{{#Wiki_filter:M NUCLEAR ENERGY SERVICES, INC. DOCUMENT NO _ 30A4427 REV. 2 11 I nF 48 W d WN PAGE PSI PROGRAM PLAN: MAIN STEAM SYSTEM PERRY NUCLEAR POWER PLANT, UNIT 1 Prepared For CLEVELAND ELECTRIC ILLUMINATING COMPANY $.Y01TR)LLED30PY VALD OLY J THiS STAMP S RED Project Application Copy No Assigned To 5532 APPROVALS TITLE / DEPT. - SIGN ATURE - D ATE REV NO PREPARED BY ISI Program Project Mgr. Q.A. Mgr. Engineering Mer. ~ 0 X~~ N /' 7 - // 2 Susan Meyer ff,6 G ~ / g,g/W ,/ M % 4" m 10/1/84 m/22/w J 'u ~i&B + 3 [ 4 5 t 7 8412180456 841214 gDRADOCK 05000440 8 PDR 9 10 11 i FORM # NES 204 9/84
r 1 30A4427 """ "o-ggg REVISION LOG PAGE OF,, NUCLEAR ENERGY SERVICES, INC. "^[ AE ' DATE DESCRIPTION APPROVAL g yO d 12/2/83 CRA #3760 { v / \\ Addition of Component Examinations v k 10/24/84 All Revised to incorporate field changes, d fl 7! cid L customer comments, and addition of / welded attachments. CRA #4679 FC's 08-01 #1 thru #8 08-02 #1 thru #10 9 FORM # NES 2062 80
80A4427 DOCUMENT NO. A nmarw &m 11 3 48 PAGE OF NUCLEAR ENERGY SERVICES TABLE OF CONTENTS PAGE 1. INTRODUCTION 4 2. SYSTEM DESCRIPTION 4 2.1 Exemptions 4 2.2 Exceptions 4 2.3 Classifications 4 2.4 Calibration Standards 7 2.5 Isometric Figures and Sketches 7 3. PROGRAM PLAN AND SCHEDULE 8 System Classification Figure 9 Weld Map Figures 10 Component Figures 12 Schedule Sheets Piping Welds and Welded Attachments 14 Schedule Sheets Component Examinations 38 Tables 2.1 System Exemptions 5 2.2 System Exceptions (provided later) 2.3 System Classifications 6 2.4 System Referenced Calibration Standards 7 2.5 System Isometric Figures 7 l 1 F JAM s NES 205 2/80
80A4427 DOCUMENT NO. 4 OF NUCLEAR ENERGY SERVICES MAIN STEAM SYSTEM
- 1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice Inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. All components in the Main Steam (MS) System required to be examined by ASME BPV Code, Section XI, are included.
The General Reference Text, NES Document 80A4420 presents the development and required procedural information for the PSI Program Plan generic to all systems examined.
- 2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS The portions of the MS System that are exempted from examination as allowed by ASME BPV Code Section XI, and as described in the General Reference Text, are presented in Table 2.1.
2.2 EXCEPTIONS Exception may be taken to code requirements of examination where access is not possible due to design limitations. Provision for such exception is presented in the General Reference Text. Exceptions that are taken to required exams of the Main Steam System are itemized in Table 2.2 (Provided Later). 2.3 CLASSIFICATIONS This system's piping and instrumentation diagrams have been reviewed and Quality Group A, B, and C (ASME Code Class 1, 2, and 3) boundaries have been established as required by ASME Code Section XI, IWA-1400. The General l Reference Text discusses the basis for these determinations. Diagrams delineating these boundaries for the Mair. Steam System are presented in Figure B-1. Main Steam System classification and boundaries are presented in Table 2.3. l F JtM 8 NES 205 2/80
80A4427 DOCUMENT NO. 11 PAGE OF W NUCLEAR ENERGY SERVICES TABLE 2.1 f SYSTEM EXEMPTIONS ASME Code Basis For Class Description Ref. P&ID Exemption 1 2" Dl-1 Vent line from D-302-All components less 26" Dl-1 up to and 605/A than 2.36"ID for water including valves B21-service are exempted F002 & B21-F005 per ASME Section XI subparagraph IWB-1220(a), based on exclusion diameter for normal makeup. I 2" Dl-1 & 3" D1-1 D-302 All components less MS Isolation Valve 121/D than 2.36" ID for water Leakage Control service and 4.72"ID for (MSIVLC) lines from steam service are exempted per ASME Section XI subparagraph IWB-1220(a), based on exclusion diameter for l normal makeup. I 2" Dl-1 & 1-1/2" Dl-1 D-302 All components less MSIVLC lines from 121/D than 2.36" ID for Isolation Valves water service and 4.72" B21-F028 A through D ID for steam service and 1-1/2" Dl-1 Drain are exempted per Lines up to Valves ASME Section XI E32-F001 A through D Subparagraph IWB-1220(a), based on exclusion diameter for l normal makeup. 1 All component con-D-302-Piping 1" nominal size nections, piping and 605/A and smaller exempted associated valves of D-302-as per ASME Section XI l 1" nominal size and 121/D Code IWB-1220(b) smaller S'78 Addenda. 2 All vent, drain, test, D-302-All component Connec-sample, fill, by-pass 121/D tions, piping & assoc-and instrument connec-lated valves, and tions 4" nominal size vessels (and their or smaller supports) that are 4" nominal pipe size & smaller are exempted as per ASME Section XI, IWC-1220(d) S '75 Addenda. f JRM 8 NES 205 2/80
80A4427 DOCUMENT NO PAGE OF NUCLEAR ENERGY SERVICES TABLE 2.3 SYSTEM CLASSIFICATIONS ASME Code Class Description Ref. P&lD 1 26" D2-1 Steam Lines from GE-762 Reactor Pressure Vessel E-829 through Valves B21-F022 A through D and "r to Isolation Valves 621-F028 A through D 2 26" D1-2 from Isolation Valves D-302-B21-F028 A through D & up to 605/B Valves B21-F020 A through D F JAM sNES 205 2/80
80A4427 DOCUMENT NO. m g 11 NE OF W NUCLEAR ENERGY SERVICES 2.4 CALIBRATION STANDARDS Table 2.4 lists the Calibration Standards for ultrasonic examinations scheduled for the Main Steam System. All calibration standards are to be retained on site. Design drawing documents are presented in Table 3.5 of the General Reference Text (Provided Later). TABLE 2.4 System Referenced Calibration Standards Title Line Class Schedule Material PY-26-XXI-CS 26" G001 Later SA 155 KCF 70 CLI PY-26-80-CS 26" Dl-1 Sch-80 SA 106 Grade B PY-28-140-CS 2S" Dl-2 SCH-140 SA 155 KCF 70 P Y-10-XX2-CS 10" Dl-1 Later SA 105 PY-STUD-MS-2.25-CS 2.25"$ SA 194 2.5 ISOMETRIC FIGURES AND SKETCHES The piping isometric and component figures listed in Table 2.5 show the identification and location of areas for the Main Steam System requiring examination. Sketches may also be included that. illustrate or locate areas of components requiring identification for examination. TABLE 2.5 System Isometric / Component Figures 08-01 Revision 1 08-02 Revision 1 08-03 Revision 0 08-04 Revision 0 F JAM 8NES 205 2/80
80A4427 DOCUMENT NO. A smoror &come 11 8 48 MGE OF NUCLEAR ENERGY SERVICES
- 3. PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the PSI Program Plan and its schedule tables.
