,_

.c 0A M25 3

mr NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO.

REV.

PAGE nF PSI PROGRAM PLAN:

REACTOR CORE ISOLATION COOLING PERRY NUCLEAR POWER PLANT, UNIT I Prepared For CLEVELAND ELECTRIC ILLUMINATING COMPANY 6'rosec t Applic.slion Copyfio Amyngd lo 5532 APPROVALS TITLE / DEPT.

SIGtJ Af Unt D ATE HLVfAO PAEPAHED HV ISI Programs Project Eng. Manager Manager QA Manager o

'N

/

~

l

.i 3

Susan Meyer DW*/ RAW l&y}ll(Q' q/y., Mlad'*2 /" '"

~F V

lnitin

/*

/* *24

  • B4 i

5 YOff WTrn~nr n a o

vvaiac-.u.u b t r I

'ilij0 UEY if n is si!g ;3 r) a 0

Ok0$NO A

ii i

Pg POIM

  • NES 204 9/44

e-80A4425 ggg REVISION LOG NUCLEAR ENERGY SERVICES, INC.

PAGE.

OF "jg -

DATE

(^[

OESCRIPTION APPROVAL V

Change in Cal Block Title as noted

((.,

M 6/16/32 on page 7, 15, 25 & 26.

{

\\

CRA 2608 b

CRA # 3758 12/7/s3 u/v Addition of component examinations

[3

  • 10/24/84 Revised to incorporate cuotomer comments Ltdd PL cO66 6

and field channes (F.C. 's 06-01 #1 and #2 0',-02 #1 and #2 06-03 #1 thru #3 06-04 #1 thru #3 CRA #4677 Added Welded Attachments e

FORM # NES 206 2 80 L

DOCUMENT NO.

SOA4425 11 Aenever eenae O

NUCLEAR ENERGY SERVICES TABLE OF CONTENTS PAGE 1.

INTRODUCTION 4

2.

SYSTEM DESCRIPTION 4

2.1 Exemptions 4

2.2 Exceptions 4

2.3 Classifications 4

2.4 Calibration Standards 7

2.5 Isometric Figures and Sketches 7

3.

PROGRAM PLAN AND SCHEDULE 8

System Classification Figures 9

Weld Map Figures 10 Component Figures 14 Schedule Sheets Piping Welds 17 Schedule Sheets Component Examinaltons 39 Tables 2.1 System Exemptions 5

2.2 System Exceptions (provided later)-

2.3 System Classifications 6

2.4 System Referenced Calibration Standards 7

2.5 System Isometric Figures 7

F JAM 8 NES 205 2/80

DOCUMENT NO.

8 amwrer D r m 11 4

42 O'

NUCLEAR ENERGY SERVICES REACTOR CORE ISOLATION COOLING SYSTEM

1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. All components in the Reactor Core Isolation Cooling (RCIC) System required to be examined by ASME BPV Code,Section XI, are included.

The General Reference Text, NES Document 80A4420 presents the development and required procedural information for the PSI Program Plan generic to all systems examined.

2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS The portions of the RCIC System that are exempted from examination as allowed by ASME BPV Code Section XI, and as described in the General Reference Text, are presented in Table 2.1 2.2 EXCEPTIONS Exception may be taken to code requirements of examination where access is not possible due to design limitations. Provision for such exception is presented in the General Reference Text. Exceptions that are taken to required exams of the RCIC System are itemized in Table 2.2 (Later).

2.3 CLASSIFICATIONS This system's piping and instrumentation diagrams have been reviewed and Quality Group A, B, and C (ASME Code Class 1,2, and 3) boundaries have been estab!!shed as required by ASME Code Section XI, IWA-1400. The General Reference Text discusses the basis for these determinations.

Diagrams de!!neating these boundarles for the RCIC System are presented in Figure B-9. RCIC System classification and boundaries are presented in Table 2.3 FOAM s NES 205 2/80

30A4425 DOCUMENT NO, 11 4 aner er Sw 5

42 PAGE OF NUCLEAR ENERGY SERVICES TABLE 2.1 5YSTEM EXEMPTIONS ASME Code Basis For Class Description Ref. P&lD Exemption 1

All Component Con-D-302-Piping 1" nominal size nections, piping and 631/D and smaller exempted associated valves as per ASME Section of 1" nominal size XI Code IWB-1220(b) and smaller S '78 Addenda 2

All vent, drain, D-302 All component con-test, sample, fill, 631/D nections, piping and by-pass and instru-associated valves ment connections 4" (and their supports) nominal size or that are 4" nominal smaller pipe size and smaller are exempted as per ASME Section XI, IWC-1220(d) S '75 Addenda l

i l

l i JAM # NES 205 2/80

9 80A4425 DOCUMENT NO.

awwrer S "

1 6

42 NUCLEAR ENERGY SERVICES TABLE 2.3 SYSTEM CLASSIFICATIONS ASME Code Class Description Ref. P&ID 1

6" Dl-1 from the reactor D-302-631/D pressure vessel up to and including valve F013 1

10" Dl-1 from 26" main stream D-302-632/D toop 'A' including valve F064 and up to the restraint at 10" x 10" x 4" tee 2

6" DI-2 from valve F013 D-302-631/D through RCIC pump C001 and up to suppression pool 2

12" L1-2 from turbine pump D-302-631/D C002 up to the suppression and pool, including 8" L1-2 D-302-632/D annulus vent up to flange D001 i

I JAM s NES 205 2/80

80A4425

,, _g, 7

11 my NUCLEAR ENERGY SERVICES 2.4 CALIBRATION STANDARDS Table 2.4 lists the Calibration Standards for ultrasonic examinations scheduled for the RCIC System. All calibration standards are to be retained on site.

