Ill s t 's u
.m.' ".Mu 1d15 bijuijf jSRD 7
8 9
J AOhh0!00h4o
\\
PDR j
POEM # NES 204 9/$4
80A4430 ggg REVISION LOG 2
23 NUCLEAR ENERGY SERVICES. INC.
PAGE OF pfo -
"^Cf DESCRIPTION APPROVAL DATE yo
[k 8/4/82 See CRA 2691 Revised per customers comm
[, h e
code PY-CEl/NES-74 k
10/19/84 All Revised to incorporate customer comment, y
y
, s Welded attachments and Field Changes:
11-01 FC#1 and #2 11-02 FC#1 and #2 See CRA #4664 h
70RM e NES 2062 80
80A4430 4 mwrer%eene 3
25 11
,s G
OF NUCLEAR ENERGY SERVICES TABLE OF CONTENTS i
Page l
1.
INTRODUCTION 4
2.
SYSTEM DESCRIPTION 2.1 Exemptions 4
2.2 Exceptions 4
2.3 Classifications 4
2.4 Calibration Standards 7
2.5 Isometric Figures and Sketches 7
3.
PROGRAM PLAN AND SCHEDULE System Classification Figure 9
Weld Map Figures 10 Schedule Sheets 12 Tables 2.1 System Exemptions 5
2.2 System Exceptions (provided later) 2.3 System Classifications 6
2.4 System Referenced Calibration Standards 7
2.5 System Isometric Figures 7
l l
l CCAM s NES 205 2/80
80A4430 DOCUMENT NO.
a wwr er Q:- -::---
4 25 11 E
NUCt. EAR ENERGY SERVICES CONTROL ROD DRIVE SYSTEM
- 1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice Inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. All components in the Control Rod Drive (CRD) System required to be examined by ASME BPV Code,Section XI, are locluded.
The General Reference Text, NES Document 80A4420 presents the development and required procedural information for the PSI Program Plan generic to all systems examined.
As per NUREG-0803, Generic Safety evaluation report regarding the integrity of BWR scram discharge piping, additional class 2 examinations are scheduled for those portions of the scram discharge headers exceding 4" nominal pipe size.
- 2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS The portions of the CRD System that are exempted from examination as allowed by ASME BPV Code Section XI, and as described in the General Reference Text, are presented in Table 2.1.
2.2 EXCEPTIONS Exception may be taken to code requirements of examination where access is not possible due to design limitations. Provision for such exception is presented in the General Reference Text. Exceptions that are taken to required exams of the CRD System are itemized in Table 2.2 (Provided Later).
2.3 CLASSIFICATIONS This system's piping and instrumentation diagrams have been reviewed and Quality Group A, B, and C (ASME Code Class 1, 2, and 3) boundaries have been established as required by ASME Code Section XI, IWA-1400. The General Reference Text discusses the basis for these determinations.
Diagrams delineating these boundaries for the CRD System are presented in Figure B-11. CRD System classification and boundaries are presented in Table 2.3.
1 i
l i
I FORY = NES 205 2:80 l
s 80A4430 DOCUMENT NO.
a amor er Q_-- -- ---
5 25 11 NUCLEAR ENERGY SERVICES k
TABLE 2.1 SYSTEM EXEMPTIONS ASME Code Basis For Class Description Ref. P&ID Exemption 2
All vent, drain, D-302-All component connect-test, sample, fill 871 Rev C tions, piping & assoc-by-pass and instru-D-302-iated valves, and ment connections 4" 372 Rev E vessels (and their nominal size or supports) that are 4" smaller nominal pipe size &
smaller are exempted as per ASME Section XI, IWC-1220(d) S '75 Addenda s
(
l FOAM 8 NES 205 2/80
\\
S
,?
80A4430 DOCUMENT NO.
a s urer D -- :
6 25 PAGE OF W
NUCLEAR ENERGY SERVICES
[
TABLE 2.3 SYSTEM CLASSIFICATIONS ASME Code s
Class Description Ref. P&ID 2
From the control rod D-302-872 Rev. E drives thru the Hydraulic D-302-871 Rev. D Control Units to and s
iincluding the Scram Discharge Header t
l FORM s hES 205 2:80
80A4430 DOCUMENT NO.
a amor or Q:- -:: --
7 25 11 E
NUCLEAR ENERGY SERVICES 2.4 CALIBRATION STANDARDS Table 2.4 lists the Calibration Standards for ultrasonic examinations scheduled for the CRD System. All calibration standards are to be retained on site.