Each weld or other examination area is designated by a unique identification number, and then described. Also identified are applicable examination category, method, procedure number, any calibration standard number referenced for i ultrasonic examination, and the zone in which the examination area is located, as described in Section 3 of the General Reference Text. Examination items are first divided according to the weld or hanger isometric figure that they appear on. Multiple examination requirements nf the same component are listed separate in the schedule tables. Component examinations and component bolting follow the piping weld examinations for each system. Hanger examinations appear as the next section, followed by the hydrovisual examination requirements. l FOAM 8NES 205 2/80
1 mggy no,80 A4427 PAGE OF A THW D 2' CONTAINMENT A RU D NB 0 21 /821 ATHRUD FT8 IF020 2 A THRU D I, I T I LINE A 26" ha j jj A THRU D ~ Q 2" LINE B 126 IA' Me 2" .. le x x B21 r N3C ] 001 dL f l ive-3 i W. REACTOR - LINE D I?6*- 28" VESSEL N3D 2" 3 a=* lW ] II2 74 f 3" / ~ q E FO r n a s._.__=_
- E NTEM CLASSIFICATION REE DRWGS.
821 MAIN STEAM NOTER FOR CLARlTY EXEMPT D-302-605/B VENTS & DRAINS ARE NOT SHOWN D-302-121/D e0 .. no. B-i D-302-341 .c h, urit.qgi -au - D /D wJano art el82.
==== N C D-302' -342 " PERRY-5532 GE-762-E-829 ,,o - FC'tA 8 NES 226-5/80 i O
DOCUMENT NO. $3A 4 27 PAG ( IO Of kR (o)g ,y [gJji], REACTOR M 9 \\ N3C g \\,s g3 q{g3[ N3A \\ '[ E}- \\ 026+ '~ P f 6,f-2 21 s IWOD)~ yQ p [CW 21% D < H cegoigg f 26 [IC12 E21 a $z W . 02V j , b RCic 06-01 ( COf JT. ON g ,g, is @zzo-w9 looo31 @ q 6 @[0] s [OI M - @ -{Ct 29] r 5 [O127. U D / '8 5 bkN! hD.- ^ i V B21 o s / [ 016 ] rO20C 10:27 h, / N (GiOIA-w4 ? p%. .,e g1/ b 9 L6rasi rO2O gj2Aj (GIOtC-v4, N O N ~ E f6I23(U --]I3] o - FO m.. 1 01221 @ @ gig gs MN REF. GE-762 E S29 x /gg 4, PEr.e x-i-nii -iq/s s IOo241 Sti Cd REF.Rik 1-tall-20s/7A [m22N '\\ f O / ro22c ' o' M e n e _q._._._. m2, -055i11 Rg 1GE. ALL RPING & VALVE ...r. rince -l 00111 NUMBERS ARE PRECEDED BY [g$ 6dfp* l _201-HNW o\\ BY l-821. FOR COMPLETE E.___d -U SYSTEM IUCNTIFICATION "'" I '* 'e 0 8 -ot W
- ^ 7Mildi gt 631'.5" M
see 4 aareeps/w b@ "cac' 55M-PERRY UfliT I act to scas Formae NES 226-5/80 i
DOCUe4ENT NO. 03I 442 7 eace 11 o,_48 S 22 ..d e ' g .s 03@' gop m381(5) F033D 'g 's g /' L@_M9 msH s M D REACTOR VESSEL (H222 m4 (foo511 ~ 1- -i EL G42'-d' @. _] o_ p Icced@@ <d's 6 i en-B. >-ge.iig @ Bil H 2 2i-wA) 634,s\\ 6 9 028P CV 10049 @ - E g Lx sl-- M e2;e <[ ,f j r /s l-e m 1 x (csoso-we pb F66531 B21 B2l -WM] pea [@ o o228 i o20s s co4f] g 33] s 00dd '# ooss t ?* [~60551 - s - @ 4 11 p/ 1 e~ [0041].] b < U / .s [@l D M D+ fooqil G GE-762 E 829 OIOC (6sois-we 1 J PK:f Nil 2[8 0 1-Nil-22/6 Mat 8l loo 98' 0087 mumam cs. g,_ co85 Y f3AIN STEAM mg4; B2s '# ELD MAP [gg, NOTE-ALL PtPING & VALVE Pil NUM8ERS ARE PRECED:D "l '.o as os -02 BY -821 FCR COMPLETL 7M#IU
- M onse spc/S4 g 4' SYSTEM ILENTIFICATION ramadr 5532-PERRY UNITI tb oa FORM e GGS226-5/80 I
DOCUMENT NO. 80AM U NUCt. EAR ENERGY SERylCES. INC. FLOW ; ! REF. DWG. U ATWOOD & MORRILL CO. 3 7 + 13560-01-H 15 gg 18 14 g gi 13 12.h b. g gh h4 h 5 hh g 6 7 f -Y SECTION "A" "A" 7 ?? i $ (f .h I L 1 NOTE: COMPLETE IDENTIFICATION { [ ( NUMBERS HAVE PREFIX OF f I 1-B21-F022A FOLLOWING E .,lI WITH "N" DESIGNATING NUT gli'1 l> AND "B" DESIGNATING BOLT l P ( EX.: 1-B21-F022A-7N ) 5 c l "A" "A" S3 t/ y Q l P ,$4, JJ n g _q _ _._..._. ./ [."'l 7 ../ SYg" " MAIN STEAM i ~ VALVE F022A s B21 BOLTING LOCATION / nev: O no no 08-03 6/t3/B3 ev: fB orTE: / APP: M DATE:/C[/c/Cf [ PERRY UNIT 1 NOT TO SCALE ,m ,e-,n_--s .-m ,w w- - - - - --
,-w,e y,
ooCUMENT NO. 80A4427 NUCLEAR ENERGY SERVICES. INC. FLOW REF. DWG. q ATWOOD & MORRILL CO.