Design drawing documents are presented in Table 3.5 of the General Reference Text.

TABLE 2.4 System Referenced Calibration Standards Title Line Class Schedule Material PY-10-80-CS 10" Dl-1 Sch-80 SA106 Grade B PY-6-80-CS 6" Dl-1 Sch-80 SA106 Grade B PY-6-120-CS 6" Dl-2 Sch-120 SA106 Grade B PY-12-100-CS 12" Dl-2 Sch-100 SA106 Grade B PY-4-XXI-CS-F 4" Dl-1 Sch-80 SA234 Grade WPB PY-6-X XI-CS-F 6" DI-2 SCH-120 SA234 Grade WPB h PY-Valve-XXI-CS 2.212" SA105 1.531" SA105 PY-Val te-XX2-CS 2.5 ISOMETRIC FIGURES AND SKETCHES The piping isometric and component figures listed in Table 2.5 show the identification and location of areas for the RCIC System requiring examination.

Sketches may also be included that illustrate or locate areas of components requiring identification for examination.

TABLE 2.5 System Isometric / Component Figures 06-01 Revision 1 06-02 Revision 1 06-03 Revision 1 06 04 Revidon 1

[

06-05 Revision 0

~

06-06 Revision 0 06-07 Revision 0 l

FCAM s NES 205 2/80 l

30A4425 DMMT %.

a an w r er Q : w - -

PAGE OF NUCLEAR ENERGY SERVICES

3. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.

Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, any calibration standard number referenced for ultrasonic examination, and the zone in which the examination area is located, as described in Section 3 of the General Reference Text.

Examination items are first divided according to the weld or hanger isometric figure that they appear on. Multiple examination requirements of the same component are listed separate in the schedule tables.

Component examinations and component botting follow the piping weld examinations for each system. Hanger examinations appear as the next section, followed by the hydrovisual examination requirements.

FORM

  • NES 20s 2180

DocuneosY ano E0A75C-O 9

42 etc,e o,

/E 5 5 5a E's ACIC

(, ;:

(F065, Q3

-r m2 w-2 FucP i F068 C tt L

L,

't j

II

~

l ' '

6*

}

m E58

/

/ F018 3

r

  • R Y

,c y s LUBE 0it_

Rm AS si 4 > t ro e-c) t38 E51 g

g d6 F G.

( j, COQ.ER

@3 95M 1 F501

>B002 fjs s'.

d{,.

B6 V

CGiT46NsEraT 45 J

Xl s CRAIN POT G'

x 2-5 asia

-~

s T

pf",'7

{,

G' IS d

5:

.9 E

>M b

g

'ESI ras I.

N N

uxu sito

-i F 514 (FIG-E a s.

E5:

4 LOOP A' 7509 u

FG62 A

tSI s

E FC25 m

iw py7 E4R Ttr<BINE

^

(FG 84,)

COO 2 E'

h'O k

2~

I' 6

OT N

'E5a Of<Y nEtt.

lDOCR

  1. #^W-7o33)

- - ES 23 D-302-f21/D F 3 po4

),

3 r2" D-302-E22/D A-.

N @)

, 7

'A

!' g igp n g g _ _ _

[h.;.]

6 6"

1 3,

SYSTD.I Q.ASSIFICATICN M

p FOO4 5

ESI RCIC d

st'

=== n

    • o B-9 o3t!

= v r>

r,Joju

-c a ct.p a

\\'

V d-lg a.re,He

- GR LP 6 (Starssacu FEFM-5532 UtilT 2

.or = m

,Omae eEs 2 e-suo a

e

N 4

%A4 8

=

4 S-tm l

9 5

~e 3 ids E

5 4? ! ]

gg g vt I

e a w e

m o

o t I b

I Ir

=

a 1

a n

d n

O t3}--

-4 P

3, 2 N ii4 5-I s

as

/

p I=

5, tt i uw i

L, p

5.i D

rg q

,* i@

4%

09,s

'SS f

n 2

ks

/ ' *.

m

,g' 5'{

g vp f a/

s

..a e

n aC N' i s

w8 2

W

\\

/

s EU

$k

's.a v,1,

/

e

,\\

  • > =

rp y

3, s/. ~C

.f/

'\\

2 s

7, '

m

'I, s e* I' \\'

s 4

s

""T" 2-'