1 Design drawing documents are presented in Table 3.5 of the General Reference Text.
TABLE 2.4 System Referenced Calibration Standards Title Line Class Schedule Material PY-8-100-CS 8" El-2 SCH 100 SA 106 Grade B P Y-12-100-CS 12" El-2 SCH 100 SA 106 Grade B P Y-8-XXI-CS-F 8" El-2 SCH 100 SA 234 Grade WPB 2.5 ISOMETRIC FIGURES AND SKETCHES The piping isometric figures listed in Table 2.5 show the identification and location of areas for the CRD System requiring examination. Sketches may also be included that illustrate or locate areas of components requiring identification for examination.
TABLE 2.5 System Isometric Figures 11-01 Revision I 11-02 Revision 1 COW e NES 205 2:80
F 30A4430 DOCUMENT NO.
auwror Q _---:_^--
g 25 11 NUCLEAR ENERGY SERVICES
- 3. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.
Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, any calibration standard number referenced for ultrasonic examination, and the zone in which the examination area is located, as described in Section 3 of the General Reference Text.
Examination items are first divided according to the weld or hanger isometric figure that they appear on. Multiple examination requirements of the same component are listed separate in the schedule tables.
Component examinations and component bolting follow the piping weld examinations for each system. Hanger examinations appear as the next section, followed by the hydrovisual examination requirements.
CCAM s NES 205 2 80
9 4
1 I
O a
S 8
g
- w a.
Y E
Y, afE g
5 g-al '5 I jl p! iM i gy n'
=5 s
-,- o s is l
', a
~
I F
m,
)
I$
F sZ f
I wr
- G g
l'1 s
I e
eo p
I:
WT lIg r
1 h
J f
I i
s l
0-4
~
l l
s ff II l
d' s
l 8
R$
r i
9
-.., m som eace. 10 31
- D fg b-i*
,.s m
p m
DE I"C 5
- 9 isw w i
tTYPn KHO53 -m9
\\
e e
.\\
/;,- aao y.
(H675-WAJ g
e
'34' - g H660-WA) g EID W
EED-M ph' -E22m 0
n043-wg g
023 8
\\
NOTE-
.,4 g
6 ALL WELD NOS.
i
}[-'
HG61-WA) 6 AAE PRECEEDED BY,-Cil FOR COJPLETE IDENTlFICATION, 4EID
(
(HG74-WA )
,g N
aEr owes v,.; =
1125 -----
4 - C - il-17 svsrum mte I.$!!.'$
C LOOP A l-c-il-m A',
exg g{-1 6ILBERT ASSOC.
- l
- 11-01 4
RED G,
o-304-sn REv o
" XS ors twei 4-M 9'
= ><=.
um ry de, 2 "5532 PERRY UNITI 2*El-2 3
.or m seu
%8 PES 226-Mb0 4
9 4
W 1
3 a
I i
?
g, f,
e s
2.
E =
'A y
y itl I G
s-l%*?g!!!!!!!;il E
g 6
A i
s i
^
q)
Ng n g
N C
- r :-
g%
e O s
~
per 5 5h I
.c 5
,+,.
x o 0
y6
/g h
4 e,
f M
I 55 y
g S * **i'.
, t-
. e.
)
?
i U
9
.s 7
'bj Ye N
8 g
"g.
~
3
$$I 5
s-i h, k 5
5 R
s S
h 8i
~w a
r Q
00' S
k e
M 22 c-l to f_
i eg h
1 "B
.6 i-e i
/
e,'
l
%a I
x ill a
Og a
/
/
!k l
ra
,1 l
di g,(t
.;t 2
$n.
1 2
e f
s, ;y h
2
,4 e.