- 13560-01-H 15 gg 18 14 g g1 g2 13 12 h
$ 3 h h4 ^ ~ j1 0 0 hh g 6 i 7 y T' j SECTION "A" "A" %' l 'iI) 'f It = O! NOTE: COMPLETE IDENTIFICATION { [ ( NUMBERS HAVE PREFIX OF I i 1-B21-F022B FOLLOWING E 'I WITH "N" DESIGNATING NUT {pi'#d l> AND *B" DESIGNATING BOLT (EX.: 1-B21-FO22B-7N ) h y' O'3 t/ ,r J e !!glJJ n g _sg _..__._. / 7 ' 7, ,./ svgu MAIN STEAM inLE -~ VALVE FO228 5 B21 BOLTING LOCATION ~ / -/ nev: O no. no. 08-04 ev: /B oars:8//s/63 CLASS 1 - Am A/) 04re:sc/m/s3 [ PERRY UNIT 1 NOT TO SCALE
l Main steam PRO 2 RAM PLAN AND SCHEDULE By: 6% / w\\M l Document No. 80A4427 App: .amt / 84 l Preservice Inspection 5532-Perry Rev.2 Page 14 of'48' l CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 80ENTIFICATION DESCRIPTION NUMBER Of apphcabiel CATEGORY METHOO NO. REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 .k 1-B21-0001 Safe End to 26" Pipe 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0001D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0002 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0002U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0002D 26" Elbow Seam Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT l-B21-0003 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT k l-B21-0003U 26" Elbow Seam Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT l-B21-0003D 26" Pipe Seam, Downstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT i NES 239 &82
uain Steam PROGRAM PLAN AND SCHEDULE By-t AN / Whd Document No. 80A4427 App: Jamt / /o/f4 Preservice Inspection 5532-Perry Rev.2 Page 15 of '48 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTK)N NUMBER (if apphcable) CATEGORY METHOD No REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 1-B21-0004 26:' Pipe to Elbow 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT l-B21-0004U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT CS '/_\\. l-B21-0004D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III 80A0183 N/A PT 1-B21-0005 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0005U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0005D 26" Elbow Seam, Clockwise to Flow, 80A0186 PY-26-XXI-B-3 UT III Downstream CS-F 30A0183 N/A PT l-B21-0006 26" Pipe to Elbow 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT NES 239 6/82
ualn steam PROGRAM PLAN AND SCHEDULE By: 8 / %\\td Document No. 80A4427 App: her, / /o/f+ Preservice Inspection 5532-Perry Rev.2 Page 16 of 48 COMPONENT COMPONENT PROCEDURE K CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD No REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 1-B21-0006U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III /2 Flow, Upstream CS-F 80A0183 N/A PT l-B21-0006D 26" Pipe Seam, Downstream 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT l-B21-0007 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT 1-B21-0020 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III .f CS-F 80A0183 N/A PT l-B21-0008 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT 1-B21-0021 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0009 26" Pipe to 26"x 10" Contour Mozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT [' 1-B21-0022 10" Contour Nozzle to Flange 80A0816 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT NES 239 6/82
uain steam PROGRAM PLAN AND SCHEDULE By: is% / %\\t4 Document No. 80A4427 App: J4/m / /o/f* ' Preservice Inspection 3532-Perry Rev. 2' Page 17 of '48 Call 8 RATION CODE 80E I ICAT ON MSCRI T NU BE (if ble) CA ORY T No REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 1-B21-0010 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0023 10" Contour Nozzle to Flange 80A0lS6 PY-10-XX2-B-3 UT 111 CS-F 80A0183 N/A PT l-B21-0011 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0024 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0012 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT l-B21-0025 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT 111 CS-F 80A0183 N/A PT l-B21-0013A 26" Pipe to Pipe 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT 1-B-21-0013AU 26" Pipe Seam Upstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT NES 239 6/82
Main steam PROGRAM PLAN AND SCHEDULE Bys h% / w\\M Document No. 80A4427 App: h / /Mr# Preservice Inspection 3532-Perry Rev. 2' Page 18 of '48 CAUBRATION CODE IDE 4 T ON DE Pi 8 (if app able) CA ORY T No REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 1-B21-0013AD 26" Pipe Seam Downstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT l-B21-0013 26" Pipe to Elbow 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0013U 26" Pipe Seam, Upstream 80A0186 PY-26 B-3 UT III CS-80A0183 N/A PT 1-B21-0013D1 26" Elbow Short Seam, Downstream 80A0186 PY-26-XX1-B-3 UT III CS-F 30A0183 N/A PT 1-B21-0013D2 26" Elbow Long Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0014 26" Elbow to Valve B21-F022C 80A0186 PY-26-XXI-B-3 UT III CS-F 30A0183 N/A PT l-B21-0014UI 26" Elbow Short Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT l-B21-0014U2 26" Elbow Long Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT NES 239 6/82