\\

/

~~~~~~~

/

\\

'.y y

'C/

t

( 3 ')

K

,7

,4-

.. _, /

i c

c a

. v'8

/

i Q

9y

,, _ (

T49.ji

/.

eg

'Ms c-4 a3 y

c1 e.n.a 0

'5i 8

M

+

t..._

s s

_icSt 'l%fud g

\\(

wa.nug

.L mcm.m 4 sm A

M

/

N 0!

\\

7 C

0!

\\

'g 6

f

$5 3Q N'

fj

( Jj i W.

"de%

I6l jga 4

g o,

l I

h.Ap

?

4 g;

n

.~

a 4

5 TM" 1

l c.g l

1 5 K talO,Cl

_l 8W2

%1 F;g, du O'

g

' f) "6 S

7 3

9 h

5l9 s

~8 < -

9 by l

L__

=M"-

1 4

S r.n 6

ses L

4

=

? :

s e-en ; i c

s G r,,

i 1 98 9 i 93 2' TT F4 y'

g o

ee p

~

u

'e U

I g

=

N 3

sh u o

e*

m 2

sf

@ lg m

]. it i

\\

s,A G

e,?

~

N 9s y

g ej ^ r$

,8 s

4.\\

h\\

, 3'V

,L 3

,L" f

3 9

5 w 0

t, h

b, e7 0

0

~l y

})

h 8

a 2

/

6 1

T4

'd 5

5 g 'e s

s o,\\

p

,e

^'

c3 3

.y OV's h,

i

'V

\\,

.k-s=;

s\\7 2

i 3

3, s

e e

s

\\

.se b

~~

s e

4

0. s

~

cg+b g y),g fi

-Lh

{g[* *

- -f43d 4Y1 p a

~ d.~4bd,P Jd g

~~

~

~ ic~ i ~N3d Ty _3}

'4)s g

'M a

=

a 4i

.o a

y T

N D-we 1"

s 3

s h

. o,N 2

g-g

  1. S t

g g

~

j+

l o

DOCLMAENT esO. %M 44 7 6 12, 42 uce REF.

PutLMAN - KELLCGG IOO50 199951 l-E51-2 REv 4-F066 s.E51-9 REV I

_s 5"

p 100061 100021 59 l00071 FCE5

'qoco31 Cast 0 -wa) l 1.99n 2:

IOccel-l iR i

-10o241 me

,i

'g7 19 9811 1 OOIM-R

, e i

0 22]

s gocigg s

I

/

g,b 1 0 0471)

IOO23h a/

g

[/

4%e 10015 l-

[ [QQ2!}

100181- <

P l

3 10026 d'-

100201 IS211]

09 1o0271-s 10 0' 91~

FOl3 L o291 l

0029Al CONT'D ON PA 6 C u n Fth.

os-o4 -

00301 o3 3 9

n p_q._.._ _

ALL PIPING ( VALVE nuM6L RS E SI RCIC WELD MAP ARE PRECEDED BY l-ESI FOR-COMPLETE SYSTEM TOENT.

aav 2 m = 06-o3 es. et o.se yb;/g anAam o.rs 4 ;/rf

" 5532 - PERRY UHIT 1 ear so scaa NM 226-SrM s

e h

DOCuteENTHO.*014426 13 42 race 5

h FOt t Foto N 2Al Ia z,

00741

>O'73I p

76 Al

,hE 6

,6 6 si 70

/j pg

.g g _g 4 F50s gg

  1. W99,"

M r'

FGl3 CONT'D JN

[P07=>]

[hWel 6

,g 06-03 O *f

-4 g 003:}

' L.

p/

ro30 IDTE6

ED 'th a /

\\

Q

,.

  • f l

l

~

g FO3l MM ic5331;

,1

._g

{

4 v.w 100551 100461 g

0032l

{7 g ag _

s-l@.1LI

' re'ew

(" 0 4 2 '"#)

-W 7

g g

/

F502 a

ao >

c 04 g

005:I

\\

/

' loo 7ol

['

(60E51 '.

~

-Ico371 g-

[563 RJMP (HO4 l-WA) l l k C001 -100361 D025 1 6 -i too351

  • /0 A

?',%'s' $O. f G / 1 REE

== ~~~~ PULLMAN-KELLOGG 1-E316 REV. 8 s,srsm mts N' L I-E51-5 REV. o 6 NOTg: t.E5l-3 REV 7 E5l RCit WEl.D MAP 1 t-E51-2 RE W 14 ALL P PING ( VALVE NUMBERS =2

    • = 06-04 j

ARE PRECEDED BY l-ESt FOR sv 4 4' mes 7hf/g Cc2PLETE SYSTEM IDENTJFICATION whw art % //f i "**C' 5532 - PERRY UNIT l notmscas Kna)NES 226-Vs0 4

DOCUMENT NO. 80A4425 PAGE OF NUCt. EAR ENERGY SERVICES. INC. NOTE : WELD IDENTIFICATION NUMBER / FOR IDENTICAL VALVE F064 IS: i / 1-E51-F064-SEAM ~'$1--' 4pl ; 7 1 \\ / I s' s 4 e 7 l I' /

lah, 1-E51-F063-IS

/ N 1-E 51-F0 6 3-S E A M /k -l

  1. 71 l Awn

'g we s"- n r z q _.......... _.. u SYSTEM IIILE RCIC 10"F063 & F064 REF. DWGS. E51 GATE VALVES BORG WARNER DWG. NO. 10-1 nev: O no,no 06-05 l gal DWG. NO. 4549-40-422-1-5 " /d DATE:g[24/33 4549-40-426-1-6 ^m k4 o^te le/s/83 " ' PERRY UNIT 1 NOT TO SCAtt FORM # NES 205 2/80 l

my DOCUMENT NO, 80A4425 PAGE 15 OF 42 NUCLEAR ENERGY SERVICES, INC. f %I' 41 / / 3 l,I NOTE: WELD IDENTFICATION NUMBER FON 6" VALVE F502 1 / / FOR SURFACE ( PT ) EXAM IS: b 1-E51-F502-SEAM ,^

e g 7

/ / s l t / / Yj$ WA \\\\\\s l y 1-E51-F013-IS N I e 1-E51-F013-SEAM cf/sa //ran e J. """#/G/ 7/////A' n r z q _.. _... _. u TITLE sygEu RCIC 6" GATE REF. DWGS. E51 VALVES F5.02 & F013 SEAM LOCATION BORG WARNER DWG. NO. 83490 aEv: O rio. NO. 06-06 i' 81020 8[24[$3 SY: 78 OATE: gal DWG. NO. 4549-40-563-1-6 gg o,,,, fofocfgg MMS 1&2 si a 4549-40-351-1-6 " " *