- C l
W
'v
PROGRAM PLAN AND SCHEDULE sy:
gh
/
g(qg System: Control Rod Drive APP:
h
/. 9/94 Document No. 80A4430 Preservice Inspection 5532 - PERRY Rev. 2 Page 12 of 25' I
OE TON DE MBE CA GmV ME REMMES PIPING WELDS - LOOP 'N Ref. Dwg. No.11-01 80A0186 PY UT l-Cll-0042 8" Cap to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 PY UT l-Cll-0043 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT 80A0186 PY UT l-Cll-0044 8" Elbow to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 PY UT IC-II-0045 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 83A0802 PY UT A
1-C11-0046 u" Tee to 8"x12" Reducing Elbow XXI-CS-F C-F II
/l_ \\
80A0183 N/A PT 80A0186 PY UT l-C11-0047 8"x12" Reducing Elbow to Pipe 100-CS C-F 11 80A0183 N/A PT 80A0186 PY UT l-Cll-0048 12" Pipe to Cap 100-CS C-F 11 80A0183 N/A PT 80A0186 PY UT I
l-Cll-0049 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT NEd 239 6/82
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE Cy:
4
/ %\\n Document No. 80A4430 App:
/ 1/F+
Preservice Inspection 5532 - PERRY Rev. 2 Page 13 of 25 m EE$
D EEE NUMBER 0
CA GORY E
No REW.RKS PIPING WELDS - LOOP 'A' Ref. Dwg. No.11-01 80A0186 P Y UT l-C11-0050 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-C11-0051 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cl1-0053 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-C11-0052 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0054 8" Pipe to Tee 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT 1-C11-0055 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0057 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-C11-0056 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT NES 239 632
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE CY:
th
/ On Document No. 80A4430 App:
Aamt.
/ 4/#
Preservice Inspection 3532 - PERRY Rev. 2 Page 14 of 21 CAu8RATON CODE OE TON DESCRI T NUMBE (tf at*n CA GORY THOD NO REMARKS PIPING WELDS - LOOP 'A' Ref. Dwg. No.11-01 80A0186 P Y UT l-C11-0058 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0059 8" Tee to Pipe 100-CS C-F II 30A0183 N/A PT 80A0186 P Y UT 1-Cll-0061 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 30A0186 P Y UT 1-Cll-0060 8" Tee to Pipe Bend 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT Customer 1-C11-0060A 8" Pipe to Pipe 100-CS N/A 11 requested exam 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0062 8" Pipe Bend to Tee 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cl1-0063 8" Tee to Pipe 100-CS C-F II 80A0183' N/A PT 80A0186 P Y UT l-Cll-0064 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT neb 239 682
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE d
/ N4 Document No. 80A4430 App:
e /
9/p+
Preservice Inspection 5532 - PERRY Rev. 2 Page 15 of 25 CAueRAToN COoE COMPONENT COMPOPENT PROCEDURE BLOCK CODE EKAM ZONE OENTIRCATION DESCR:PTION NUMBER (if apsmcable)
CATEGORY METHOO NO REMARK $
1 PIPING WELDS - LOOP 'A' Ret Dwg. No.11-01 80A0186 P Y UT l-Cll-0067 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0068 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0069 8" Elbow to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0070 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0065 8" Tee to Pipe 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-C11-0066 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0071 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0072 8" Pipe to Tee 100-CS-C-F 11 80A0183 N/A PT NES 239 6/82
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE GF d
/ OM Document No. 80A4430 App:
a m.
/ g/p#
Preservice Inspection 5532 - PERRY Rev. 2 Page 16 of 25' CAtlBRATION COOE COMPONENT CouPONENT PROCEDURE BLOCK COOE EXAM ZONE OENTIACATION DESCRIPTION NUMBER (if apphcaNel CATEGORY METHOO NO RE MARKS PIPING WELDS - LOOP 'A' Ref. Dwg. No.11-01 80A0186 P Y UT l-Cll-0073 8" Tee to Pipe 100-CS C-F
- il 80A0183 N/A PT 80A0186 P Y UT l-Cll-0075 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cil-0074 8" Tee to Pipe N/A PT 100-CS C-F II 80A0183 80A0186 P Y UT Customer 1-Cll-0076 A 8" Pipe to Pipe 100-CS N/A Il requested exam 80A0183 N/A PT 80A0186 P Y UT l-Cll-0076 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-Cl1-0077 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0079 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0078 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT NES 239 6/82
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE CF _$
/ $14 Document No. 80A4430 App:
m
/
O 1W f
Preservice Inspection 5532 - PERRY Rev. 2 Page 17 of 25 CAL 18 RAT 80N CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER pf apphcabte6 CATEGORY METHOO NO REMARKS PIPING WELDS - LOOP 'A' Ref. Dwg. No.11-01 30A0186 P Y UT l-Cll-0080 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT 80A0186 PY UT 1-Cll-0081 8" Elbow to Pipe 100-CS C-F II 80A0183 N/A PT.