Main Strm PROGRAM PLAN AND SCHEDULE Bys ti% / \\h\\t de Document No. SOA4427 App: he / /o/F Preservice Inspection 5532-Perry Rev. 2' Page 19 of '48 ~ CAtlBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcable) CATEGORY METHOO NO REMARKS PIPING WELDS - LOOP C Ref. Dwg. No. 08-01 1-B21-0015 26" Valve B21-F022C to Penetration 80A0186 PY-26-XX2-B-3 UT Vill P122 Process Pipe CS 80A0183 N/A PT l-B21-0016 26" Penetration P122 Pipe to Valve 80A0186 PY-26-XX2-B-3 UT Vill B21-F028C CS 80A0183 N/A PT l-B21-0017 26" Valve B21-F028C to Pipe 80A0186 PY-26-XX2-C-F UT VI!! CS 80A0183 N/A PT l-B21-0018 26" Pipe to 28" Pipe 80A0186 PY-26-XX2-C-F UT Vill CS 30A0183 N/A PT l-B21-0019 28" Pipe to Valve B21-F020C 80A0186 PY-28-140- C-F UT Vill CS 80A0183 N/A PT NES 239 6/82
B: ih / %\\\\E Main steam PROGRAM PLAN AND SCHEDULE Y Document No. 80A4427 App: 343,o / /o/f4 Preservice Inspection 5532-Perry Rev. 2' Page 20 of '48 COMPONENT COMPONENT PROCEDURE L K CODE E ZONE IDENTIFICATION DESCRIPTION NUMBER (11 apphcable) CATEGORY METHOD NO. REMARKS PIPING WELD LOOP A Ref. Dwg. No. 08-01 1-B21-0117 Safe End to 26" Pipe 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 1-B21-Oll7D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0118 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-Oll8U 26" Pipe Seam, Upstream 80A0186 PY-26-XX1-B-3 UT III CS 1 80A0183 N/A PT l-B21-Oll8D 26" Elbow Seam Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT l-B21-0119 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0119U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT l-B21-0119D 26" Pipe Seam, Downstream 80A0186 PY-26-XX1-B-3 UT III CS 80A0183 N/A PT NES 239 6/82
Main strm PROGRAM PLAN AND SCHEDULE By: iki / w\\M Document No. 80A4427 App:
- Aow,
/ 10//+ Preservice Inspection 5532-Perry Rev. 2' Page 21 of '48 ioScIrfcITE4 $r"cNT$ NUMB a a CA ORY ME REMARKS PIPING WELDS - LOOP A Ref. Dwg. No. 08-01 ~ 1-B21-0120 26" Pipe to Pipe 80A0186 PY-26-XXI-B-3 .UT 111 CS 80A0183 N/A PT l-B21-0120U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT 111 CS 80A0183 N/A PT l-B21-0120D 26" Pipe Seam, Downstream 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0120A 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0121 26" Pipe to Elbow 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0121U 26" Pipe Seam, Upstream 80A0186 P Y-26 B-3 UT Ill CS 80A0183 N/A PT l-B21-0121D 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT 1-B21-0122 26" Elbow to Pipe 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT NES 239 6/82
PROGRAM PLAN AND CCHEDULE BF N / WM uain steam Document No. 80A4427 APP: AirK- / lo/f+ Preservice Inspection 5532-Perry Rev.2 Page 22 of 48 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Uf apphcable) CATEGORY METHOO No REMARKS PIPING WELDS - LOOP A Ref. Dwg. No. 08-01 t. 1-B21-0122U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT Ill 5\\ Flow, Upstream CS-F 80A0183 N/A PT l-B21-0122D 26" Pipe Seam, Downstream 80A0186 P Y-26-80'- B-3 UT III CS 80A0183 N/A PT l-B21-0123 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT Ill CS 80A0183 N/A PT 1-B21-0133 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT 111 [1 CS-F 30A0183 N/A PT l-B21-0124 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0134 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III /g\\ CS-F 80A0183 N/A PT l-B21-0125 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT l-B21-0135 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III /h CS-F 80A0183 N/A PT NES 239 6/82
uain steam PROGRAM PLAN AND SCHEDULE By: d / WM Document No. 80A4427 App: hvo / /o/ff. Preservice Inspection 5532-Perry Rev. 2' Page 23 of '48 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP A Ref. Dwg. No. 08-01 1-B21-0126 26" Pipe to Elbow 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0126U 26" Pipe Seam, Upstream 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT (( '., 1-B21-0126D1 26" Elbow Short Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0126-D2 26" Elbow Long Seam, Downstream 80A0186 PY-26-XXI B-3 UT III CS-F 80A0183 N/A PT l-B21-0127 26" Elbow +.o Valve B21-F022A 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT l-B21-0127U1 26" Elbow Short Seam Upstream 80A0186 PY-26-XXI-B-3 UT III l CS-F 80A0183 N/A PT i 1-B21-0127U2 26" Elbow Long Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III t CS-F 80A0183 N/A PT l l-B21-0128 26" Valve B21-F322A to Penetration P124 80A0186 PY-26-XX2-B-3 UT VIII Process Pipe CS j 80A0183 N/A PT i NES 239 6/82
B: Yb / %\\N Main steam PROGRAM PLAN AND CCHEDULE Y Document No. 80A4427 App: Aent / to/M Preservice Inspectio.a. 5532-Perry Rev.2 Page 24 of 48 CAdBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP A Ret Dwg. No. 08-01 1-B21-0129 26" Penetration P124 Process Pipe to Valve 80A0186 PY-26-XX2-B-3 UT VIII k B21-F028A CS 80A0183 N/A PT l-B21-0130 26" Valve B21-F028A to Pipe 80A0186 PY-26-XX2-C-F UT Vill CS 80A0183 N/A PT l-B21-0131 26" Pipe to 28" Pipe 80A0186 PY-26-XX2-C-F UT VIII CS 80A0183 N/A PT 1-B21-0132 28" Pipe to Valve B21-F020A 80A0186 PY-23-140- C-F UT Vill CS 80A0183 N/A PT NES 239 6/82
Main steam PROGRAM PLAN AND CCHEDULE ty: U\\ / %\\Sk Document No. 80A4427 App: M nt / /0/r+ Preservice Inspection 5532-Perry Rey,2' Page 25 of' 48 CALIBRATON CODE COMPONENT COMPONENT PROCEDURE BLOCK COOC EXAM ZONE lOENTFCATION DESCRipTON NUMBER Ut appl +cablet GATEGORY METHOO NO REu h S WELDED ATTACHMENTS Ref. Dwg. No. 08-01 1-B21-Pipe Welded Attachment 80A0183 N/A C-E PT III 'k-G101C-WA 1-B21-Pipe Welded Attachment 80A0183 N/A C-E PT VIII H224-WA 1-B21-Pipe Welded Attachment 30A0183 N/A C-E PT 111 G101 A-WA l l-B21-Pipe Welded Attachment SOA0183 N/A C-E PT VIII H223-WA 4 NES 239 6/82
