mr NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO.

REV. 2 a mam -Se" I

PAGE nF PSI PROGRAM PLAN:

REACTOR RECIRCULATION SYSTEM PERRY NUCLEAR POWER PLANT, UNIT !

Prepared For CLEVELAND ELECTRIC ILLUMINATING COMPANY copy No Assigned To eroget Appocg APPROVALS TITLE / DEPT. - SIGN ATURE - D ATE REV NO PREPARED BY P

.Mp

@Mgu 0

X N_

l M N/

~

Susan Meyer Mmf

/n/n/

g 10/1/84 e4/gv

/d to -z a/.w b/

3 4

5 6

7 3 0 f I s= =

n s 2', '.' 'Ui LtU ll3Dy 8

~" unu v mm o,.;,;::_

0 ls42188!!a gggg, o lita i0 o

PDR II l

l P!MM # NES 204 9/46

80A4428 ggg REVISION LOG NUCLEAR ENERGY SERVICES, INC.

PAGE OF RE.

DATE PA$E DESCRIPTION APPROVAL go g,

k 1

CRA No. 3761 hh 12/7/83 T ru Added Component Examinations 9 'V

/2\\

10/24/84 Ng,p 7.,gp All Revised to incorporate customer comments, field changes and addition of welded attachments.

FC's 09-01 #1 thru #18 and 09-02 #1 thru #19 CRA #4681 e

FORM eNES 206280

80A4428 DOCUMENT NO.

11 anwrer Q --::--

NUCLEAR ENERGY SERVICES TABLE OF CONTENTS PAGE 1.

INTRODUCTION 4

2.

SYSTEM DESCRIPTION 4

h 2.1 Exemptions and Exceptions 4

2.2 Exceptions 4

2.3 Classifications 4

2.4 Calibration Standards 5

2.5 Isometric Figures and Sketches 5

3.

PROGRAM PLAN AND SCHEDULE 7

System Classification Figure 8

Weld Map Figures 9

Component Figures 11 Schedule Sheets Piping Welds 14 Schedule Sheets Component Examinations 52 TABLES b

2.1 Exemptions 7

2.2 Exceptions (provided later) 2.3 Classifications 8

2.4 Referenced Calibration Standards 5

2.5 Isometric / Component Figures 6

l

(

l l

F QRM s NES 205 2/80

i DOCUMENT NO.

1 4anerer D-eene g

NUCLEAR ENERGY SERVICES REACTOR RECIRCULATION SYSTEM

1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice Inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. All components in the Reactor Recirculation (RR) system required to Se eKamined by ASME BPV Code,Section XI, are included.

The General Reference Text, NES Document 80A4420, presents the development and required procedural information for the PSI Program Plan generic to all systems examined.

2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS The portions of the RR System that are exempted from examination as allowed by ASME BPV Code,Section XI, and as described in the General Reference Text are presented in Table 2.1.

~

2.2 EXCEPTIONS Exception may be taken to code requirements of examination where access is not possible due to design limitations. Provision for such exception is presented in the General Reference Text. Exceptions that are taken to required exams of the RR System are itemized in Table 2.2 (Provided later).

2.3 CLASSIFICATIONS h

This system's piping and instrumentation diagrams have been reviewed and Quality Group A, B and C (ASME Code Class 1, 2 and 3) boundaries have been established as required by ASME Code Section XI, IWA-1400. The General Reference Text discusses the basis for these determinations.

~

F JAM s NES 205 2/80

80A4428 DOCUMENT NO.

mr

,,, Q _

11 NUCLEAR ENERGY SERVCES Diagrams delineating these boundaries for the RR System are presented herein.

k RR System classification and boundaries are presented in Table 2.3.

2.4 CALIBRATION STANDARDS Table 2.4 lists the Calibration Standards for ultrasonic examinations scheduled for the RR System. All calibration standards are to be retained on site.

Design drawing documents are presented in Table 3.5 (Later) of General Reference Text.

TABLE 2.4 Referenced Calibration Standard Title Nominal Size Thickness Material h

PY-24-XXI-SS 24" 1.386" SA358 PY-24-XXI-SS-F 24" 1.735" SA403

, PY-24-XX2-SS-F 24" 1.400" SA403 PY-24-CLAD-SS 24" 1.386" SA358 PY-22-XXI-SS 22" 1.006" SA358 PY-22-XX2-SS 22" 1.25" SA403 PY-22-CLAD-SS 22" 1.000" SA358 PY-16-100-SS 16" 1.031" SA358 PY-16-CLAD-SS 16" 1.030" SA358 PY-12-80-SS-F 12"

.685" SA403 PY-12-XXI-SS 12.75"

.700" SA358 l

PY-12-SWEEP-SS 12"

.7" SA403 l

PY-12-CLA-SS 12"

.7" SA358 j

PY-4-XXI-SS 4"

.325" SA358 I

PY-STUD-RR-3-CS 3"$

SA194 FORM NES 205 2/80

^

DOCUMENT NO.

a mwr er Q---- -

11 6

61 E

OF NUCLEAR ENERGY SERVICES 2.5 ISOMETRIC FIGURES AND SKETCHES The piping isometric and component figures listed in Table 2.5 show the identification and location of areas for the RR System requiring examination.

Sketches may also be included that illustrate or locate areas of components requiring identification for examination.

TABLE 2.5 RR System: Isometric / Component Figures h

09-01 Revision I 09-02 Revision 1 09-03 Revision 0 09-Ote Revision 0

3. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.

Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, any calibration standard number referenced for ultrasonic examination, and the zone in which the examination area is located, as described in Section 3 of the General Reference Text.

Examination items are first divided according to the weld or hanger figure that they appear on.

Multiple examination requirements of the same component are listed together in the schedule tables. Component examinations or component bolting follow the piping weld examinations for each system. Hanger examinations appear as the next section, followed by the hydrovisual examination requirements.

l FORM e NES 20s 2180 l

DOCUMENT NO.

80A4428 aanerer & eene 11

~

=

NUCLEAR ENERGY SERVICES A

TABLE 2.1 SYSTEM EXEMPTIONS ASME Code Basis For Class Description Ref. P&ID Exemption 1

All component con-D-302-602 Piping 1" nominal size nections, piping and and smaller exempted associated valves of as per ASME Section XI 1" nominal size and Code IWB-1220(b) S'78 smaller Addenda 2

All vent, drain, test D-302-602 All component connec-sample, fill, by-pass tions, piping & associ-and instrument con-ated valves, and vessels nections 4" nominal (and their supports) size or smaller that are 4" nominal pipe size & smaller are exempted as per ASME Section XI, IWC-1220(d)

S'75 Addenda l

l l

i F JAM s NES 205 2/80

DOCUMENT NO.

30A4428 11 annerer % come PAGE 8

OF M

NUCLEAR ENERGY SERVICES TABLE 2.3 SYSTEM EXEMPTIONS ASME Code Class Description Ref. P&lD 1

Loops A and B from Reactor Pressure D-302-602 Vessel (RPV) through valves B-33-F023 A, B; through pumps C001 A, B; and through valves B33-F060 A, B and l

B33-F067 A, B to RPV, including 4" Decontamination Connections and Reactor Water Clean Up (RWCU)

Intertie 6 URM # NES 205 2/80

80A442B 9

61 eace w

12*

I?'

' ~ =

[;N2A I42F 3

16, 16

[.N2B N2G 3

g.

u,

[ N2C N2H 3

[ N2D N2J 3 t12E N2K 3 m

22*

22' (pg[h6)

[

HlA til B ]

T7

\\/

67 FOS 2 067

[

FT F060 F 0 t

30 A

REE(JN 65.

-i --

0-302-602 D

[

CECOrt.

4 CONNECT RECIRC.

RWCU TYP.

u PUMP 4"

FIG. B-10 4

4-RECIRC.

PUMP IO RWCU RWCU FIG. B-10 FIG. B-10 m,,

'a SYSTEM CLGSIFICATION 853 REClRCULATION

/

.1

.. o 8-3 er U w urn IP/84 =MA ep use s]sy

"*" PERRf-5532

.cr ro sc=a FORM 8 NES 226-5/80 e

l L

~

i 3%z 3

I i

y J

n g

o s2 8.$

ra_% a fE s! ! j.i l,!

a o

l' ei j j j i j ll

@ iD. i a

e i

m

{

b ~Qf-1 kj

$3

, 2 pu de i $$ 5 r

e=

b y h

~_<-$o 1

9 3 G

$ 8

$ 8,a -

T N

i O @T 5 Sh.g-

.l N j h

3 ca @

8 h,

r

.g a

3 o

i

_ a ye..

  1. g i 44j q~$

n e

7% d s M e - a tv.

8 7

s

  1. sQi 2

8 N

, o O

h

$4 I

T"

{

Ih o o g

~

o 2

@g y

S E E u r

9 E

M o'

t-1 Bg-e 8

Bd

~

S 1

j@ l 8

b

~

.e y' s.i l

' ay. 1$ { ' :!fj r _

ii.f

  • i m

6

"' w

@O f

e b

g. t G$

~

L e

8 5

8 b g f 9 Ig g

o (8

Q

@e/

g5 ell g J

5 o

.e n

.N

.k k k 1

m g

_yx*V 8 h i

_s g

g g

e

..k

@s f

o M

o 0

$ 0 )$

a 2

ll

G g

n o

p l9I t;

4 a3 J

8 S :

  1. 2 l

s?

aN

~

e a

i o a g

gs

$,5-m?.

i A 43 5 s

c o a

,e g

o 8

[ _8s E @s dy s

e o o 1

a a

@j ii g 5

4 s

3 we a

s o

o e o

ag a m

~T "d

E !'@ i f l

\\

A b

~

er

_0 H ki's

?

p8 Ug.1x.rn $

U N@1

~

s o

e 9 '9 a

o 8

4 D 8 [ G T' -

N-yQk 1

y lfla G~

8 K

p a

i MQ 8

~

X o

.2 o j 8 22' 8

/

g j j

6 G-3 f

c s

_ @,*2 h-

!,:s OBl 8

a S

@ g g l

o m

j f

8

' * % z.

y sy_Q

  • ho gI a

z f

~

g 8

.s i S

p.