  • PERRY UNIT 1 NOT TO SCALE FORM 4NES 205 2/80

DOCUMENT NO. 80A4425 PAG-16 .s p 42 NUCLEAR ENERGY SERVICES, INC. i I pS BY 1-E51-COO 1-SE AM I L DISCHARGE DISCHARGE A. a,, ; u.3 r-m @T e" SUCTION I l l NOZZLE ,+ -g-L _Jl lL ! I'. J! g i [ s !. _.j gSUCTION SUCTION --~ ~~~~~~C --:1 f -- - ,-l ........... n 6 B O W 45' ELEVATION VIEW 1-E51-COO 2-SE AM 11 SIDE VIEW REF.DWG. BINGHAM PUMP CO.

  • D-11743X seuctaan awenov senwicas SYSTEM TITLE NO.

RCIC. PUMP COO 1 NOTE: NOZZLE TO ELBOW E51 WELD LOCATION AND ELBOW TO FLANGE REV: O FIO. NO. QS-Q7 WELDS ON SUCTION SIDE ev: rs o41E:fo////g3 OF PUMP ARE SHOWN ON ^" M ^dO/'1/o3 NES WELD M AP +06-01 "" 5532 PERRY UNIT 1 NOT TO SCALE FORM

  • NES 205 2/80

B: / On Syst:m: RCIC PRO 2 RAM PLAN AND SCHEDULE Y Document No. 80A4425 APP: Jnx / 4/Tf-Preservice Inspection 5532 - PERRY Rev.3 Page 17_of 42 ioeEfrfc45[m ocEe"r5 ""NueE' c4 E v "o S' ue REMARKS PIPING WELDS Ref. Dwg. No. 06-01 1-E51-0129 26" x 10" Contour Nozzle 80A0186 PY B-3 UT 111 to Pipe 80-CS 80A0183 N/A PT l-E51-0128A 10" Pipe to Pipe 80A0186 PY B-3 UT ll! 80-CS 80A0183 N/A PT l-E51-0128 10" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0127 10" Elbow to Pipe 80A0186 PY B-3 UT !? 80-CS 80A0183 N/A PT l-E51-0126 10" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0125 10" Elbow to Pipe 80A0lR6 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0124 10" Pipe to Valve F063 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT 1-E51-0123 10" Valve F063 to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT NEd 239 6/82

B: / M Systsm: RCIC PROGRAM PLAN AND SCHEDULE Y Document No. 80A4423 App: Je / g/k Preservice Inspection 5532 - PERRY Rev.3 Page 18 of'42 COMPONENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION WSCRIPTION NUMBER (If apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No. 06-01 1-E51-0122 10" Pipe to penetration P422 80A0186 PY B-3 UT III Process Pipe 80-CS 80A0183 N/A PT l-E51-0121 10" Penetration P422 Process 80A0186 PY B-3 UT III Pipe to Pipe 80-CS 80A0183 N/A PT l-E51-0120 10" Pipe to Valve F064 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0119 10" Valve F064 to Pipe 30A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-Oll8 10" Pipe to Tee 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT ^ l-E51-0117 10" x 4" Tee to Elbow 80A0186 PY B-3 PT III XX1-CS-F 80A0183 N/A UT l-E51-0130 12" Cap to Pipe 80A0186 PY C-F UT III 100-CS 80A0183 N/A PT l-E51-031 12" Pipe to Cap 80A0186 PY C-F UT III 100-CS 80A0183 N/A PT NEd 239 6/82 i

Syst:rn: RCIC PROGRAM PLAN AND SCHEDULE By: 4 / %\\t4 Document No. 80A4425 App: dh / 9/y+ ' Preservice Inspection 5532 - PERRY Rev.3' Page 19'of 42 l CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Uf applicable) CATEGORY METHOD NO. REMARKS PIPING WELDS Ref. Dwg. No. 06-01 1-E51-0103 8" Flange to 8" x !2" Reducing Elbow 80A0183 N/A C-F PT III 1-E51-0102 8" x 12" Reducing Elbow to 12" Pipe 80A0183 N/A C-F PT III l-E51-0101 12" Pipe to Tee 80A0183 N/A C-F PT III NES 239 6/82

B' I N Systenu RCIc PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 App: art m '/ yn, Preservice Inspection 5532 - PERRY Rev.3 Page 20 of 42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicablel C#TCGORY METHOD NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 06-01 h l-E51-H102-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l NES 239 6/82 i