30A0186 P Y UT l-Cll-0082 8" Pipe to Cap 100-CS C-F 11 80A0183 N/A PT i
neb 239 &B2
C*
System: Control Rod Drive Y
PROGRAM PLAN AND SCHEDULE Document No. 80A4430 App:
~h/
g/f+
Preservice Inspection 5532 - PERRY Rev. 2 Page 18 of 25' I
cAueRAToa com INNT TIoM DE NUMBER Of a N
CA GORY HOD NO REMARKS WELDED ATTACHMENTS Ret Dwg. No.11-01 h
1-Cll-H661-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-Cll-H048-WA Piping Welded Attachment 80A0183 N/A C-E PT II l-CII-H674-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-Cll-H660-WA Piping Welded Attachment 80A0183 N/A C-E PT II I-Cll-H053-WA Piping Welded Attachment 80A0183 N/A C-E PT II.
1-Cll-H057-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 l-Cll-H675-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 i
NES 239 6/82
B:
th
/ %\\Td System: Control Rod Drive PROGRAM PLAN AND SCHEDULE Y
t Document No. 80A4430 App:
J4k
/ cupe Preservice LWion 5532 - PERRY Rev. 2 Page 19 of 25' cAUBRGON CODE CE DE NUMBER pt anre =
CA GORY HOD NO RE m S PIPING WELD - LOOP 'B' Ref. Dwg. No. I1-02 80A0186 P Y UT l-Cll-0001 8" Cap to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0002 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT
/\\
1-Cll-0003 8" Elbow to Tee XXI-CS-F C-F
/2\\
80A0183 N/A PT 80A0186 PY UT l-C11-0004 8" Tee tc Elbow XXI-CS-F C-F II 80A0183 N/A PT 30A0186 P Y UT 1-Cll-0005 8" Elbow to 8"x12" Reducer XXI-CS-F C-F 11 80A0183 N/A PT 80A0186 P Y UT 1-C11-0006 8"x12" Reducer to Pipe 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cll-0007 12" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0008 8" Tee to Pipe 100-CS C-F 1
30A0183 N/A PT neb 239 6,32
System: Control Rod Drive Cy:
/ %\\d Document No. 80A4430 PROGRAM PLAN AND SCHEDULE APP:
h
/ T/h Preservice Inspection 5532 - PERRY Rev. 2 Page 20 of 25~
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM 2ONE
- DENTIFICATION DESCRIPTION NUMBER Of apc*cabiel CATEGORY METHOO NO REMMtKS PIPING wtLD - LOOP 'B' Ret Dwg. No.11-02 80A0186 P Y UT 1-Cll-0009 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0010 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 PY-8 UT Customer 1-Cll-0010A 8" Pipe to Pipe 100-CS N/A requested exam 80A0183 N/A PT 80A0186 P Y UT l-Cll-0012 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT 80A0186 PY UT l-Cll-00ll 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0013 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-C11-0014 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0016 8" Pipe to Cap 100-CS C-F II 80A0183 N/A PT NES 239 6/82
Systern: Control Rod Drive PROGRAM PLAN AND CCHEDULE CY:
tb
/ NT4_
Document No. 80A4430 App:
Ada
/ 9/94 Preservice Inspection 5532 - PERRY.