3 e

u g g

~.t.

i al

[r fE d !) C

- n A

1 Ny 1

i

6 e

8 c,

O'B h 8 h

=,

y E

~

$ 1 r

. :ss 8 @

WW R E (.y

  • g W

es

~-

77 8 E h

.I

/ N.$

e@8 8 vd/

+ e

c

- =

a8 k R n

'#k h

(

o

~

-a 8

g

-d 9

4

-h j

G s f i

3 3

2 5 8

8s g

u;(g 8

_3 6

s ze g

os w

3 m W

~

g*-

s x

=

l

DOCUMENT NO. __. _80 A4428 my 12 61 PAGE OF NUCLEAR ENERGY SERVICES, INC.

="

1 4

(1h 9

oY

-t~

c 1

N 1

,Og s

~

O E X.:

Si t 1 y

1-B33-COO 1A-B2 m!

,,s gg *'

ri 1-B33-C001A-N2 i

+s

@5

'N

/

q i

[l

\\

NOTE: COMPLETE BOLTING IDENTIFICATION NUMBERS VIEW A*U "

HAVE PREFIX OF 1-B33-COO 1 A d

A FOLLOWING WITH "N" DESIGNATING NUT AND "B" DESIGNATING BOLT k

f+V l

L v

i.

ni

..A"

[

n i.

+

jf c-4t=cOs v

u DISCHARGE

^

wie..

U l

8 REF. DWGS.

l REACTOR SECIRC.

C001A SUCTION B33 BYRON JACKSON PUMP BOLTING LOCATION DWG. NO.1F-7837 REV. C nev: O rio. No. 09-03 a

1F-6865 REV. B l

av:

f6 DATE:d['#[8" CLASS 1 -

APP: g/)

DATE: /0//o/83 PROKCT:

PERRY UNIT 1 NOT TO SCALE

DOCUMENT NO.

80A4428 at 13 61 PAGE OF NUCLEAR ENERGY SERVICES, INC.

C

,-y~

14 5',

O

- @G s

EX.:

s

[

Lf

,'O*

1-B33-COO 1B-B2

,,.s h

g 1-833-COO 1B-N2

@ 59

'N

/

i J

's NOTE: COMPLETE BOLTING l

1DENTIFICATION NUMBERS VIEW "A" "A" HAVE PREFIX OF 1-B33-COO 1B FOLLOWING WITH "N" DESIGNATING NUT AND

  • B" DESIGNATING BOLT L

V V

"A" i-

+

il i

+

"A" i

i

. c-kt=c0s

' wf y

u v

o

[

N DISCHARGE

.... -...nne.

It

'l REF. DWGS.

H

      • d" REACTOR RECIRC.

SUCTION B33 PUMP COO 1B BYRON JACKSON PUMP BOLTING LOCATION DWG. NO.1F-7837 REV. C nev: O rio. No.

09-04 1F-6865 REV. B

,y; yg o,1,;g/f3/g3 CLASS 1-see: 4/r oare:lo//o/63 PERRY UNIT 1 NOT TO SCALE

B:

h%

/ W\\tk System: RR PROTRAM PLAN AND SCHEDULE Y

Document No. 80A4428 App:

&t,?o /

Preservice Inspection 5532 - PERRY Rev.2 Page 14 ~/Mf's of 61 ioNEfr"CATEm DESCTR T

NUM8 pol CA ORY ME NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 h

1-B33-0002 22" Nozzle to Pipe 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0002-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0003 22" Pipe to Elbow 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0003-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0003-D1 Elbow Short Seam Downstream 80A0187 P Y B-3 UT III XXI-SS-F 80A0183 N/A PT l-B33-0003-D2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT III XXI-SS-F 80A0183 N/A PT l-B33-0003A 22" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0003A-U1 Elbow Short Seam Upstream 80A0187 P Y B-3 UT III XX1-SS-F 80A0183 N/A PT NES 239 6/82

System: RR

~

PROGRAM PLAN AND SCHEDULE BY3 tD

/

W\\ E t

Preservice Inspection 5532 - PERRY Rev.2~Ja nl / /o/se Document No. 80A4428 App:

Page 15 6f 61 COMPONENT COMPONENT PROCEDURE CODE E

ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable)

CATEGORY METHOD NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 h

1-B33-0003A-U2 Elbow Long Seam Upstream 80A0187 P Y B-3 UT III X XI-SS-F 80A0183 N/A PT l-B33-0003A-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0004 22" Pipe to Pipe 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0004-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0004-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT i

1-B33-0005 22" Pipe to Elbow 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0005-U Pipe Seam Upstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0005-D1 Elbow Short Seam Downstream 80A0187 P Y B-3 UT 11 XXI-SS-F 80A0183 N/A PT 1

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

tn

/ RM4 Document No. 80A4428 App:

&cw / /e/f4 Preservice Inspection 5532 - PERRY Rev.2 Page 16 of 61 CALIBRATION CODE IDE IF T ON DE T

BE (tf app able)

CA 5RY T

NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 b

1-B33-0005-D2 Elbow Long Seam Downstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0006 22" Elbow to Valve B33-F023A 80A0187 P Y B-3 UT 11 XXI-SS-F 80A0183 N/A PT l-B33-0006-U1 Elbow Short Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0006-U2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F 30A0183 N/A PT l-B33-0007 22" Valve B33-F023A to Pipe 80A0187 PY B-3 UT II CLAD-SS 80A0183 N/A PT.

l 1-B33-0007-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0008 22" Pipe to 22" x 4" 80A0187 P Y B-3 UT II Contour Nozzle XXI-SS I

80A0183 N/A PT l-B33-0009 22" x 4" Contour Nozzle to 80A0187 PY B-3 UT II 4" Pipe XXI-SS 80A0183 N/A PT NES 239 6/82

B:

4

/ Wh4 System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428 APP:

A 7w

/ r#-)-

Preservice Inspection 5532 - PERRY Rev.2 Page 17 'of 61 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (18 apphcable)

CATEGORY METHOO NO.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 h

UT II 1-B33-0009D Pipe Seam, Downstream 80A0187 PY B-J \\

XXI-SS 80A0183 N/A PT l-B33-0010 4" Pipe to Flange 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT 1-B33-0010U Pipe Seam Upstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0008A 22" Pipe to 22" x 4" Sweepolet 80A0187 PY B-3 UT 11 XXI-SS 80A0183 N/A PT 1-B33-0011 22" Pipe to Elbow 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-00ll-U Pipe Seam Upstream 80A0187 PY B-3 UT II XX1-SS 80A0183 N/A PT 1-B33-00ll-D1 Elbow Short Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT i

l-B33-00ll-D2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT 4

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

th

/ \\h\\td Document No. 80A4428 App: Jant.

/ /d/F/-

Preservice Inspection 5532 - PERRY Rev.2 Page 18 of 61 i

CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOD NO.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 k

1-B33-0012 22" Elbow to Pump C001 A Casing 80A0187 P Y B-L-1 UT II XX2-SS-F 80A0183 N/A PT l-B33-0012-UI Elbow Short Seam Upstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183

.N/A PT l-B33-0012-U2 Elbow Long Seam Upstream 80A0187 P Y B-3 UT 11 XXI-SS-F 80A0183 N/A PT l-B33-0014 Pump C001 A Casing to 24" Pipe 80A0187 P Y B-3 UT II CLAD-SS 80A0183 N/A PT l-B33-0014-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0015 24" Pipe to 24" x 4" 80A0187 PY B-3 UT II Contour Nozzle XXI-SS 80A0183 N/A PT l-B33-0016 24" x 4" Contour Nozzle to 80A0187 PY B-3 UT II 4" Pipe XXI-SS 80A0183 N/A PT l-B33-0016-D Pipe Seam Downstream 30A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT

'NES 239 6/82

PROGRAM PLAN AND SCHEDULE By:

th

/ %\\M System: RR APP: h

/ /0/#4 Document No. 80A4428 Preservice Inspection 5532 PERRY Rev.2 Page 19 of.61 l

CAUBRATION CODE I C T ON DE NU BE (if appa able)

CA ORY NO REHARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0017 4" Pipe to Flange 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0017-U Pipe Seam Upstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0018 24" Pipe to Valve B33-F060A 80A0187 P Y B-3 UT II CLAD-SS 80A0183 N/A PT 1-B33-0018-U Pipe Seam Upstream 80A0187 PY B-3 UT.

II XXI-SS 80A0183 N/A PT 1-B33-0019 24" Valve B33-F060A to Pipe 30A0187 P Y B-3

.UT II CLAD-SS 80A0183 N/A PT l-B33-0019-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XX1-SS 80A0183 N/A PT 1-B33-0020 24" Pipe to Elbow 30A0187 P Y B-3 UT 11 XX1-SS 80A0183 N/A PT 1-B33-0020-U Pipe Seam Upstream 80A0187..

PY B-3 UT II XXI-SS 80A0183 N/A PT i

NES 239 6/82

B:

0

/ %DM System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428 APP: h

/ 10/N Preservice Inspection 5532 - PERRY Rev.2' Page 20 of'61 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (11 apphcable)

CATEGORY METHOD NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 h

1-B33-0020-D1 Elbow Short Seam 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0020-D2 Elbow Long Seam 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT 1-B33-0021 24" Elbow to Pipe 80A0187 PY B-3 UT 11 XXI-SS 80A0183 N/A PT l-B33-0021-U1 Elbow Short Seam 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l

t 1-B33-0021-U2 Elbow Long Seam 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0021-D Pipe Seam Downstream 80A0187 PY B-3 UT II j

XXI-SS 80A0183 N/A PT I

l-B33-0022 24" Pipe to Valve B33-F067A 80A0187 PY B-3 UT II_

CLAD-SS

(

80A0183 N/A PT l-B33-0022-U Pipe Seam Upstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT I

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE BY3 N

/%\\M Document No. 80A4428 App:,AgA

/ /b/f+'

Preservice Inspection 5532 - PERRY Rev. 2' Page 21 off 61 CAUBRATION CODE COMPONENT COMPONENT PROCEDURS SLOCK CODE EXAM ZONE tOENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOD NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 b

1-B33-0023 24" Valve B33-F067A to Pipe 80A0187 P Y B-3 UT 11 CLAD-SS 80A0183 N/A PT l-B33-0023-D Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0024 24" Pipe to Elbow 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0024-U Pipe Seam Upstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0024-D1 Elbow Short Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F i