Syst'.m: RCIC PRO 2 RAM PLAN AND SCHEDULE By: tA / %\\M Document No. 80A4425 APP: h / 9/ff Preservice Inspection 5532 - PERRY Rev.3 Page 21 of 42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable) CATEGORY METHOO NO REMARKS PIPING WELDS Ref. Dwg. No. 06-02 1-E51-0100 12" Cap to Pipe 80A0183 N/A C-F PT IX l-E51-0099 12" Pipe to Tee 80A0183 N/A C-F PT IX l-E51-0098 12" x 12" x 12" Tee to 12" Pipe 80A0183 N/A C-F PT IX l-E51-0097A 8" x 12" x 12" Tee to 12" Pipe 80A0183 N/A C-F PT IX 1-E51-0104 12" x 8" Tee to Pipe 80A0183 N/A C-F PT IX 1-E51-0105 8" Pipe to Rupture Disc D001 80A0183 N/A C-F PT IX l-E51-0106 Rupture Disc D001 to 8" Pipe 80A0183 N/A C-F PT IX l-E51-0107 8" Pipe to Rupture Disc D002 80A0183 N/A C-F PT IX NES 239 6/82

~ B: N / %\\4b System: RCIC PRO" DRAM PLAN AND SCHEDULE Y Document No. 80A4425 APP: AAmt- / 4/P4 ' Preservice Inspection $!32 - PERRY Rev.3' Page 22'of 42 COMPONENT COMPONENT PROCEDURE B CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable) CATEGORY METHOD NO. REMARKS PIPING WELDS Ref. Dwg. No. 06-02 1-E51-0097 8" x 12" x 12" Tee to Pipe Bend 80A0183 N/A C-F PT IX l-E51-0096 12" Pipe Bend to Pipe 80A0183 N/A C-F PT IX l-E51-0095 12" Pipe to Elbow 80A0183 N/A C-F PT IX l-E51-0094 12" Elbow to Pipe 80A0183 N/A C-F PT IX l-E51-0093A 12" Pipe to Pipe 80A0183 N/A N/A PT IX Customer requested exam 1-E51-0093 12" Pipe to Elbow 80A0183 N/A C-F PT IX l-E51-0092 12" Elbow to Pipe 80A0183 N/A C-F PT IX 1-E51-0091 12" Pipe to Elbow 80A0183 N/A C-F PT IX NES 239 6/82

B \\h / kSk System: RCIC PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 App: _h / cr/ff ' ~ Preservice Inspection 5532 - PERRY Rev.3 Page 23 of 42 COMPONENT COMPONENT PROCEDURE OCK CODE ZONE IDENTIFICATION DESCRIPTION NUMBER til apphCablel CATEGORY METHOD No REMARKS PIPING WELDS Ref. Dwg. No. 06-02 1-E51-0090 12" Elbow to Flanged Valve F040 80A0183 N/A C-F PT IX l-E51-0089 12" Flanged Valve F040 to Pipe 80A0183 N/A C-F PT IX 1-E51-0088 12" Pipe to Valve F068 80A0183 N/A C-F PT IX l-E51-0087 12" Valve F068 to Pipe 80A0183 N/A C-F PT IX l-E51-0086 12" Pipe to Penetration P106 80A0183 N/A C-F PT IX Process Pipe 1-E51-0085 12" Penetration P106 Process 80A0183 N/A C-F PT IX Pipe to Pipe 1-E51-0084 12" Pipe to Elbow 80A0183 N/A C-F PT IX l-E51-0083 12" Elbow to Pipe 80A0183 N/A C-F PT IX NES 239 6/82

^ PROGRAM PLAN AND SCHEDULE Bya th / %\\qi System: RCIC Document No. 80A4425 APP: A h _ / E f'4 ' Preservice Inspection 5532 - PERRY Rev.3 Page 24 of 42 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 80ENTIFICATION DESCRIPTION NUMBER tif apphcable) CATEGORY METHOO NO REMARKS PIPING WELDS Ref. Dwg. No. 06-02 1-E51-0082 12" Pipe to Flange D023 80A0183 N/A C-F PT IX l-E51-0081 12" Flange D023 to Pipe 80A0183. N/A C-F PT IX l-E51-0080 12" Pipe to Sparger 80A0183 N/A C-F PT IX NES 239 6/82

^ Systam2 RCIc PROGRAM PLAN AND SCHEDULE By: th / 0 44-Document No. 80A4425 App: c!a > A../ <1n4 Preservice Inspection 5532 - PERRY Rev.3 Page 25' of 42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOO NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 06-02 1-E51-H055-WA Pipe Welded Attachment 80A0183 N/A C-E PT IX l-E51-H026-WA Pipe Welded Attachment 80A0183 N/A C-E PT IX NES 239 6/82

System: RCIC PROGRAM PLAN AND SCHEDULE By: t% / %\\4h Document No. 80A4425 APP: AM / 9/W ' Preservice Inspection 5532 - PERRY Rev.3' Page 26 of 42 COMPONENT COMPONENT PROCEDURE OCK CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No. 06-03 1-E51-0001 6" Flange to Pipe 80A0186 PY B-3 UT V 80-CS 80A0183 N/A PT l-E51-0002 6" Pipe to Valve F066 80A0186 PY B-3 UT V 80-CS 80A0183 N/A PT l-E51-0003 6" Valve F066 To Pipe 80A0186 P Y B-3 UT V 80-CS 30A0183 N/A PT l-E51-0004 6" Pipe To Elbow 80A0186 PY B-3 UT V 80-CS 80A0183 N/A PT l-E51-0005 6" Elbow To Pipe 80A0186 P Y B-3 UT V 80-CS 80A0183 N/A PT l-E51-0006 6" Pipe To Elbow 30A0186 PY B-3 UT V 80-CS 80A0183 N/A PT l-E51-0007 6" Elbow to Pipe 80A0186 PY B-3 UT V 80-CS 80A0183 N/A PT l-E51-0008 6" Pipe to Flange 80A0186 PY B-3 UT V 80-CS 80A0183 N/A PT NEd 239 6/82