Rev. 2 Page 21 of 25 o NE oEscN$
Ten NUMBE CA Y
a HOO REMUES PIPING WELD - LOOP 'B' Ref. Dwg. No.11-02 80A0186 P Y UT l-Cll-0015 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 30A0186 P Y UT Customer 1-C11-0015A 8" Pipe to Pipe 100-CS N/A II requested exam 80A0183 N/A PT 80A0186 PY UT Customer 1-Cll-0017A 8" Pipe to Pipe Bend 100-CS N/A 11 requested exam 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0017 8" Pipe Bend to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0018 8" Tee to Pipe Bend 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cl1-0020 8" Pipe Bend to Tee 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cll-0023 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cil-0024 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT NES 239 6/82 9
/
System: Control Rod Drive PROGRAM PLAN AND SCHEEULE 4
/ M Dccument No. 80A4430 App:
Ah / q#4 Preservice Inspection 5532 - PERRY Rev. 2 Page 22 of 2'5 CALIBRATON CODE 10E DE i
NUMBE Of a abiel CA GORY T
No REMARKS PIPING WELD - LOOP ~B' Ref. Dwg. ' s 11-02 80A0186 P Y UT 1-Cll-0025 8" Elbow to Pipe 100-CS C-F 11 80A0186 N/A PT 80A0186 PY UT l-C11-0026 8" Pipe to Cap 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0021 8" Tee to Pipe 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cll-0022 8" Pipe to Cap 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT 1-Cll-0019 8" Tee to Pipe Bend 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-C11-0027 8" Pipe Bend to Tee 100-CS C-F 11 80A0183 N/A PT 80A0186 P Y UT l-Cll-0028 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-C11-0030 8" Pipe to Cap 100-CS C-F 11 80A0183 N/A PT neb 239 6B2
O
~
System: Control Rod Drive PROGRAM PLAN AND SCHEDULE By:
th
/ %\\i4 Document No. 80A4430 App:
A t yrt.
/ 4/f4 Preservice Inspection 5532 - PERRY Rev. 2 Page 23 of 25 CAUSRATON CODE OE DON DE MjeABE pf CA GORY No RE m S PIPING WELD - LOOP 'B' Ref. Dwg. No.11-02 30A0186 P Y UT l-Cll-0029 8" Tee to Pipe 100-CS C-F 11 30A0183 N/A PT SOA0186 P Y UT 1-C11-0031 8" Pipe to Tee 100-CS C-F 11 30A0183 N/A PT 30A0186 P Y UT l-Cll-0032 8" Tee to Pipe 100-CS C-F 30A0183 N/A PT 30A0186 P Y UT l-Cll-0034 8" Pipe to Cap 100-CS C-F 30A0183 N/A PT 80A0186 P Y UT l-Cl1-0033 8" Tee to Pipe 100-CS C-F 11 80A0183 N/A PT 30A0186 P Y UT I-Cll-0035 8" Pipe to Tee 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cl l-0036 8" Tee to Pipe 100-CS C-F 11 30A0183 N/A PT o
80A0136 P Y UT l-Cll-0038 8" Pipe to Cap 100-CS C-F 11 30A0183 N/A PT NES 239 632
7 B:
/ %\\M System: Control Rod Drive PROGRAM PLAN AND SCHEDULE Y
Document No. 80A4430 App:
Jan
/ 4/9+ ~
Preservice Inspection 5532 - PERRY Rev. 2 Page 24 of 25 '
CAUBRATO4 CODE o EcE c EcS wuueYc es Ew.e CA GORY &E HOO NO RE m $
PIPING WELD - LOOP 'B' Ref. Dwg. No.11-02 80A0186 P Y UT l-Cl1-0037 8" Tee to Pipe 100-CS C-F II 80A0183 N/A PT 80A0186 P Y UT l-Cll-0039 8" Pipe to Elbow 100-CS C-F II 80A0183 N/A PT 30A0186 P Y UT 1-Cll-0040 8" Elbow to Pipe 100-CS C-F II 30A0183 N/A PT 30A0186 PY UT 1-C11-0041 8 Pipe to Cap 100-CS C-F II 80A0183 N/A PT NE 239 682 L
HEE System: Control Rod Drive PROGRAM PLAN AND SCHEDULE CY:
/ NN Document No. 80A4430 App: lara
/ 4/94.'
Preservice Inspection 5532 - PERRY Rev. 2 Page 25 of 2f CAu8 RATION CODE COMPONENT COMPOPENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFICATION DESCRPTKN Nuk:SER Of apphcab.4 CATEGORY METHOO NO RE W S t,21.DED ATTACHMENTS Ref. Dwg. No. I1-02 1-C11-H668-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-Cll-H032-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-C11-H667-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-Cll-H039-WA Piping Welded Attachment 30A0183 N/A C-E PT 11 1-Cll-H666-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-C11-H042-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-C11-H662-WA Piping Welded Attachment 80A0183 N/A C-E PT 11 1-Cll-H665-WA Piping Welded Attachment 80A0183 N/A C-E PT II