80A0183 N/A PT l-B33-0024-D2 Elbow Long Seam Downstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0025 24" Elbow to Pipe 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0025-U1 Elbow Short Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT 1

NES 239 6/82

B:

N

/ W%k System: RR PRO 2 RAM PLAN AND SCHEDULE Y

Document No. 80A4428 App: Jaim

/ m/M Preservice Inspection 5532 - PERRY Rev.2' Page 22 o'f 81 COMPONENT COMPONENT PROCEDURE OK CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD No.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0025-U2 Elbow Long Seam Upstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0025-D Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0026 24" Pipe to 24" x 16" Cross 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT 6

1-B33-0026-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT 1-B33-0027 16" Pipe Cap to Pipe 80A0187 PY B-3 UT III CLAD-SS i

80A0183 N/A PT l-B33-0027-U Pipe Seam Upstream 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT 1-B33-0028 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0133 N/A PT 1-B33-0029 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT i

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

th

/ %\\t4 APP: hs

/ /d/#

Document No. 80A4428 Preservice Inspection 5532 - PERRY Rev.2 Page 23 6f 61 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIFICATION DESCRIPTION NUMBER (if applicable)

CATEGORY METHOO NO.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 h

1-B33-0030 16" Pipe to 24" x 16 Cross 80A0187 P Y B-3 UT III 100-SS 80A0183 N/A PT l-B33-0030-D Pipe Seam Downstream 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT l-B33-0031 24" x 16" Cross to 16" Pipe 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0031-D Pipe Seam Downstream 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT I

l-B33-0032 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT l

l-B33-0033 16" Pipe to 16" x 12" Sweepolet 80A0187 PY-1(-

B-3 UT III i

100-55 80A0183 N/A PT l-B33-0034 16" Pipe to Cap 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0034-U Pipe Seam Upstream 80A0187 PY B-3 UT III 100-55 80A0183 N/A PT I

I NES 239 6/82

System: RR PROGRAM PLAN AND CCHEDULE By:

in

/ w\\M Document No. 80A4428 App: h

/ /o/M

~

Preservice Inspection 5532 - PERRY Rev.2 Page 24 of 61 IDSE7CATEON DE BE CA ORY No REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0035 16" x 12" Sweepolet to 12" Pipe 80A0187 PY B-3 UT III Pipe Side h CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0035-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0036 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0036-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0036-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0037 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0037-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0037-D Pipe Seam Downstream 80A0187 PY -

B-3 UT III XXI-SS 80A0183 N/A PT 4

NES 239 6/82

System: RR PRE 2 RAM PLAN AND SCHEDULE By:

d\\

/ W\\t4 Document No. 80A4428 App:

h /

/0/f4' Preservice Inspection 5532 - PERRY Rev.2 Page 25 of 61 soSEETb DESC NU 8 b

C MY ME REMMKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0038 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0038-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0040 16" x 12" Sweepolet to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0040-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0041 12" Pipe to Elbow 80A0187 PY B-3 UT Ill XXI-SS 80A0183 N/A PT l-B33-0041-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0041-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT

~

l-B33-0042 12" Elbow to Pipe 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT 6

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By2 N

/ %\\@

Document No. 80A4428 APP:

Preservice Inspection 5532 - PERRY Rev.2 ~h

/

/Nf4-Page 26 of 61 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcable)

CATEGORY METHOD NO.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 k

1-B33-0042-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0042-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0043 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0043-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0045 24" x 16" Cross to 80A0187 P Y B-3 UT III 24" x 12" Reducer XX2-SS-F 80A0183 N/A PT l-B33-0046 24" x 12" Reducer to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 P Y UT Reducer Side SWEEP-SS 80A0183 N/A PT l-B33-0046-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0047 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT NES 239 6/82

S stem: RR PROGRAM PLAN AND SCHEDULE By:

th

/ %Md bment No. 80A4428 APP:

h / /o/P4 Preservice Inspection 5532 - PERRY Rev.2 Page 27 of 61-IDSEETION DES @7T NU B a

CA Y

NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 k

1-B33-0047-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0047-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0048 12" Elbow to Pipe 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0048-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0048-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT i

1-B33-0049 12" Pipe to Nozzle 80A0187 PY B-3 UT III l

CLAD-SS 80A0183 N/A PT l

1-B33-0049-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT t

l-B33-0051 16" x 12" Sweepolet to Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY,

UT Sweepolet Side SWEEP-SS 80A0183 N/A PT 1

NES 239 6/82

B:

1 L%

/jdtLIr System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428 App:

MA

/ /o/P+'

Preservice Inspection 5532 - PERRY Rev. 2 ~ Page 28 6f 61

/

IDTEF AT ON DE T

8 b

CA ORY ME REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0051-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0052 12" Pipe to Elbow 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0052-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0052-D Elbow Seam Downstream 80A0187 P Y B-3 UT III 80-SS-F 80A0183 N/A PT i

l-B33-0053 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT 1-B33-0053-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT 1-B33-0053-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0054 12" Pipe to Nozzle 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT NES 239 6/82

System: RR By:

th

/ w\\%

Document No. 80A4428 PROGRAM PLAN AND SCHEDULE App:

sa h / fofjv.

Preservice Inspection 5532 - PERRY Rev.2 Page 29 of 61

~

COMPONENT COMPONENT PROCEDURE O

CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (11 apphcable)

CATEGORY METHOO NO REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 k

1-B33-0054-U Pipe Seam Upstream 80A0187 PY B-3 UT III XX1-SS 80A0183 N/A PT l-B33-0056 16" x 12" Sweepolet to 12" Pipe 80A0187 P Y B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0056-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0057 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0057-U Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0057-D Elbow Seam Downstream 80A0187 P Y B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0058 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0058-U Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT 4

NES 239 6/82

System: RR PROGRAM PLAN AND CCHEDULE BY:

in

/

W\\t*

Document No. 30A4428 Appe h / /0/f+'

Preservice Inspection 5532 - PERRY Rev.2 Page 30.of 61 Call 8 RATION CODE 80E ON DE NUMBE (if able)

CA ORY T

NO.

REMARKS LOOP A PIPING WELDS Ref. Dwg. No. 09-01 1-B33-0058-D Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0059 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0059-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

4

/ w\\t4 Document No. 80A4428 App:

~J e __/ /0//f Preservice Inspection 5532 - PERRY Rev.2 Page 31 of 61 OTEET70N DESCR NU BE f

b CA ORY ME NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 09-01 1-B33-H306A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-H305A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-5372A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II l-B33-5373 A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II l-B33-S374 A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II 1-B33-S375A-WA Pipe Welded Attachment 80A1083 N/A B-K-1 PT Il 1-B33-S351 A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-S352A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III 1

NES 239 &82

System: RR PRO 2 RAM PLAN AND SCHEDULE By:

th

/ ind Document No. 80A4428 APP:

Am

/ 10/f4 Preservice Inspection 5532 - PERRY Rev.2' Page 32 di di CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 09-01 1-B33-5353 A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-5354A-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III I

l l

l 1

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

R%

/ %\\tk Document No. 80A4428 App: Jamo

/ /o/F4-Preservice Inspection 5532 - PERRY Rev.2' Page 33 di 61 COuPONENT COMPONENT PROCEDURE K

CODE E

ZONE IDENTIFICATION DESCRIPTION NUMBER (tf applicable)

CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0062 22" Nozzle to Pipe 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT' l-B33-0062-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0063 22" Pipe to Elbow 80A0187 PY B-3 UT 111 XXI-SS 80A0183 N/A PT l-B33-0063-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0063-D1 Elbow Short Seam Downstream 80A0187 P Y B-3 UT III XXI-SS-F 80A0183 N/A PT l-B33-0063-D2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT III XXI-SS-F 80A0183 N/A PT l-B33-0063A 22" Elbow to Pipe 80A0187 P Y B-3 UT III XXI-SS 20A0183 N/A PT l-B33-0063A-Elbow Short Seam Upstream 80A0187 PY B-3 UT III U1 XXI-SS-F 80A0183 N/A PT NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

/

W\\i4 Document No. 80A4428 App:

dam.

/ /0/K4.'

Preservice Inspection 5532 - PERRY Rev.2' Page 34 of 61

~

NETE DESC E NUBTE CA Y

ME N

REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0063A-Elbow Long Seam Upstream 80A0187 PY B-3 UT Ill U2 XXI-SS-F -

80A0183' N/A PT l-B33-0063A-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0064 22" Pipe to Pipe 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0064-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0064-D Pipe Seam Downstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0065 22" Pipe to 22" x 22" x 20" TEE 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0065-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT l

l-B33-0066 22" x 22" x 20" TEE to 22" Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT NES 239 6/82

System: RR PRO 1 RAM PLAN AND SCHEDULE By:

t&

/ \\\\\\M Document No. 80A442g App:

h

/ jgfy Preservice Inspection 5532 - PERRY.

Rev.2 Page 35 'of'61 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if applicable)

CATEGORY, METHOD NO.

REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0066-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0067 22" Pipe to Elbow 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0067-U Pipe Seam Upstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0067-D1 Elbow Short Seam Downstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0067-D2 Elbow Long Seam Downstream 80A0187 PY B-3 UT II l

XX1-SS-F j

80A0183 N/A PT l-B33-0068 22" Elbow to Valve B33-F023-B 80A0187 PY B-3 UT 11 XX2-SS-F 80A0183 N/A PT l-B33-0068-U1 Elbow Short Seam Upstream 80A0187 PY B-3 UT II XX1-SS-F 80A0183 N/A PT l-B33-0068-U2 Elbow Long Seam Upstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT I

NES 239 6/82

B:

N

/WO System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428 App: h

/ /d /Pi-Preservice Inspection 5532 - PERRY Rev.2 Page 36 of 61 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE t0ENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOO NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0069 Valve B33-F023B to 22" Pipe 80A0187 PY B-3 UT II CLAD-SS 80A0183 N/A PT l-B33-0069-D Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0070 22" Pipe to 22" x 4" 80A0187 P Y B-3 UT II Contour Nozzle XXI-SS 80A0183 N/A PT l-B33-0071 22" x 4" Contour Nozzle to 4" Pipe 80A0187 PY B-3 UT 11 XXI-SS 80A0183 N/A PT l-B33-0071-D Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0072 4" Pipe to Flange 80A0187 PY B-3 UT II ~

XXI-SS 80A0183 N/A PT l-B33-0072-U Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0070A 22" Pipe to 22" x 4" Sweepolet 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT I

NES 239 6/82

B3 ib

/ WM Systema RR PRO 1 RAM PLAN AND SCHEDULE Y

Document No. 80A4428 App: Jamt

/ fo /s g.