~ PROGRAM PLAN AND SCHEDULE By: th / N\\(4 System: RCIC Document No. 80A4425 APP: Am / 919F ~ Preservice Inspection 5532 - PERRY Rev.3 Page 27 of 42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (ll apphcable) CATEGORY METHOD NO RE MARKS PIPING WELDS Ref. Dwg. No. 06-03 1-E51-0009 6" Flange to Pipe 80A0186 PY B-3 UT III 80-CS 80AC183 N/A PT l-E51-0010 6" Pipe to Elbow 80A0186 PY B-3 UT 111 80-CS 80A0183 N/A PT l-E51-0011 6" Elbow to Pipe 80A0136 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0012 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0013 6" Elbow to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0014 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0015 6 Elbow to Pipe 80A0186 PY B-3 UT 111 80-CS 80A0183 N/A PT l-E51-0016 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT NES 239 6/82

B: th / b4 System: RCIc PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 App: ,Jer nu / c/ /54 Preservice Inspection 5532 - PERRY Rev.3 Page 28 of 42 o CAttBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENT6FICATION DESCRIPTION NUMBER (if applicablet CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No. 06-03 1-E51-0017 6" Elbow to Pipe 80 A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0018 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0019 6" Elbow to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT 1-E51-0019A 6" Pipe to Pipe 80A0186 P Y B-3 UT III 80-CS 80A0183 N/A PT l-E51-0020 6" Pipe to Penetration P123 80A0186 P Y B-3 UT III Process Pipe 80-CS 80A0183 N/A PT 1-E51-0021 6" Penetration P123 Process 80A0186 P Y B-3 UT III Pipe to Pipe 80-CS 80A0183 N/A PT 1-E51-0022 6" Pipe Valve F065 80A0186 P Y B-3 UT III 80-CS 80A0183 N/A PT l-E51-0023 6" Valve F065 to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT NES 239 632

PROGRAM PLAN AND SCHEDULE By: gh / s\\tk System: RCic Document No. 80A4425 APF: h / 'U24 Preservice InspectiCr. 5532 - PERRY Rev.3 Page 29 of' 42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMB 6R (if applicable) CATEGORY METIOD HO REMARKS l PIPING WELDS Ref. Dwg. No. 06-03 1-E51-0024 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0025 6" Elbow to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0026 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0027 6" Elbow to Pipe 80A0186 P Y B-3 UT III 80-CS 80A0183 N/A PT l-E51-0028 6" Pipe to Elbow 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0029 6" Elbow to Pipe 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0029A 6" Pipe to Tee 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT l-E51-0029B 6" Pipe to Tee 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT NES 239 6/82

B: N / bO system: Rcic PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 APP: h / 9/M Preservice Inspection 5532 - PERRY Rev.3 Page 30 of 42 CAtlBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAV ZONE IDENTIFICATIOh DESCRPTION NUMBER of applecable) CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No. 06-03 1-E51-0030 6" Pipe to Valve F013 80A0186 PY B-3 UT III 80-CS 80A0183 N/A PT neb 239 6/82

l System: RCIc PROGRAM PLAN AND SCHEDULE BF th / %\\n Document No. 80A4425 APP: A ~< " L /

  1. f# 4'

~ Preservice Inspection 3532 - PERRY Rev.3 Page '31 'of ~42 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTFICATION DESCFUPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 06-03 /\\ 1-E51-H150-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT V NES 239 6/82