i uain steam PROGRAM PLAN AND CCHEDULE By: U,1 / \\hM Document No. 80A4427 App: d7nL / /0/49-Preservice Inspection 5532-Perry Rev. 2' Page 26 of 48 COMPONENT COMPONENT PROCEDURE OK CODE ZONE IDENT6FICATION DESCRIPTION NUMBER til appicable! CATEGORY METHOO No RE MARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 1-B21-0078 Safe End to 26" Pipe 80A0186 PY-26-XXI-B-3 UT III g CS 80A0183 N/A PT l-B21-0078D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0079 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 1-B21-0079U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0079D 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT 111 Flow, Downstream CS-F 80A0183 N/A PT l-B21-0080 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 1-B21-0080U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT 1-B21-0080D 26" Pipe Seam, Downstream 80A0186 P Y-26 B-3 UT III CS-XXI 80A0183 N/A PT i NES 239 6/82
uain steam PROGRAM PLAN AND SCHEDULE By: th / w\\% Document No. 80A4427 App: Agmc / foff, Preservice Inspection 5532-Perry Rev.2 Page 27 of '48 l l CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 1-B21-0081 26" Pipe to Pipe 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT k l-B21-0081D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0082 26" Pipe to Elbow 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT 'k 1-B21-0082U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0082D 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT l-B21-0083 26" Elbow to Pipe 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT [f_\\ 1-B21-0083U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT 1-B21-0083D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 4 NES 239 6'82
Main steam PROGRAM PLAN AND CCHEDULE By: 4_D / WhOr Document No. 80A4427 App: h / 10#i-l Preservice Inspection 5532-Perry Rev. 2' Page 28 of 4'8 CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXALs ZONE l IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 /2\\ 1-B21-0084 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0097 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT 111 CS-F 80A0183 N/A PT l-B21-0085 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26-XXI-B-3 UT 111 CS 80A0183 N/A PT l-821-0098 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-J UT III CS-F 80A0183 N/A PT 1-B21-0086 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT f y_\\ / l-B21-0099 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-e 80A0183 N/A PT l-B21-0087 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT l-B21-0081U 26" Pipe Seam, Upstream 80A0186 P Y-26 B-3 UT lif CS 80A0183 N/A PT 4 NES 239 6/82
Main Steam PROGRAM PLAN AND SCHEDULE By2 i L\\ / %\\t4 Document No. 80A4427 App: h / /0/f+ Preservice Inspection 5532-Perry Rev. 2 ' Page 29 of 48 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER U1 applicable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 1-B21-0100 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III , / 2 \\, CS-F 80A0183 N/A PT l-B21-0088 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0101 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT l-B21-0089 26" Pipe to 26"x 10" Contour Nozzle 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-102 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0089A 26" Pipe to Pipe 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT l-B21-0089AU 26" Pipe Seam Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0089AD 26" Pipe Seam Downstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT NES 239 6/82
Main steem PROGRAM PLAN AND SCHEDULE By3 iD / %\\M Document No. 80A4427 App: Aamt. / 13/f4-Preservice Inspection 5532-Perry Rev.2 Page 30 of 48 40SEfFfCIUCIN DYEP 8 CA GORY. ME REh4 ARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 1-B21-0090 26" Pipe to Elbow 80A0186 PY-26-080- B-3 UT III CS 80A0183 N/A PT l-B21-0090U 26" Pipe Seam, Upstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT l-B21-0090D1 26" Elbow Short Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT l-B21-0090D2 26" Elbow Long Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT l-B21-0091 26" Elbow to Valve B21-F022B 80/s0186 PY-26-XXI-B-3 UT III CS-F 30A0183 N/A PT l-B21-0091UI 26" Elbow Short Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0091U2 26" Elbow Long Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS-F 30A0183 N/A PT l-B21-0092 26" Valve B21-F022B to Penetration P416 80A0186 PY-26-XX2-B-3 UT VIII Process Pipe CS 80A0183 N/A PT NES 239 6/82
Main st=m PROGRAM PLAN AND SCHEDULE By: th / w\\tk Document No. 80A4427 App: JAnt., / /o/M ' ' Preservice Inspection 5532-Perry Rev. 2' Page 31 of '48 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK. CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD No REMARKS PIPING WELDS - LOOP B Ref. Dwg. No. 08-02 1-B21-0093 26" Penetration P416 Process Pipe to Valve 80A0186 PY-26-XX2-B-J UT. VIII CS 80A0183 N/A PT l-B21-0094 26" Valve B21-F028B to Pipe 80A0186 PY-26-XX2-C-F UT VIII CS 80A0183 N/A PT s 1-B21-0095 26" Pipe to 28" Pipe 80A0186 PY-26-XX2-CF UT Vill CS 80A0183 N/A PT 1-B21-0096 28" Pipe to Valve B21-F020B 80A0186 PY-28-140- CF UT Vill CS 80A0183 N/A PT 1 NES 239 6/82 m