Preservice Inspection 5532 - PERRY Rev.2' Page 37 'of 61 l

IDE F CAT ON DE T

NU b CA ORY No REMARKS l

LOOP B PIPING WELDS Ref. Dwg. No. 09-02 b

1-B33-0073 22" Pipe to Elbow 30A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0073-U Pipe Seam Upstream 30A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0073-D1 Elbow Sh*. bam Downstream 80A0187 PY B-3 UT II X XI-SS-F 80A0183 N/A PT l-B33-0073-D2 Elbow long Seam Cownstream 80A0187 PY B-3 UT II l

XXI-SS-F 80A0183 N/A PT 1-B33-0074 22" Elbow to Pump C001B Casing 80A0187 PY B-3 UT II XX2-SS-F 80A0183 N/A PT l-B33-0074-U1 Elbow Short Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0074-U2 Elbow Long Seam Upstream 80A0187 P Y B-3 UT II l

XXI-SS-F 80A0183 N/A PT l-B33-0076 Pump C001B Casing to 24" Pipe 80A0187 P Y B-3 UT II CLAD-SS fJA0183 N/A PT NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE EY:

N

/ %M Document No. 80A4428 App:

Jamo

/ /0/p.

Preservice Inspection 5532 - PERRY Rev. 2 Page 38 of'61 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02

[b 1-B33-0076-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0077 24" Pipe to 24" x 4" Contour 80A0187 P Y B-3 UT II Nozzle XXI-SS 80A0183 N/A PT l-B33-0078 24" x 4" Contour Nozzle to 4" Pipe 80A0187 PY B-3 UT II XX1-SS 80A0183 N/A PT l-B33-0078 0 Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0079 4" Pipe to Flange 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT 1-B33-0079-U Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT 1-B33-0080 24" Pipe to Valve B33-F060B 80A0187 PY B-3 UT II CLAD-SS 80A0183 N/A PT l-B33-0080-U Pipe Seam Upstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT I

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE BY:

N

/ %\\tk Document No. 80A4428 App:

armt,

/ m#4-'

Preservice Inspection 5532 - PERRY Rev. 2 ' Page 39 of 61 CALIBRATION CODE IDE 4FICAT ON DE CR T BE (If app biel CA ORY T

NO.

REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 1-B33-0081 Valve B33-F060B to 24" Pipe 80A0187 P Y B-3 UT II CLAD-SS 80A0183 N/A PT l-B33-0081-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0082 24" Pipe to Elbow 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0082-U Pipe Seam Upstream 80A0187 PY-24 '

B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0082-D1 Elbow Short Seam Downstream 80A0187 PY B-3 UT 11 XXI-SS-F 80A0183 N/A PT l-B33-0082-D2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0083 24" Elbow to Pipe 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0083-U1 Elbow Short Seam Upstream 80A0187 PY B-3 UT II XXI-SS-F 80A0183 N/A PT NES 239 682

System: RR PROIRAM PLAN AND SCHEDULE By:

4

/ %M Document No. 80A4428 App: 1h

/ /o/P+

Preservice Inspection 5532 - PERRY Rev.2 Page 40 df 61 IDNEETEON DESC T MB app C

ORY REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 k

1-B33-0083-U2 Elbow Long Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0083-D Pipe Seam Downstream 80A0187 P Y B-3 UT XXI-SS 80A0183 N/A PT l-B33-0084 24" Pipe to Valve B33-F067B 80A0187 P Y B-3 UT II CLAD-SS 80A0183 N/A PT 1-B33-0084-U Pipe Seam Upstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0085 24" Valve to Pipe 80A0187 P Y B-3 UT II CLAD-SS 80A0183 N/A PT l-B33-0085-D Pipe Seam Downstream 80A0187 PY B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0086 24" Pipe to Elbow 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0086-U Pipe Seam Upstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE B73 tD

/ WM Document No. 80A4423 App:,ddeK

/ /0/P4 Preservice Inspection 5532 - PERRY Rev. 2' Page 41 of 61 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If applR*Ne)

CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0086-D1 Elbow Long Seam Downstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0086-D2 Elbow Long Seam Downstream 80A0187 P Y B-3 UT II X XI-SS-F 80A0183 N/A PT 1-B33-0087 24" Elbow to Pipe 80A0187 P Y B-3 UT II XVI-SS 80A0183 N/i:

PT l-B33-0087-U1 Elbow Short Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT 1-B33-0087-U2 Elbow Long Seam Upstream 80A0187 P Y B-3 UT II XXI-SS-F 80A0183 N/A PT l-B33-0087-D Pipe Seam Downstream 80A0187 P Y B-3 UT II XXI-SS 80A0183 N/A PT l-B33-0088 24" Pipe to 24" x 16" Cross 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0088-U Pipe Seam Upstream 80A0187 P Y B-3 UT III XXI-SS 80A0183 N/A PT i

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE Bys N

/ \\h\\t4 Document No. 80A4428 App:

doest,

/ /oM '

Preservice Inspection 5532 - PERRY Rev. 2 ' Page 42 of 61 ioScEr*c'm o"EscEfEN NUMB ab CA ORY ME REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0089 16" Pipe Cap to Pipe 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0089-U1 Pipe Seam Upstream 80A0187 PY B-3 UT III 100-55 80A0183 N/A PT l-B33-0090 16" Pipe to 16" x 12" Sweepolet 80A0187 P Y B-3 UT III 100-SS 80A0183 N/A PT l-B33-0091 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT 1-B33-0092 16" Pipe to 24" x 16" Cross 80A0187 P Y B-3 UT III 100-SS 80A0183 N/A PT l-B33-0092-D Pipe Seam Downstream 80A0187 PY B-3 UT 111 100-SS 80A0183 N/A PT I-B33-0093 24" x 16" Cross to 16" Pipe 80A0187 PY B-3 UT III CLAD-SS SUA0183 N/A PT l-B33-0093-D Pipe Seam Downstream 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT NES 239 6 82

System: RR PROGRAM PLAN AND SCHEDULE By:

{h

/ %\\qh Document No. 80A442g App: h / fo/p4 Preservice Inspection 5532 - PERRY Rev.2 Page 43 6f 61 CAUBRATION CODE T

DE T

NU BE (if a ble)

CA ORY T

NO RO4 ARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 1-B33-0094 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT 1-B33-0095 16" Pipe to 16" x 12" Sweepolet 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT l-B33-0096 16" Pipe to Cap 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0096-U Pipe Seam Upstream 80A0187 PY B-3 UT III 100-SS 80A0183 N/A PT 1-B33-0097 16" x 12" Sweepolet to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0097-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0098 12" Pipe to Elbow 30A0187 P.Y B-3 UT III XXI-SS 80A0133 N/A PT l-B33-0098-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT 1

NES 239 6/82

Systema RR PROGRAM PLAN AND SCHEDULE By:

ih

/\\h\\n Document No. 80A4428 APP:

h

/ /o/h'

~

Preservice Inspection 5532 - PERRY Rev.2 Page 44 of 61 i

COMPONENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (tf apphcable)

CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0098-U Pipe Seam Upstream 10A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0099 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0099-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183' N/A PT l-B33-0099-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0100 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT 1-B33-0100-U Pipe Seam Upstream 80A0187 PY B-3 UT 111 XXI-SS 80A0183 N/A PT l-B33-0102 16" x 12" Sweepolet to 12" Pipe 80A0187 P Y B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0102-D Pipe Seam Downstream 80A0187 PY B-3 UT 111 XXI-SS 80A0183 N/A PT i

NES 239 6/82

Systemi RR PROGRAM PLAN AND SCHEDULE By:

/

Document No. 80A4428 App:

de

/ fo/g

~

Preservice Inspection 5532 - PERRY Rev.2 Page 45 of 61 CAUBRATION CODE IDE T ON DE I

NU B (if a ble)

CA ORY T

NO.

FIEMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 b

1-B33-0103 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0103-D Elbow Seam Downstream 30A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0103-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0104 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0104-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0104-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0105 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0105-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT i

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By: -- @

/ \\%\\t4 Document No. 80A4428 App:

Adot- / /0/p+

~

Preservice Inspection 5532 - PERRY Rev.2 Page 46 of 61 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcable)

CATEGORY METHOO NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 h

1-B33-0107 24" x 16" Cross to 24" x 12" Reducer 80A0187 PY B-3 UT III XX2-SS-F 80A0183 N/A PT l-B33-0108 24" x 12" Reducer to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Reducer Side SWEEP-SS 80A0183 N/A PT l-B33-0108-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0109 12" Pipe to Elbow 30A0187 PY B-3 UT III XX1-SS 80A0183 N/A PT l-B33-0109-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0109-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0110 12" Elbow to Pipe 80A0187 PY B-3 UT 11I XX1-SS 80A0183 N/A PT l-B33-0110-D Pipe Seam Downstream 80A0187 PY B-3 UT III-XXI-SS 80A0183 N/A PT i

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

W

/ \\g\\t4 Document No. 80A4428 App:

e / fo/ g Preservice Inspection 5532 - PERRY Rev.2' Page 47 of 61 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTinCATION DESCRIPTION NUMBER (if applicable)

CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 b

1-B33-0110-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0111 12" Pipe to Nozzle 80A0187 P Y B-3 UT III CLAD-SS 80AOI83 N/A PT l-B33-0111-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0113 16" x 12" Sweepolet to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-0113-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT 1-B33-0114 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A

-PT l-B33-Oll4-D Elbow Seam Downstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-Oll4-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT i

6 NES 239 6/82

B2 N

/ \\M Y

System: RR PRO 2 RAM PLAN AND CCHEDULE Document No. 80A4428 APP: dfm

/ /0/p d Preservice Inspection 5532 - PERRY Rev.2 Page 48 of $1 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD NO.