i PROGRAM PLAN AND SCHEDULE a: / g\\M S RCIC btem: ment No. 80A4425 APP: Ah / 9/9+ ~ Preservice Inspection 5532 - PERRY Rev.3 Page 32'of 42 o Ec ocsES EeY cA E Y ro4 w ME HOD REMARKS I - PIPING WELDS Ref. Dwg. No. 06-04 6" v ive F0,82 to Pipe 80A0186 P Y C-F UT II 1-E51-0031 a 120-CS 80A0183 N/A PT l-E51-0032 6" Pipe to Elbow 80A0186 PY C-F UT 11 120-CS 80A0183 N/A PT l-E51-0033 6" Elbow to Pipe 80A0186 PY C-F UT II 120-CS 80A0183 N/A PT l-E51-0034 6" Pipe to Elbow 30A0186 PY C-F UT II 120-CS 80A0183 N/A PT l-E51-0035 6" Elbow to Pipe 80A0186 PY C-F UT 11 120-CS ~ 80A0183 N/A PT l-E51-0036 6" Pipe to Elbow 80A0186 PY C-F UT II 120-CS 80A0183 N/A PT 1-E51-0037 6" Elbow to Pipe 80A0186 PY C-F UT 11 120-CS 80A0183 N/A PT 1-E51-0038 6" Pipe to Tee 80A0186 PY C-F UT II 120-CS 80A0183 N/A PT NEd 239 6/82

System: RCIC PROGRAM PLAN AND CCHEDULE By: W / %\\tb Document No. 80A4425 App: /ain / W54.' Preservice Inspection 5532 - PERRY Rev.3 Page 33' of 42 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOO NO REMSRKS PIPINC. WELDS Ref. Dwg. No. 06-04 1-E51-0040 6" Tee to 6" x 4" Reducer 83A080? P Y C-F UT I XXI-CS-F 80A0183 N/A PT l-E51-0031 6" Tee to Pipe 80A0186 PY C-F UT I 120-CS 80A0183 N/A PT l-E51-0042 6" Pipe to Flange FE-N001 80A0186 PY C-F UT I 120-CS 80A0183 N/A PT 1-E51-0043 6" Flange FE N001 to Pipe 80A0186 PY C-F UT I 120-CS 80A0183 N/A PT 6" Pipe to Elbow 80A0186 P Y C-F UT I 1-E51-0044 120-CS 80A0183 N/A PT l-E51-0045 6" Elbow to Pipe 80A0186 P Y C-F UT I 120-CS 80A0183 N/A PT l-E51-0046 6" Pipe to Elbow 80A0186 P Y C-F UT I 120-CS 80A0183 N/A PT 1-E51-0047 6" Elbow to Pipe 80A0186 PY C-F UT I 120-CS 80A0183 N/A PT NES 239 6/82

~ PRH'ZRAM PLAN AND SCHEDULE By: th / g\\M system: RCIC Document No. 80A4425 App: a% / q% Preservice Inspection 5532 - PERRY Rev.3' Page 34 of 42 ~ icSefrfcITE oe "ER$ BT E%Y N C Me 6(E REMARKS PIPING WELDS Ref. Dwg. No. 06-04 1-E51-0048 6" Pipe to Elbow 80A0186 PY C-F UT IV 120-CS 80A0183 N/A PT l-E51-0049 6" Elbow to Pipe 80A0186 PY C-F UT IV 120-CS 80A0183 N/A PT l-E51-0050 6" Pipe to Valve F502 80A0186 PY C-F UT IV 120-CS 80A0183 N/A' PT l-E51-0051 6" Valve F502 to Flange PPP IX-RT-5 N/A C-F UT IV RT Procedure 80A0183 N/A PT 1-E51-0052 6" Flange to Strainer D025 80A0183 N/A C-F PT IV l-E51-0053 6" Strainer D025 to Flange 80A0183 N/A C-F PT IV l-E51-0054 6" Flange to Elbow 80A0183 N/A C-F PT IV l-E51-0055 6" Elbow to Pipe 80A0183 N/A C-F PT IV NEk 239 6/82

System: RCIc PROGRAM PLAN AND SCHEDULE By: th / A44 Document No. 80A4425 APP: umte / 4/h Preservice Inspection 5532 - PERRY Rev.3' Page 35 of 42 ~ COMPONENT COMPONENT PROCEDURE 8 CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No. 06-04 6" Pi 3e to Valve F501 80A0183 N/A C-F PT IV 1-E51-0056 i l-E51-0057 6" Valve F501 to Pipe 80A0183 N/A C-F PT IV 1-E51-0058 6" Pipe to 6" x 6" x 4" Tee 80A0183 N/A C-F PT IV l-E51-0059 6" x 6" x 4" Tee to 6" x 6" x 6" Tee 80A0183 N/A C-F PT IV l-E51-0075 6" Tee to Flanged Valve F011 80A0183 N/A C-F PT IV l-E51-0076 6" Flanged Valve F0li to Pipe 80A0183 N/A C-F PT IV l-E51-0076A 6" Pipe to Pipe 80A0183 N/A N/A PT IV Customer requested exam Customer k 1-E51-0062A 6" Pipe to Pipe 80A0183 N/A N/A PT IV requested exam NES 239 &82

System: RCIC PROGRAM PLAN AND SCHEDULE By: th / %\\d Document No. 80A4425 APP: W / 9/f+ Preservice Inspection 5532 - PERRY Rev.3 Page 36 of 42 COMPONENT COMPONENT PROCEDURE CODE ZONE IDEr4TIFICATION DESCRIPTION NUMBER (18 apphcable) CATEGORY METHOD NO. REMARKS PIPING WELDS Ref. Dwg. No. 06-04 1-E51-0077 6" Pipe to Valve F010 80A0183 N/A C-F PT IV l-E51-0060 6" Tee to Pipe 80A0133 N/A C-F PT IV l-E51-0061 6" Pipe to Elbow 30A0183 N/A C-F PT IV l-E51-0062 6" Elbow to Pipe 80A0lS3 N/A C-F PT IV 1-E51-0063 6" Pipe to Elbow 80A0183 N/A C-F PT IV 1-E51-0064 6" Elbow to Pipe 80A0183 N/A C-F PT IV l-E51-0065 6" Pipe to Elbow 80A0183 N/A C-F PT IV l-E51-0066 6" Elbow to Flanged Valve F030 80A0183 N/A C-F PT IV NES 239 6/82