l Main steam PROGRAM PLAN AND SCHEDULE By: N / \\bS& Document No. 80A4427 App: b/ m. / /d/f4 ~ Page 32 of 4'8 Preservice Inspection 5532-Perry Rev.2' IDSEfFfCITb DE T NUMB I pot b CA ORY ME No REMARKS l PIPING WELDS - LOOP D Ref. Dwg. No. 08-02 h 1-B21-0038 Safe End to 26" Pipe 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0038D 26" Pipe Seam, Downstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 1-B21-0039 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT 1-B21-0039U 26" Pipe Seam, Upstre am 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0039D 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT l-B21-0040 26" Pipe to Elbow 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0040U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT l-B21-0040D 26" Pipe Seam, Downstream 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT NES 239 6/82
Main stem PROGRAM PLAN AND SCHEDULE Bys t6 / WM Document No. 80A4427 App: h / /o/f+ Preservice inspection 5532-Perry Rev. 2' Page 33 of 48 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PIPING WELDS - LOOP D Ref. Dwg. No, 03-02 /k 1-B21-0041 26" Pipe to Pipe 80A0186 PY-26-XXI-B-3 UT 111 CS 80A0183 N/A PT l-B21-0041U 26" Pipe Seam, Upstream 80A0186 P Y-26-80_- B-3 UT III CS 80A0183 N/A PT k-- l-B21-0041D 26" Pipe Seam, Downstream 80A0186 PY-26-XX1-B-1 UT III CS 80A0183 N/A PT 1-B21-0042 26" Pipe to Elbow 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT 1-B21-0042U 26" Pipe Seam, Upstream 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-B21-0042D 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Downstream CS-F 80A0183 N/A PT l-B21-0043 26" Elbow to Pipe 80A0186 PY-26 B-3 UT III CS 80A0183 N/A PT ['N 1-B21-0043U 26" Elbow Seam, Clockwise to 80A0186 PY-26-XXI-B-3 UT III Flow, Upstream CS-F 80A0183 N/A PT NES 239 6/82
B: tb /Whk uain steam PROGRAM PLAN AND SCHEDULE Y Document No. 80A4427 App: Am / ws4 Preservice Inspection 5532-Perry Rev. 2' Page 34 of 48 COM @ ENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD No REMARKS PIPING WELDS - LOOP D Ref. Dwg. No. 08-02 1-B21-0043D 26" Pipe Seam, Downstream 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT 1-B21-0044 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT /k\\ l-B21-0055 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT 1-B21-0045 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT "k l-B21-0056 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT III CS-F 80A0183 N/A PT l-B21-0046 26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT /k\\ l-B21-0057 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT 111 CS-F 80A0183 N/A PT 1-B21-0047-26" Pipe to 26"x 10" Contour Nozzle 80A0186 P Y-26 B-3 UT 111 CS 80A0183 N/A PT NES 239 6/82
Main steam PROGRAM PLAN AND SCHEDULE By: N / %%4 Document No. 80A4427 App:,Jamt- / toj'r+ Preservice Inspection 5532-Perry Rev.2 Page 35 of 48 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOO No REMARKS PIPING WELDS - LOOP D Ref. Dwg. No. 08-02 d\\ 1-B21-0058 10" Contour Nozzle to Flange 80A0186 PY-10-XX2-B-3 UT 111 CS-F 80A0183 N/A PT l-B21-0048 26" Pipe to Elbow 80A0186 PY-26 B-3 UT 111 CS 80A0183 N/A PT l-B21-0048U 26" Pipe Seam, Upstream 80A0186 P Y-26 B-3 UT III CS 80A0183 N/A PT l-B21-0048DI 26" Elbow Short Seam, Downstream 80A0186 PY-26-XXI-B-3 UT 111 \\ CS-F 80A0183 N/A PT l-B21-0048D2 26" Elbow Long Seam, Downstream 80A0186 PY-26-XXI-B-3 UT 111 CS-F 80A0183 N/A PT 1-B21-0049 26" Elbow to Valve B21-F022D 80A0186 PY-26-XXI-B-3 UT III CS 80A0183 N/A PT l-821-0049UI 26" Elbow Short Seam, Upstream ,80A0186 PY-26-XXI-B-3 UT Vill [f\\ CS-F 30A0183 N/A PT l-B21-0043U2 26" Elbow Long Seam, Upstream 80A0186 PY-26-XXI-B-3 UT VIII CS-F 80A0183 N/A PT NES 239 6/82
Main St:am PROGRAM PLAN AND CCHEDULE By-th / WM4 Document No. 80A4427 App: h / /o/fd. Preservice Inspection 5532-Perry Rev. 2' Page 36 of 48 ~ CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS PI') LNG WELDS - LOOP D Ret. Dwg. No. 08-02 /4\\ 1-B21-0050 26" Valve B21-F022D to Penetration P416 80A0186 PY-26-XX2-B-3 UT VIII Process Pipe CS 80A0183 N/A PT l-B21-0051 26" Penetration P416 Process Pipe to Valve 80A0186 PY-26-XX2-B-3 UT VIII B21-F028D CS 80A0183 N/A PT l-B21-0052 26" Valve B21-F028D to Pipe 80A0186 PY-26-XX2-C-F UT VIII CS 80A0183 N/A PT l-B21-0053 26" Pipe to 28" Pipe 80A0186 PY-26-XX2-C-F UT VIII CS 80A0183 N/A PT l-B21-0054 28" Pipe to (alve B21-F020D 80A0816 PY-28-140- C-F UT VIII CS 80A0183 N/A PT I NES 239 6/82
uain Steam PROGRAM PLAN AND SCHEDULE By: d / W\\O Document No. 80A4427 App:
- Jam,
/ /o/fs Preservice Inspection 5532-Perry Rev.2 Page 37 of 48 Call 8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS WELDED ATTACHMENTS \\ ,E N Ref. Dwg. No. 08-02 1-B21 Welded Pipe Attachment 80A0183 N/A C-E PT III G101B-WA t 1-B21 Welded Pipe Attachment 80A0183 N/A C-E PT VIII H221-WA 1-B21 Welded Pipe Attachment 80A0183 N/A C-E PT III G101D-WA 1-B21 Welded Pipe Attachment 80A0183 N/A C-E PT VIII H222-WA I NES 239 6/82
Main st:am PROGRAM PLAN AND CCHEDULE By: Y L\\ / %\\1k Document No. 80A4427 App: h / jn/gb Preservice Inspection 5532-Perry Rev. 2 ' Page 38 of 48 't CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS '\\ COMPONENT EXAMINATIONS Ref. Dwg. No. 08-01 1-B21-F028 A-B 26" Valve B21-F028A Bolting 80A0184 N/A
- B-G-1 VT-1 Ill 1-B21-F022A-B 26" Valve B21-F022A Bolting 80A0184 N/A
- B-G-1 VT-1 III l-B21-F022C-B 26" Valve B21-F022C Bolting 80A0184 N/A
- B-G-1 VT-1 III l
l-B21-F028C-B 26" Valve B21-F028C Bolting 80A0184 N/A
- B-G-1 VT-1 III 1
l-B21-F022A-IS 26" Valve B21-F028C Internal Surface 80A0184 N/A
- B-M-2 VT-1 Ill NOTE: Code category B-G-1 of ASME Section XI, Summer 1978 Addenda does not require any examination for boltings on valves, grouped under category B-M-2, but not scheduled based on selection criteria. We have optionally scheduled these remaining valves for visual examination (VT-1).