REMAfES LOOP B PIPING WELDS Ref. Dwg. No. 09-02 b

1-B33-0115 12" Elbow to Pipe 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0115-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0153 N/A PT l-B33-Oll5-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT 1-B33-0116 12" Pipe to Nozzle 80A0187 PY B-3 UT III CLAD-SS 80A0183 N/A PT 1-B33-0116-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0118 16" x 12" Sweepolet to 12" Pipe 80A0187 PY B-3 UT III Pipe Side CLAD-SS 80A0187 PY UT Sweepolet Side SWEEP-SS 80A0183 N/A PT l-B33-Oll8-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0119 12" Pipe to Elbow 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT 4

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

th

/ %M4 Document No. 80A4428 App:

Jum /

to/W Preservice Inspection 5532 - PERRY Rev. 2 ' Page 49 of 61 COMPONENT COMPONENT PROCEDURE OCK CODE ZONE IDENTLFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOD NO REMARKS LOOP B PIPING WELDS Ref. Dwg. No. 09-02 k

1-B33-0119-D Elbow Seam Downstream 80A0187 P Y B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0119-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT l-B33-0120 12" Elbow to Pipe 80A0187 PY B-3 UT III XX1-SS 80A0183 N/A PT l-B33-0120-D Pipe Seam Downstream 80A0187 PY B-3 UT III XXI-SS 80A0183' N/A PT l-B33-0120-U Elbow Seam Upstream 80A0187 PY B-3 UT III 80-SS-F 80A0183 N/A PT l-B33-0121 12 ' Pipe to Nozzle 80A0187 P Y B-3 UT III CLAD-SS 80A0183 N/A PT l-B33-0121-U Pipe Seam Upstream 80A0187 PY B-3 UT III XXI-SS 80A0183 N/A PT i

l NES 239 682

11 ELE System: RR PROGRAM PLAN AND SCHEDULE By:

th

/ Wh4 APP:

A

/ ro/f4 Document No. 80A4428 Preservice Inspection 5532 - PERRY Rev.2' Page 50 of'61 CALIBRATION CODE EDE TION DE I

NU BE (if biel CA ORY T

REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 09-02 1-B33-H305B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-H306B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-S372B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II 1-B33-S373B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II I-B33-5374-B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II 1-B33-S375B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT II 1-B33-5351B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III l-B33-S352B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT III i

NES 239 6/82

B:

N

/ WM4' System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428

<w: ~h

/

/pN+

Preservice Inspection 5532 - PERRY Rev. 2 Page 51 of 61 CAtlBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE tDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No. 09-02 1-B33-5353B-WA Pipe Welded Attachment 80A0183 N/A B-K-1 PT 111 1-B33-S354B-WA Pipe Welded Attachment 30A0183 N/A B-K-1 PT 111 1

4 1

i NES 239 682

System: RR PROGRAM PLAN AND SCHEDULE EY:

N

/ W\\N Preservice Inspection 5532 - PERRY Rev. 2~h / /O M Document No. 80A4428 App:

Page 52 of 61 CALIBRATION CODE COuPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE

0ENTIRCADON DESCRIPTION NUMBER (If apphcablet CATEGORY METHOO NO REMARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 09-01 1-B33-F023A-IS 22" Valve F023A Internal Surface 80A0184 N/A B-M-2 VT-1 II l-B33-F060A-IS 24" Valve F060A Internal Surface 80A0184 N/A B-M-2 VT-1 II h

l-B33-F067A-IS 24" Valve F067A Internal Surface 80A0184 N/A B-M-2 VT-1 II 1-B33-F023A-B 22" Valve F023A Bolting 80A0184 N/A B-G-2 VT-1 II l-B33-F060A-B 24" Valve F060A Bolting 80A0184 N/A B-G-2 VT-1 II l-B33-F067A-B 24" Valve F067A Bolting 80A0184 N/A B-G-2 VT-1 II

[

l-B33-C001 A-IS Pump C001 A Internal Surface 80A0184 N/A B-L-2 VT-1 II NES 239 6/82

System: RR PROGRAM PLAN AND CCHEDULE Cy:

th

/ WM4 Document No. 80A4428 App:

apit.-

/ /o/ 6 Preservice Inspection 5532 - PERRY Rev. 2' Page 53 of 61 COMPONENT COMPONENT PROCEDURE OCK CODE 2ONE IDENTWICATION DESCRIPTION NUMBER (if apphcab.el CATEGORY METHOO NO REMARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 09-02 1-B33-F023B-B 22" Valve F023B Bolting 80A0184 N/A B-G-2 VT-1 II l-B33-F067B-B 24" Valve F067B Bolting 80A0184 N/A B-G-2 VT-1 II

/

8 NES 239 6/82._

i System: RR PROGRAM PLAN AND SCHEDULE Oy:

i&

/ %\\n Rev. ?p / /o/fd.

Document No. 80A4428 App:

Page 54 6f 61 Preservice Inspection 5532 - PERRY CAllORATION CODE M)E TON r DESCR; BE 01 a pl blel CA ORY T

NO RE!4 ARKS BOLTING EXAMINATIONS RR Pump C001 A Ref. Dwg. No. 09-03 k

1-B33-C001 A-1B StJd #001 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-2B Stud #002 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-3B Stud #003 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-4B Stud #004 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001A-5B Stud #005 80A0196 PY-STUD-RR-UT 3-CS~

B-G-1 II 80A0183 N/A PT l-B33-C001 A-6B Stud #006 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-7B Stud #007 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001A-88 Stud #008 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II l

80A0133 N/A PT NES 239 6/82

System: RR PROGRAM PLAN AND CCHEDULE By:

ib

/ %\\d

/ fogg ' '

g 55 Document No. 80A4428 App:

Page

'of ' 61 Preservice Inspection 5532 - PERRY Rev. 2 o Ec oescNTN wuuBE N.

ro4 cA GORY hE REMARKS BOLTING EXAMINATIONS RR Pump C001 A Ref. Dwg. No. 09-03 A

1-B33-C001 A-9B Stud #009 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT 1-B33-C001A-10B Stud #010 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-IIB Stud #011 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-COGI A-12B Stud #012 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001A-13B Stud #013 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-14B Stud #014 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-15B Stud #015 80A0196 PY-STUD-RR-UT 3-CS B-G-1 II 80A0183 N/A PT l-B33-C001 A-16B Stud #016 80A0196 PY-STUD-R R-UT 3-CS B-G-1 II 80A0183 N/A PT NES 239 6,82

System: RR PROGRAM PLAN AND SCHEDULE Er N

/ W\\t4 Document No. 30A4428 App:

h /

fo/N Preservice Inspection 5532 - PERRY Rev. 2 ' Page 56 of 61 o Ecb DE uB CA ME REMARKS BOLTING EXAMINATIONS RR Pump C001 A Ref. Dwg. No. 09-03 1-833-C001 A-IN Hex Nut #001 80A0184 N/A B-G-1 VT-1 11 l-B33-C001 A-2N Hex Nut #002 30A0184 N/A B-G-1 VT-1 11 1-B33-C001 A-3N Hex Nut #003 80A0184 N/A B-G-1 VT-1 II l-B33-C001A-4N Hex Not #004 80A0184 N/A B-G-1 VT-1 II 1-B33-C001A-5N Hex Nut #005 80A0184 N/A B-G-1 VT-1 11 1-B33-C001 A-6N Hex Nut #006 80A0184 N/A B-G-1 VT-1 11 1-B33-C001 A-7N Hex Nut #007 80A0184 N/A B-G-1 VT-1 II 1-B33-C001 A-8N Hex Nut #008 80A0184 N/A B-G-1 VT-1 II P$S 239 682

System: RR PROGRAM PLAN AND SCHEDULE By:

tb

/ \\844 Document No. 30A4423 App: A

/ la/94' Preservice Irwtion 5532 - PERRY Rev.2 Page 57 o'f 61 c EtS S

EBE DE CA Y

ME REMARKS BOLTING EXAMINATIONS RR Pump C001A Ret Dwg. No. 09-03 k

1-833-C001 A-9N Hex Nut #009 80A0184 N/A B-G-1 VT-1 Ill 1-833-C001A-ION Hex Nut #010 80A0184 N/A B-G-1 VT-1 III l-B33-C001A-IIN Hex Nut #011 80A0184 N/A B-G-1 VT-1 III 1-B33-C001 A-12N Hex Nut #012 80A0184 N/A B-G-1 VT-1 III l-B33-C001 A-13N Hex Nut #013 80A0184 N/A B-G-1 VT-1 III l-B33-C001 A-14N Hex Nut #014 80A0184 N/A B-G-1 VT-1 III l-B33-C001A-15N Hex Nut #015 80A0184 N/A B-G-1 VT-1 III 1-B33-C001A-16N Hex Nut #016 80A0184 N/A B-G-1 VT-1 III NES 239 682

System: RO PROGRAM PLAN AND SCHEDULE BY:

t\\\\

/ \\dN Document No. 80A4428 App:

.fAmt

/ /034 Preservice Inspection 5532 - PERRY Rev.2 ~ Page 58 of 61 cAusaAron cooE O EEE DE NUMBE M

w CA GORY T

NO REMARKS BOLTING EXAMINATIONS RR Pump C001B Ref. Dwg. No. 09-04 h

1-B33-C001B-1B Stud #001 80A0184 N/A B-G-1 VT III 1-B33-C0018-2B Stud #002 80A0184 N/A B-G-1 VT III l-B33-C001B-3B Stud #003 80A0184 N/A B-G-1 VT III l-B33-C001B-4B Stud #004 80A0184 N/A B-G-1 VT III 1-B33-C001B-5B Stud #005 30A0184 N/A B-G-1 VT III I-B33-C001B-6B Stud #006 80A0184 N/A B-G-1 VT III l-B33-C001B-7B Stud #007 80A0184 N/A B-G-1 VT III 1-B33-C001B-8B Stud #008 80A0184 N/A B-G-1 VT III NES 239 682

System: RR PROGRAM PLAN AND SCHEDULE By:

in

/ W\\tb Document No. 80A4428 App: damu / /OAp4 '

Preservice Inspection 5532 - PERRY Rev.2' Page 59 of 61 COMPONENT COMPONENT PROCEDURE CODE E

ZONE OENTIFICATION DESCR!PTION NUMBER (if appicautel CATEGORY METHOD NO REMARKS BOLTING EXAMINATIONS RR Pump C001B Ref. Dwg. No. 09-04 h