PROGRAM PLAN AND SCHEDULE By: / 6t4 S RCIC btem:nt No. 80A4425 APP: h / 9/B+ Preservice Inspection 5532 - PERRY Rev.3 ' Page 37 of 42 COMPONENT COMPONENT PROCEDURE B K CODE 2ONE IDENT!FlCATION DESCRIPTION NUMBER Uf apphcable) CATEGORY METHOD NO. REMARKS PIPING WELDS Ref. Dwg. No. 06-04 1-E51-0067 6" Flanged Valve F030 to Pipe 80A0183 N/A C-F PT IV 1-E51-0068 6" Pipe to Valve F031 80A0183 N/A C-F PT IV 1-E51-0069 6" Valve F031 to Pipe 80A0183 N/A C-F PT IV 1-E51-0070 6" Pipe to Elbow 80A0183 N/A C-F PT IV l-E51-0071 6" Elbow to Pipe 80A0183 N/A C-F PT IV l-E51-0072 6" Pipe to Elbow 80A0183 N/A C-F PT IV 1-E51-0073 6" Elbow to Pipe 80A0183 N/A C-F PT IV l-E51-0074 6" Pipe to Penetration P101 Process Pipe 80A0183 N/A C-F PT IV l NES 239 682

B: tb l MN System: RCIC PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 App: / r nt / 't,7-r Preservice Inspection 5532 - PERRY Rev.3 Page 38 of 42 CALIBRATION CODE COMPONENT COMPOPENT PROCEDURE BLOCK CODE EXAM ZONE IDENT3FICAT10N DESCRIPTION NUMBER (if apphcabeti CATEGORY METHOD NO REMARKS WELDED ATTACHUENTS Ref. Dwg. No. 06-04 1-E51-H041-WA Pipe Welded Attachment 80A0183 N/A C-E PT II l-E51-H042-WA Pipe Welded Attachment 80A0183 N/A C-E PT II 9 9 4 NES 239 632

B: Ih / \\\\Sk System: RCIc PROGRAM PLAN AND SCHEDULE Y Document No. 80A4425 APP: 4Amt. / 9M+ Preservice Inspection 5532 - PERRY Rev.3' Page 39of 42 ~ CALIBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFICATION DESCRIPTION NUMBER Uf applecablel CATEGORY METHOD NO R".AAARKS COMPONENT EXAMINATION ( Ref. Dwg. No. 06-05 1-E51-F063-SE AM 10" Valve E51-F063 Body Weld 80A0193 PY-VALVE-B-M-1 UT III XXI-CS 80A0183 N/A PT 1-E51-F063-IS 10" Valve E51-F063 Internal Surface 80A0184 N/A B-M-2 VT-1 III NES 239 632

S em: RCIC PROGRAM PLAN AND CCHEDULE By: W / OM t No. 80A4425 APP: h / 9/94' Preservice Inspection 5532 - PERRY Rev.3' Page 40 of,42 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE CLOCK CODE EXAM ZONE

0ENTsFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOO NO. REMARKS COMPONENT EXAMINATION Ref. Dwg. No. 06-03, 06-06 1-E51-F065-B 6" Valve E51-F065 Bolting 80A0184 N/A B-G-2 VT-1 III l-E51-F065-IS 6" Valve E51-F065 Internal Surface 80A0184 N/A B-M-2 VT-1 Ill 1-E51-F066-B 6" Valve E51-F065 Bolting 80A0184 N/A B-G-2 VT-1 V l-E51-F066-IS 6" Valve E51-F066 Internal Surface 80A0184 N/A B-M-2 VT-1 V l-E51-F013-SEAM 6" Valve E51-F013 Body Weld 80A0193 PY-VALVE-B-M-1 UT III XX2-CS 80A0183 N/A PT l-E51-F013-IS 6" Valve E51-F013 Internal Surface 80A0184 N/A B-M-2 VT-1 III l-E51-F502-SEAM 6" Valve E51-F502 Body Weld 80A0183 N/A C-G PT V l-E51-0009-B 6" Flange Bolting 80A0184 N/A B-G-2 VT-1 V NES 239 6/82

^ B: t_D / \\\\Ik System: RCIc PRO 2 RAM PLAN AND SCHEDULE Y Document No. SOA4425 App: ~h / g/ff = Preservice Inspection 5532 - PERRY Rev.3 Page 41' of 42 l i CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIFICAT60N DESCRIPTION NUMBER (tf apphcable) CATEGORY METHOD NO REMARKS l LUMPUNEN I CAAMINAIIUN Ref. Dwg. No. 06-03, 06-06 1-E51-0001-A 6" Flange Bolting 80A0184 N/A B-G-2 VT-1 V NEk 239 6/82

DES system: RCIC PROGRAM PLAN AND SCHEDULE By: tb / d(h ' Document No. 80A4425 App: .d m / 9/ff Preservice inspection 5532 - PERRY Rev.3 Page 42 of 42 ~ CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO. REMARKS RCIC PUMP E51-C001 Ref. Dwg. No. 06-01, 06-07 1-E51-C001-SEAM I RCIC Pump E51-C001 80A0183 N/A C-G PT V Casing to Flange (discharge) 1-E51-C001-SEAM II RCIC Pump E51-C001 80A0183 N/A C-G PT V Casing to Suction Nozz!e m neb 239 6/82 .}}