4 NES 239 6/82
Main steam PROGRAM PLAN AND CCHEDULE By: d /WM Document No. 80A4427 App: JAnx> / lo/f6 Preservice Inspection 5532-Perry Rev.2 Page 39 of 48 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE lOENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 08-01, 08-04 1-B21-F041A-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041 A Bolting 1-B21-F041E-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041E Bolting 1-B21-F051 A-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F051 A Bolting 1-B21-F051C-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F051C Bolting 1-B21-F047C-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047C Bolting 1-B21-F051 G-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F051G Bolting 1-B21-F041G-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041G Bolting 1-B21-F047G-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047G Bolting NES 239 &82
Main Steam PROGRAM PLAN AND SCHEDULE By3 i% / %\\O Document No. 80A4427 App: JAffm / foje Preservice Inspection 5532-Perry Rev. 2 ' Page 40 of 48 ' CALIBRA! ION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable) CATEGORY METHOD NO REMARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 08-01, 08-04 1-B21-F041C-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041C Bolting l 8 NES 239 6/82
Main steam PROGRAM PLAN AND SCHEDULE Bys th / %M Document No. 80A4427 App: JM / fo/ff- ' I Preservice Inspectio" 5532-Perry Rev.2 Page 41 of 48 CAttBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcable) CATEGORY METHOC No REuARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 08-02 1-B21-F022D-B 26" Valve B21-F022D Bolting 80A0184 N/A B-G-1 VT-1 III 1-B21-F028D-B 26" Valve B21-F028D Bolting 80A0184 N/A B-G-1 VT-1 III l-B21-F022B-B 26" Valve B21-F022B Bolting 80A0184 N/A B-G-1 VT-1 III 1-B21-F028B-B 26" Valve B21-F023B Bolting 80A0184 N/A B-G-1 VT-1 III NOTE: Code category B-G-1 of ASME Section XI, Summer 1978 Addenda does not require ~any examination for bottings on valves. Grouped under category B-M-2, but not /,\\ schedtiled based on selection criteria. We have optionally scheduled these remaining /~\\ valves for visual examination (VT-1). NES 239 6/82
Main Steam PROGRAM PLAN AND SCHEDULE By: W% / W\\d Document No. 80A4427 App: h / /0/s. Preservice Inspection 5532-Perry Rev. 2 ' Page 42 of 48 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTLFICATION DESCRIPT60N NUMBER of appucablel CATEGORY hETHOO NO REMARKS COMPONENT EXAMINATIONS Ref. Dwg. No. 08-02, 08-04 1-B21-F041F-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041F Bolting 1-B21-F047B-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047B Bolting 1-B21-F041B-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041B Bolting I-B21-F051B-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F051B Bolting 1-B21-F047F-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047F Bolting 1-B21-F041 K-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041K Bolting 1-B21-F047D-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047D Bolting 1-B21-F041 D-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F041D Bolting NES 239 682
Main Steam PROGRAM PLAN AND SCHEDULE Ey: th / W\\td Docurnent No. 80A4427 App: . Lee / /o/f4 Preservice Inspection $532-Perry Rev. 2' Page 43 of 48 CALIBRATION CODE 4 COMPONENT COuPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER lit apphcablel CATEGORY METHOO NO REM W S COMPONENT EXAMINATIONS Ret Dwg. No. 08-02, 08-04 1-B21-F047H-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F047H Bolting 1-B21-F051 D-B 8" x 10" Safety Relief Valve 80A0184 N/A B-G-2 VT-1 III F051D Bolting 1-B21-F051D-IS 8" x 10" Safety Relief Valve 80A0184 N/A B-M-2 VT-1 III F051D Internal Surface P4ES 239 682