1-B33-C001B-9B Stud #009 80A0184 N/A B-G-1 VT III 1-B33-C001B-10B Stud #010 80A0184 N/A B-G-1 VT III l-B33-C001B-IIB Stud #011 80A0184 N/A B-G-1 VT III l-B33-C001B-12B Stud #012 80A0184 N/A B-G-1 VT III l-B33-C001B-13B Stud #013 80A0184 N/A B-G-1 VT III I

l-B33-C001B-14B Stud #014 80A0184 N/A B-G-1 VT III 1-B33-C001B-15B Stud #015 80A0184 N/A B-G-1 VT III l-B33-C001B-16B Stud #016 80A0184 N/A B-G-1 VT III B412180472 8415!14 R ADOCK 05000440 NES 239 PDR

B' th

/ %\\tk System: RR PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4428 App:

samu

/ /o/M '

Preservice Inspection 5532 - PERRY Rev.2~ Page 60 of 61

~

o Ecrfon o"c N r 5 wuueYE cA E v ao ut x) wo neuAnxs BOLTING EXAMINATIONS RR Pump C001B Ref. Dwg. No. 09-04 k

1-B33-C001B-IN Hex Nut #001 80A0184 N/A B-G-1 VT-1 III 1-B33-C001B-2N Hex Nut #002 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-3N Hex Nut #003 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-4N Hex Nut #004 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-5N Hex Nut #005 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-6N Hex Nut #006 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-7N Hex Nut #007 30A0184 N/A B-G-1 VT-1 III l-B33-C001B-8N Hex Nut #008 80A0184 N/A B-G-1 VT-1 III i

NES 239 6/82

System: RR PROGRAM PLAN AND SCHEDULE By:

W

/ %\\d Document No. 80A4428 App:

damt.,

/ fo/M' '

Preservice Inspection 5532 - PERRY Rev.2 Page 61 of 61 o EE DESCN$

E8E TON app CA Y

ME REMARKS BOLTING EXAMINATIONS RR Pump C001B Ref. Dwg. No. 09-04 k

1-833-C001B-9N Hex Nut #009 80A0184 N/A B-G-1 VT-1 III 1-B33-C001B-10N Hex Nut #010 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-llN Hex Nut #0ll 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-12N Hex Nut #012 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-13N Hex Nut #013 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-14N Hex Nut #014 80A0184 N/A B-G-1 VT-1 III I-B33-C001B-15N Hex Nut #015 80A0184 N/A B-G-1 VT-1 III l-B33-C001B-16N Hex Nut #016 80A0184 N/A B-G-1 VT-1 III NES 239 682

-- ----------------J

+

80A4429 2

l mr NUCLEAR ENERGY SERVICES, INC.

DOCUMENT NO.

REV.

11 g

4amarer b ee "

I PAGE nF PSI PROGRAM PLAN:

REACTOR WATER CLEAN UP SYSTEM PERRY NUCLEAR POWER PLANT, UNIT 1 Prepared For CLEVELAND ELECTRIC ILLUMINATING COMPANY Pf0 lect Appl 8CJtion CODyNO Assigned IO

$532 APPROVALS TITLE / DEPT.

SIGN ATURE - D ATE REV NO PREP \\ RED BY 151 Programs Project Manager Q.A. Manager Engineering Mgr.

O N-

~

/~

/

2 Susan Meyer jfffJ

/ Gj ujyj",l, Mt% fn n 1011184 Wr/W A

U lo-2+-vy 3

l l

4 i

l 5

  • ~

N I N.. T. R. 1 1_El CLP l

e o

u'u'r T.ti c WT ! d 3 E u

m a

N.

e hl 3- '" "

" ~ ' '

~

9 10 11 FORM e Nes 204 9/84

h gg 8 " *

REVISION L0G NUCLEAR ENERGY SERVICES, INC.

PAGE OF

"*[

DESCRIPTION APPROVAL DATE gg g

A 12/7/83 Thru FR A Nn 1767. Additinn of Cnmnnnent

.m v

f 17 Fvn mina tinns i

h 10/24/84 Revised to incorporate customer comment,

_gA 0

welded attachments and field changes:

10-01 FC #1 through #3, 10-03 FC #1.

CRA #4676 FORM e NES 206 2 80

80A4429 DOCUMENT NO.

11 a nwrer Q:v::---

3 33 GE OF NUCLEAR ENERGY SERVICES TABLE OF CONTENTS Page 1.

INTRODUCTION 4

2.

SYSTEM DESCRIPTION 4

2.1 Exemptions 4

2.2 Exceptions 4

2.3 Classifications 4

2.4 Calibration Standards 7

2.5 Isometric Figures and Sketches 7

3.

PROGRAM PLAN AND SCHEDULE 8

System Classification Figures 9

Weld Map Figures 10 Component Figures 13 Schedule Sheets Piping Welds 15 Schedule Sheets Component Examinations 32 Tables 2.1 System Exemptions 5

2.2 System Exceptions (provided later)--

2.3 System Classifications 6

2.4 System Referenced Calibration Standards 7

2.5 System Isometric Figures 7

1

~

F JAM s NES 205 2/80

30A4429 DOCUMENT NO.

my

_g, NUCLEAR ENERGY SERVICES 1

l REACTOR WATER CLEAN UP SYSTEM

1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice Inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. All components in the Reactor Water Clean Up (RWCU) System required to be examined by ASME BPV Code,Section XI, are included.

The General Reference Text, NES Document 80A4420 presents the development and required procedural information for the PSI Program Plan generic to all systems examined.

2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS The portions of the RWCU System that are exempted from examination as allowed by ASME BPV Code Section XI, and as described in the General Reference Text, are presented in Table 2.1 2.2 EXCEPTIONS Exception may be taken to code requirements of examination where access is not possible due to design limitations. Provision for such exception is presented in the General Reference Text. Exceptions that are taken to required exams of the RWCU System are itemized in Table 2.2 (Later).

2.3 CLASSIFICATIONS This system's piping and instrumentation diagrams have been reviewed and Quality Group A, B, and C (ASME Code Class 1, 2, and 3) boundaries have been established as required by ASME Code Section XI, IWA-1400. The General Reference Text discusses the basis for these determinations.

Diagrams delineating these boundaries for the RWCU System are presented in Figure B-10. RWCU System classification and boundaries are presented in Table 2.3 roqu a NES 205 2c80

80A4429 DOCUMENT NO.

NUCLEAR ENERGY SERVICES TABLE 2.1 SYSTEM EXEMPTIONS I

ASME Code Basis For Class Description Ref. P&ID Exemption I

l-1/2" Bypass Line D-302-All components less for Valve F101 671-Rev D than 2.36" ID for water service are exempted per 'ASME'Section XI subparagraph IWB-1220(a), based on exclusion diameter for normal makeup.

I 2" Dl-1 from 3" x 2" D-302 All components less Reducer up to the 671-Rev D than 2.36"ID for water Reactor Recirculation service are exempted Intertie per 'ASME'Section XI subparagraph IWB-1220(a), based on exclusion diameter for normal makeup.

1 All pipings of 1 in.

D-302 All component con-nominal size and 671-Rev D nections, pipings and smaller associated valves of 1 in, nominal size and smaller are exempt per IWB-1220(b).

2 All pipings of 4 in.

D-302 All component. con-nominal size and 672-Rev D nections, pipings and smaller associated valves that are 4 In. nominal size and smaller are exempt per IWC-1220(c).

i FOAM a NES 205 2,80

80A4429 DCCUMENT NO.

GE OF

"=

NUCLEAR ENERGY SERVICES

[f_\\

TABLE 2.3 SYSTEM CLASSIFICATIONS ASME Code 1

Class Description Ref. P&ID 1

6" Dl-1 from Valve F004 D-302-671 Rev D through penetration P-131 including Valve F001 up to 6" x 4" reducer 1

4" Dl-1 from Valve F106 up D-302-671 Rev D to Valve F100 including Valve F102 1

3" Dl-1 from 6" x 3" Reducer D-302-671 Rev D to 3" x 2" Reducer including Valve F103 2

6" Dl-2 from Valve F040 through D-302-671 Rev D Penetration P-132 including Valves F051 A, B and F052A, B up to the 12" RHR intertie.

I l

h FORM s NES 205 2:80

80A4429 DOCUMENT NO. _

a ameror Scene 7

33 NUCLEAR ENERGY SERVICES 2.4 CALIBRATION STANDARDS Table 2.4 lists the Calibration Standards for ultrasonic examinations scheduled for the RWCU System. All calibration standards are to be retained on site.

Design drawing documents are presented in Table 3.5 of the General Reference Text.(Later)

TABLE 2.4 RWCU System: Referenced Calibration Standards Title Line Class Schedule Material PY-4-80-CS 4" Dl-1 Sch-80 SA106 Grade B PY-4-XXI-CS-F 4" Dl-1 Sch-80 SA234 Grade WPB PY-6-80-CS 6" Dl-1 Sch-80 SA106 Grade B PY-6-120-CS 6" Dl-2 Sch-120 SA106 Grade B PY-6-XXI-CS-F 6" Dl-2 Sch-120 SA234 Grade WPB k

PY-Valve-XX2-CS 1.531" SA 105 PY-Valve-XX3-CS 1.148" SA 105 2.5 ISOMETRIC FIGURES AND SKETCHES The piping Isometric and component figures listed in Table 2.5 show the identification and location of areas for the RWCU System requiring examination.

Sketches may also be included that illustrate or locate areas of components requiring Identification for examination.

TABLE 2.5 RWCU System Isometric / Component Figures 10-01 Revision 1 10-02 Revision 1 10-03 Revision 1 10-04 Revision 0 10-05 Revision 0 i

i QRM e NES 205 2:80

80A4429 DOCUMENT NO.

PAGE OF i

NUCLEAR ENERGY SERVICES

3. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.

Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, any calibration standard number referenced for ultrasonic examination, and the zone in which the examination area is located, as described in Section 3 of the General Reference Text.

Examination items are first divided according to the weld or hanger isometric figure that they appear on. Multiple examination requirements of the same component are listed separate in the schedule tables. Component examinations or component bolting follow the piping weld examinations for each system. Hanger examinations appear as the next section, followed by the hydrovisual examination requirements.

N FCRM s.NES 205 2/80 s

DOCUMENT NO. JOAM 29 e.a - 9 o,33 i

040 039 FOSI B

TO g

REGEttJtEAT 6

u.

g

/

EXCHANGER

-- ^

+

HIS s'

\\)h__/

{)

X 052 2" B-33 FOSI REORC B REORCs A A

B FIG B-3 1

FIG. B-3 052 oa

,6 3-A 4

G 33 CONT. FIG.