y E: tD / W\\M main Steam PROGRAM PLAN AND SCHEDULE Y Document No. 80A4427 App: _, Jam / /o/f( Preservice Inspection 5532-Perry Rev.2 Page 44 of '48 CAttBRATON CODE m DE NUMEE 01 actes CA GORY T NO RE M RKS BOLTING EXAMINATIONS Valve B21-F022A ReL Dwg. No. 08-03 1-B21-F022A-Stud #1 30A0196 PY-STUD-MS-UT IB 2.25-CS B-G-1 30A0lS3 N/A PT l-B21-F022A-Stud #2 80A0196 PY-STUD-MS-UT 2B 2.25-CS B-G-1 111 30A0lS3 N/A PT l-B21-F022A-Stud #3 30A0196 PY-STUD-MS-UT 3B 2.25-CS B-G-1 III SOA0183 N/A PT l-B21-F022A-Stud #4 80A0196 PY-STUD-MS-UT 4B 2.25-CS B-G-1 III 30A0lS3 N/A PT 1-B21-F022A-Stud #5 80A0196 PY-STUD-MS-UT 5B 2.25-CS B-G-1 til 80A0lS3 N/A PT l-B21-F022A-Stud #6 80A0196 PY-STUD-MS-UT 6B 2.25-CS B-G-1 III 80A0183 N/A PT l l-B21-F022A-Sted #7 30A0196 PY-STUD-MS-UT i' 7B 2.25-CS B-G-1 Ill SOA0183 N/A PT l-B21-F022A-Stud #3 30A0196 P Y-STUD-MS-UT 8B 2.25-CS B-G-1 til 30A0183 N/A PT nds zasse2
uain Steam PROGRAM PLAN AND SCHEDULE CY' N / Dhd Document No. 80A4427 App: hm / /o/fp ' Preservice Inspection 5532-Perry Rev.2 Page 45 of 48 CALIBRATION CODE ^ OE TON DE BE pf am aew CA GORY T NO REuARKS BOLTING EXAMINATIONS Valve B21-F022A Ret Dwg. No. 08-03 1-B21-F022A-Stud #9 80A0196 P Y-STUD-MS-UT f 9B 2.25.-CS B-G-1 III 30A0183 N/A PT l-B21-F022A-Stud #10 80A0196 PY-STUD-MS-UT 10B 2.25-CS B-G-1 III 80A0183 N/A PT l-B21-F022A-Stud #11 80A0196 PY-STUD-MS-UT 11B 2.25-CS B-G-1 III 80A0183 N/A PT 1-B21-F022A-Stud #12 80A0196 PY-STUD-MS-UT 12B 2.25-CS B-G-1 III 30A0183 N/A PT l-B21-F022A-Stud #13 80A0196 PY-STUD-MS-UT 13B 2.25-CS B-G-1 III 80A0183 N/A PT j 1-B21-F022A-Stud #14 80A0196 PY-STUD-MS-UT 14B 2.25-CS B-G-1 III j 80A0183 N/A PT l-B21-F022A-Stud #15 80A0196 PY-STUD-MS-UT ISB 2.25-CS B-G-1 III 80A0183 N/A PT 1-B21-F022A-Stud #16 80A0196 PY-STUD-MS-UT 16B 2.25-CS B-G-1 III 80A0183 N/A PT Nds 239 se2
Main Stearn PROGRAM PLAN AND SCHEDULE By3 O / %\\N Docurnent No. 80A4427 App: _Jd40 / /0,#f-Preservice Inspection 5532-Perry Rev.2 Page 46 of 48 CAllBRATION CODE NNT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE ENTFQDON DESCfhPT10N NUMBER pf apphcabiel CATEGORY METHOC NO REtaARKS BOLTING EXAMINATIONS Valve B21-F022A Ret Dwg. No. 08-03 2\\ 1-B21-F022A-Stud #17 80A0196 P Y-STUD-MS-UT 17B 2.25-CS B-G-1 III 80A0183 N/A PT l-B21-F022A-Stud #18 80A0196 PY-STUD-MS-UT ISB 2.25-CS B-G-1 111 30A0183 N/A PT 1-B21-F022A-Hex Nut #1 80A0184 N/A B-G-1 VT-1 III IN 1-B21-F022A-Hex Nut #2 80A0184 N/A B-G-1 VT-1 III 2N 1-B21-F022A-Hex Nut #3 80A0184 N/A B-G-1 VT-1 111 3N 1-B21-F022A-Hex Nut #4 80A0184 N/A B-G-1 VT-1 III 4N 1-B21-F022A-Hex Nut #5 80A0184 N/A B-G-1 VT-1 III SN 1-B21-F022A-Hex Nut #6 80A0184 N/A B-G-1 VT-1 III 6N NES 239 682
uain steam PROGRAM PLAN AND CCHEDULE By: N / W\\t4 Document No. 80A4427 App: .dde / 10/14 ' Preservice Inspection 5532-Perry Rev. 2' Page 47 of 48' CAllBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE t0ENTIFICATION DESCRIPTION NUMBER (if applicable) CATEGORY METHOD NO REMARKS BOLTING EXAMINATION Valve B21-F022A Ref. Dwg. No. 08-03 1-B21-F022A-Hex Nut #7 80A0184 N/A B-G-1 VT-1 III 7N 1-B21-F022A-Hex Nut #8 80A0184 N/A B-G-1 VT-1 III 8N 1-B21-F022A-Hex Nut #9 80A0184 N/A B-G-1 VT-1 III 9N 1-B21-F022A-Hex Nut #10 80A0184 N/A B-G-1 VT-1 III 10N 1-B21-F022A-Hex Nut #11 80A0184 N/A B-G-1 VT-1 III IIN 1-B21-F022A-Hex Nut #12 80A0184 N/A B-G-1 VT-1 III 12N 1-B21-F022A-Hex Nut #13 80A0184 N/A B-G-1 VT-1 III 13N 1-B21-F022A-Hex Nut #14 80A0184 N/A B-G-1 VT-1 III 14N NES 239 6/82
uain steam PROGRAM PLAN AND SCHEDULE Bys t\\\\ / %\\S4 Document No. 80A4427 App: Anw / /0/F4-Preservice Inspection 5532-Perry Rev. 2' Page 48 of 4'8 COMPONENT COMPONENT PROCEDURE OCK CODE E ZONE IDENTIFICATION DESCRIPTION NUMBER til appicable) CATEGORY METHOO NO. REMARKS BOLTING EXAMINATION Valve B21-F022A Ref. Dwg. No. 08-03 1-B21-F022A-Hex Nut #15 80A0184 N/A B-G-1 VT-1 III 15N 1-B21-F022A-Hex Nut #16 80A0184 N/A B-G-1 VT-1 III 16N 1-B21-F022A-Hex Nut #17 80A0184 N/A B-G-1 VT-1 III 17N 1-B21-F022A-Hex Nut #18 80A0184 N/A B-G-1 VT-1 III 18N l l NES 239 6/82 -}}