106 B-6 B-5 i

l' 4

REFERENCES CCHTAINMENT ->

3-g ORYWELL 0-304-671 REV-0 0-304 -672 REV-D 3

FOO 10 2

-- 6' tlRWCU 9 Q-~.

2 33 Su m sso sN:

OOL POOL SYSTEM QAS9FICATO'l G-33 RWCU aav: O

  • = =

B-10 ev TEM o.za f.12.-ff2-6ROUP A Q,uts o.ra 2-25-82 enem GROUP 8 PERRY-5532 ses to scas

  1. OHM e itS226-980 8

m

~

b

'd b

h k

.hh l

Sk a

6 E

l o o

S

'b se I s sie?; lI j j.

i a

g i i _!

gr 90 I Se e

adM C).

-4 1 9 M 3 t-n-N 9

5

/

ig s.o g i

d,idh!f, !=$s e s u -

>l,9 i

l vi e

t e

mW 122 "

e ns t 5

6=1 ar 99lU$

6 I

}

i

$$j04 o

S

.t #sef.it l l f h

y a

c f

g 3

o O

CX y

E E

cc o

9 r

m, W

3 M a g

8 8 9

i--

s 8 8

.. s Bi r

8 o

r o

C N m

o N

0 m o

o

=N J T

8 0

in tn e g g g g ;8 8

0 7

_ g n\\ $2 v-

.o d>Li;s A1

+

2

.- I f*4 1

,1 8

m

  1. e 2

\\

6 e

p g

l k

s 9

g y

re-o

?

T-o, a

N g

.g'kbb Y

C

_ T 8 8 7

y

'a y-

  1. [

'\\

I 4

9 y

e s

8

._1

\\

s

~

~

h YhN

\\

E 8

.c 9 N

w Ba

>7~A 2

t i.

H I

a

[

l e

E E

~

uh !

k d

I

=

g3 l yc o fi l l 29 E

d~

li '* f n'

!$ h k

h 1

3 gl ;=

97 f

W I

s m

I s

_o!

E b$

T.

g/

2 *I 5 5 i

e

../

o.

i On y

3 g

a

  1. , 1 gel e

y tge

.L

~ n o

8 5 dig j

\\s g-c y

g u

b_

3 g

x3 L^ $

L hd l

- l 8 8 s~

e

~

r 5

(

~5l /

I 8

~

-~

ji l

k E

l

'o

/D

~

g 1

ao

_\\.l a

1 e

0

~

0 s

!6 8 6

4 0 o W.

M' y

6 h

k T 5

- j

${

j

)

T 1

ge

,7 a na

.e

~

1

/

g h

S b N O

6 8 '$c 8

pe.

8 8 8 5

6

\\

p 4'f I

Pg

-1 5

0 6

E

~

l s

oocuussino. 60A4429 12, 33 ac, QLO A

CONT. ON RHR FIG. 03-12 x

JV y

~

siM eam m

car. On a 6

A FIG. 03-05

},T, '

F039 N

th

'x 6* '

6 6'

's

- (3gg]

9p'b M

9@Wr

's(3gyj;3 6"

N FOSI FOS 2

,NN. \\ggg-)

. ~{3HE;3 A

B F040 033D

~

6'O REFrwGS f'E FOSI PULLMAN KELLOGG

[0Q2 A A

l-G33-12 REV. 7 g

l-G33-8 REV.9

< m NOTE:

Q{% -

N ALL PIPING & VALVE NOS. ARE PRECEEDED BY l-G33-FOR FE COMR SYSTEM IDENTIFICATION.

040 GmD 8'ga' RWCU

'"L8 b

G33 WELD MAP

,4 aev i

.. ol0-03 CONT ON ev:TE.W oars %-81 POINT *A*

a-J-S oare s-23-32

" 5532-PERRY UNIT I nor to ocas FOFud e NES 220-5/80 4

m DOCUMENT NO.

80A4429 11 M

PAGE 13 op NUCLEAR ENERGY SERVICES, INC.

i Y j

,b A

n. e

/

/

I

/

/

f

/

g 7

/

/

I i

I

, 7

$f

$)

5A /h 1-G33-FOO1-IS y

I

-l r

lp 1-G33-FOO1-SEAM

^

n p_a; _..._...._.

HRE 8'MEu RWCU 6" GATE REF. DWGS.

G33 VALVE FOO1 S

M WATION BORG WARNER DWG. NO. 81204 a

is a

.1 81200-2

"'V:

I' ".". 10-04 GAI DWG. NO. 4549-40-364-1-4 ov: @

orre% B%

^

w 4549-40-362-1-5

^m A M n.

o^re //3't

~

c PERRY UNIT 1 NOT TO SCAtt FORM # NES 205 2/80

DOCUMENT NO.

80A4429 PAGE OF 33 NUCLEAR ENERGY SERVICES, INC.

=

l V~

V

/,

l 3

NOTE: WELD IDENTIFICATION e

NUMBER FOR IDENTICAL

/

/

VALVES F101 :

k 1-G33-F101-SEAM B

- -@ i' l

f f

tt P

    1. W 1-G33-F100-IS l

N

-l

/

1-G33-F100-SEAM

~

L_

b W/D 7///A' u

n p q _............

HRE 8'SEM RWCU GATE VALVES REF. DWGS.

4*F10'O & 3*F101 G33 CORG WARNER DWG. NO. 81190-1 SEAM' LOCATION i,

81180 REY: l no. NO.10-05 gal DWG. NO. 4549-40-360-1-3 ev: v's oats:slu/es a

a a

4549-40-344-4-7 am. @

04re:to/og/83 CLASS 1 PERRY UNIT 1 NOT TO SCALE l

FORM 4 NES 205 2/80 l

B:

/

Y System: RWCU PROGRAM PLAN AND CCHEDULE Document No. 80A4429 APP:

h

/ 4/M.

~

Preservice Inspection 5532 - PERRY Rev. 2 Page 15 of 33 o EcTUca oesc E EsY cA E Y ME C REMARKS PIPING WELDS Ref. Dwg.10-01 1-G33-0072 4" Pipe to Elbow 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0071 4" Elbow to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0070 4" Pipe to Elbow 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0069 4" Elbow to Valve F102 80A0186 PY-4 B-3 UT II XXI-CS-F 80A0183 N/A PT l-G33-0068 4" Valve F102 to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0067A 4" Pipe to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0067 4" Pipe to Reducer 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0066 4" x 6" Reducer to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT NES 239 &82

B:

N

/ M4 Systems RWCU PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4429 APP:

h

/ 9 /f+

Preservice Inspection 5532 - PERRY Rev. 2 Page 16 of 33 CALIBRATION CODE OE DESCRI NUMBE Uf appt.abiel CA GORY NO REMARKS PIPING WELDS Ref. Dwg.10-01 1-G33-0065 6" Pipe to Tee 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0051 6" x 6" Tee to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0052 6" Pipe to Flow Element FE NO35 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0053 6" Flow Element FE-NO35 to Pipe 30A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0054 6" Pipe to Elbow 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0055 6" Elbow to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0056 6" Pipe to Elbow 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT 1-G33-0057 6" Elbow to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT NEd 239 6/82

V systems ROCu PROGRAM PLAN AND SCHEDULE By:

tts

/ %\\14 Document No. 80A4429 App: Aw

/ 7/ft Preservice Inspection 5532 - PERRY Rev. 2 Page 17 of 33 Call 8 RATION CODE IDE ICAT DE NU BE (if a ble)

CA ORY T

REMARKS PIPING WELDS Ref. Dwg. No.10-01 1-G33-0058 6" Pipe to Elbow 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-Q059 6" Elbow to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0060 6" Pipe to Valve F001 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0061 6" Valve F001 to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0062 6" Pipe to Penetration P131 Process Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0063 6" Penetration P131 Process Pipe to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0064 6" Pipe to Valve F004 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT 1-G33-0050 6" x 6" Tee to Pipe 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT NES 239 6/82

B8 O

/ Mti System: ROCU PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4429 App:

h

/ q/s+

5 Preservice Inspection 5532 - PERRY Rev. 21 age 18 of 33 CAUBRATK)N CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appleable)

CATEGORY METHOO NO REMARKS PIPING WELDS Ref. Dwg. No.10-01 1-G73-0049 6" Pipe to Reducer 80A0186 PY-6 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0048 6" x 3" Reducer to Pipe 80A0183 N/A B-3 PT II l-G33-0047 3" Pipe to Elbor 80A0183 N/A B-3 PT II l-G33-0046 3" Elbow to Pipe 80A0183 N/A B-3 PT II l-G33-0045 3" Pipe to Elbow 80A0183 N/A B-3 PT II l-G33-0044 3" Elbow to Pipe 80A0183 N/A B-3 PT II l-G33-0043 3" Pipe to Elbow 80A0183 N/A B-3 PT II l-G33-0042 3" Elbow to Pipe 80A0183 N/A B-3 PT II NEd 239 6/82

~

B:

N

/ '\\kT t(-

Systems RCCU PROGRAM PLAN AND CCHEDULE Y

Document No. 80A4429 App:

h

/ 9/M-Preservice Inspection 5532 - PERRY Rev. 2 Page 19 of 33 CALIBRAT!ON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFICATON DESCRIPTION NUMBER (ff apphcablel CATEGORY METHOO NO.

REMARKS PIPING WELDS Ref. Dwg. No.10-01 1-G33-0041 3" Pipe to Tee 80A0183 N/A B-3 PT II l-G33-0034 3"x 3" x l-1/2" Tee to Pipe 80A0183 N/A B-3 PT II 1-G33-0033 3" Pipe to Valve F101 80A0183 N/A B-3 PT II l-G33-0032 3" Valve F101 to Pipe 80A0183 N/A B-3 PT II l-G33-0031 3" Pipe to Elbow 80A0183 N/A B-3 PT II l-G33-0030 3" Elbow to Pipe 80A0183 N/A B-3 PT II l-G33-0029 3" Pipe to Tee 80A0183 N/A B-3 PT II l-G33-0028 3" x 3" x l-1/2" Tee to Pipe 80A0183 N/A B-3 PT II neb 239 6/82

B' O

I Systemi RCCU PROGRAM PLAN AND CCHEDULE Y

Document No. 80A4429 APP: Ah

/ 4/M Preservice Inspection 5532 - PERRY Rev. 2 Page 20 of 33 CAL 18RATON CODE COMP 0NENT CCMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENTIFIC % TION DESCRIPTION NUMBER (if apphcaW CATEGORY METHOO NO.

REMARKS PIPING WELDS Ref. Dwg. No.10-01 1-G33-0027 3" Pipe to 3" x 2" Reducer 80A0183 N/A B-3 PT II t

e NES 239 6/82

System: RWCU PROGRAM PLAN AND SCHEDULE By:

th

/ %\\t4 Document No. 80A4429 APP:

he

/ 4/M Preservice Inspection 5532 - PERRY Rev. 2 Page 21 of 33 CAttBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBCR (if apphcable)

CATEGOR)

METHOD NO REMARKS WELDED ATTACHMENTS Ref. Dwg. No.10-01 1-G33-H080-WA Pipe Welded Attachment 30A0183 N/A B-K-1 PT II w

f NES 239 6/82

l Systema RWCU PROGRAM PLAN AND SCHEDULE B:

N

/ %kN Y

Document No. 80A4429 APP: Ah

/ 4/gp l

Preservice inspection 5532 - PERRY Rev. 2 Page 22 of 33 i

l CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)

CATEGORY METHOD No.

REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-Oll3 4" Weldolet to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0112 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-Olli 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0110 4 Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0109 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0108 4" Pipe to Valve F100 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0107 4" Valve F100 to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0106 4" Pipe to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT neb 239 6tB2

System: RWcu PROGRAM PLAN AND SCHEDULE Bys tin

/

'\\\\14.

j Document No. 80A4429 APP:

h

/ 9/94 l

Preservice Inspection

$532 - PERRY Rev. 2 Page 23 of 33 l

COMPONENT PROCEDURE B

CODE 20NE COMPONENT OENTIFICATON DESCRIPTION NUMBER (11 apphcable)

CATEGORY METHOD NO.

REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-0105 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0104 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0103 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A FT l-G33-0102 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0101 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0100 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0099 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0098 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT NES 239 6/82

B3 Ib

/

S\\N System: RWCU PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4429 APP:

h

/ 4/f4 Preservice Inspection 5532 - PERRY Rev. 2 Page 24 of 33 l

CAllBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTON NUMBER (If appim CATEGORY METHOD No REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-0097 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0096 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0095 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT 1-G33-0094 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0093 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0092 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0091 4" Pipe to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0090 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT neb 239 6/82

System: RCCU PROGRAM PLAN AND SCHEDULE By:

4

/

'N\\t 4 -

Document No. 80A4429 APP:

um / <f/Ff 5

Preservice Inspection 5532 - PERRY Rev. 21 age 25 of 33 CALIBRATION CODE IDE ICATK)N DESCRI BE (11 appe ble)

CA GORY No REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-0089 4" Elbow to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0088 4" Pipe to Tee 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0076 4" x 4" Tee to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0077 4" Pipe to Elbow 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0078 4" Elbow to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0079 4" Pipe to Elbow 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-080 4" Elbow to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT l-G33-0081 4" Pipe to Valve F106 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT NEk 239 6/82

System: RUCU PROGRAM PLAN AND SCHEDULE By2 th

/ %\\%

l A p: h

/ q/g4 Document No. 80A4429 P

Preservice Inspection 5532 - PERRY Rev. 2 Page 26 of 33 OSEFYTf0N DESC BE CA ORY ME NO REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-0082 4" Valve F106 to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0083 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0084 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0085 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0086 4" Elbow to Pipe 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0087 4" Pipe to Weldolet 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT l-G33-0075 4" x 4" Tee to Pipe 80A0186 PY-4 B-3 UT IV 80-CS I

80A0183 N/A PT l-G33-0074 4" Pipe to Elbow 80A0186 PY-4 B-3 UT IV 80-CS 80A0183 N/A PT NES 239 6/82

/ %\\M system: RWcu PROGRAM PLAN AND SCHEDULE By:. Ah

/ 9/ft Document No. 80A4429 APP:

Preservice Inspection 5532 - PERRY Rev. 2 Page 27 of 33 couPONENT COMPONENT PROCEDURE BLO CODE ZONE OENTIFICATION DESCRIPTION NUMBER (if apphcablel CATEGORY METHOD NO REMARKS PIPING WELDS Ref. Dwg. No.10-02 1-G33-0073 4" Elbow to Pipe 80A0186 PY-4 B-3 UT II 80-CS 80A0183 N/A PT neb 239 6/82

11EN B8

/ % \\t4 System: ROCU PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4429 APP:

h

/ 9/k '

Preservice Inspection 5532 - PERRY Rev. 2 Page 28 of 3'3 o EcTE o EcS YousYc cA E Y ME HOD No REMARKS PIPING WELDS Ref. Dwg. No.10-03 1-G33-0143 6" Weldolet to Elbow 80A0168 PY-6 C-F UT XI XXI-CS-F 80A0183 N/A PT l-G33-0142 6" Elbow to Pipe 80A0186 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0141 6" Pipe to Elbow 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0140 6" Elbow to Pipe 80A0186 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0139 6" Pipe to Valve F052B 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-Ol?8 6" Valve F052B to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0137 6" Pipe to Elbow 80A0186 PY C-F UT XI 120-CS 80A0183 N/A P,T l-G33-0136 6" Elbow to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT NEd 239 6/82

System: RTCU PROGRAM PLAN AND SCHEDULE By:

W

/ S\\%

Document No. 80A4429 App: Mm

/ '//ft Preservice Inspection 5532 - PERRY Rev. 2 Page 29 of 33

~

imYrYr.m DESCYR EBYE CAEGORY m

b ME No REnaARKS PIPING WELDS Ref. Dwg. No.10-03 1-G33-0135 6" Pipe to Elbow 80A0168 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0134 6" Elbow to Valve F051B 80A0186 PY C-F UT XI XXI-CS-F 80A0183 N/A PT l-G33-0133 6" Valve F051B to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0132A 6" Pipe to Pipe 80A0186 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0132 6" Pipe to Tee aoA0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0122 6" x 6" x 6" Tee to Valve F051 A 83A0802 P Y C-F UT XI X XI-CS-F 80A0183 N/A PT l-G33-0123 6" Valve F051 A to Pipe 80A0186 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0124 6" Pipe to Elbow 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT NES 239 6/82

B:

- ID

/

%\\ N -

S em: RWCU PROGRAM PLAN AND SCHEDULE Y

t No. 80A4429 APP: AAm.

/ 4/k Preservice Inspection 5532 - PERRY Rev. 2 Page 30 of 33 O EE*

TON DES b

CA Y

ME No REMARKS PIPING WELDS Ref. Dwg. No.10-03 1-G33-0125 6" Elbow to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0126 6" Pipe to Valve F052A 80A0168 P Y C-F UT XI 120-CS 80A0183 N/A PT I-G33-0127 6" Valve F052A to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0128 6" Pipe to Elbow 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0129 6" Elbow to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0130 6" Pipe to Elbow 80A0186 PY -

C-F UT XI 120-CS 80A0183 N/A PT l-G33-0131 6" Elbow to Weldolet 80A0186 PY C-F UT XI XXI-CS-F 80A0183 N/A PT l-G33-0121 6" x 6" x 6" Tee to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT NES 239 6/82

B:

/ %\\14 -

System: RUCu PROGRAM PLAN AND SCHEDULE Y

Document No. 80A4429 APP:

id4w / 4/9+

Preservice Inspection 5532 - PERRY Rev. 2 Page 31 of 33 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM 2ONE lOENTIFICATION DESCRIPTION NUMBER Uf apphcable)

CATEGORY METHOO PO REMARKS PIPING WELDS Ref. Dwg. No.10-03 1-G33-0120 6" Pipe to Elbow 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0119 6" Elbow to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT 1-G33-Oll8 6" Pipe to Flange FE N040 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-0117 6" Flange FE N040 to Pipe 80A0186 PY C-F UT XI 120-CS 80A0183 N/A PT l-G33-Oll6 6" Pipe to Valve F039 80A0186 P Y C-F UT XI 120-CS 80A0183 N/A PT l-G33-0115 6" Vlave F039 to Penetration 80A0186 PY C-F UT XI Process Pipe 120-CS 80A0183 N/A PT

'i 1-G33-Oll4 6" Penetration Process Pipe 80A0186 PY C-F UT XI to Valve F040 120-CS 80A0183 N/A PT NES 239 682

n95 System: RCCU PROGRAM PLAN AND CCHEDULE By:

t_h

/ '\\\\14 Document No. K0A4429 App:

JA w

/ 9/ff Preservice Inspection 5532 - PERRY Rev. 2 Page 32 of 33 cAusaAnON CODE IDENT TlON DESCR1 NUMBE Of best CA GORY NO REMARKS COMPONENT EXAMINATION Ref. Dwg. No. 10-01, 10-04 1-G33-F001-SEAM 6" Valve G33-F001 Body Weld 80A0193 PY-Valve-B-M-1 UT II XX2-CS 80A0183 N/A PT 1-G33-F001-IS 6" Valve G33-F001 Internal Surface 80A0184 N/A B-M-2 VT-1 11 1-G33-F101-SEAM 3" Valve G33-F101 Body Weld 80A0193 PY-Valve-B-M-1' UT IV XX3-CS 80A0183 N/A PT i

NE$ 239 662

System: RWCU PROGRAM PLAN AND SCHEDULE By:

/

%\\tk -

Document No. 80A4429 APP:

h

/ Q /2+

Preservice Ir.spection 5532 - PERRY Rev. 2 Page 33 of 33 CAUBRAT@

CODE IDE TK)N DESCA BE Of appleabiel CA ORY THOO NO RE m S COMPONENT EXAMINATION Ref. Dwg. No. 10-02, 10-05 1-G33-F100-SEAM 4" Valve G33-F100 Body Weld 80A0193 PY-Valve-B-M-1 UT IV 2-XX3-CS 80A0183 N/A PT l-G33-FIOO-IS 4" Valve G33-F100 Internal Surface 80A0184 N/A B-M-2 VT-1 IV NEd 239 &82