Issue date: 09/13/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Wade T
ENERGY, DEPT. OF, IDAHO OPERATIONS OFFICE
Shared Package
ML20136F578 List:
References
CON-FIN-A-6819, FOIA-84-751 NUDOCS 8510220215
Download: ML20138C147 (9)


Text

i

' /

e UNITED STATES

/

$js y, c, j NUCLEAR REGULATORY COMMISSION

. 7 'x

j. ;

WASHINGTON. D. C. 20555

%, vt/

SEP 13 E.;,

Mr. Troy E. Wade, III, Manager Idaho Operations Office U.S. Department of Energy 550 Second Street Idaho Falls, Idaho 83401

Dear Mr. Wade:

SUBJECT:

INEL TECHNICAL ASSISTANCE TO THE DIVISION OF LICENSING, NRR, NRC: " EVALUATION OF SELECTED NRC OPEN ITEMS BEFORE PLANT FUEL LOAD" FIN A-6819 The enclosed NRC Form 173, Standard Order for DOE Work, for $300K is submitted in accordance with Section III.B.2 of the DOE /NRC Memorandum of Understanding dated February 24, 1978. As indicated in the enclosed NRC Fonn 173 we accept the INEL proposal cated September 1984.. Funding in the amount of $432K has previously been provided for this work with the last increment being provided by our letter and Form 173 datec July 2,1.984.

Please indicate DOE acceptance by signing and returning the enclosed NRC Form 173 to the NRC Office of Resource Management, Division of Accounting and Finance with a copy to this Office.

If you have any questions, please contact Mr. Mark H. Williams (FTS 492-8461). Thank you for your assistance.

Sincerely, V

Darrell

. Eisenhut, Director

}8DivisionofLicen:ing Office of Nuclear Reactor Ragulation Enclosure (s):

1.

NRC Form 173 cc: w/ enclosure See next page 8510220215 851016 PDR FOIA O

CARDE84-751 PDR

.j

t U S. NUCLEAR AEGULATORY COMMISSON OROER NUW6ER l NRC FOAM 173 49 20-84-660 STANDARD ORDER FOR DOE WORK SEP 131984 ISSUED TO: (DOE Office)

ISSUED SY: (NRC Office)

ACCOUNTING CITATION

^"a *AmTON SYMBOL Office of Nuclear Reactor 31X0200.204 Idaho Operations Office Regulation / Div. of Licensing SaA NUM8rA PEnFOmnelNG ORGANIZATION AND LOCATION 20-19-40-41-1 FIN NUMBER Idaho National Engineering Laboratory A 6819-4 Idaho Falls Idaho

,g,,C,,,,gg,7g,3 g,gg, FIN TITLE FlxED E ESTIMATED :

" Evaluation of Selected NRC Open Items Before Plant Fuel FROM TO Load" FIN A6819 4/20/84 11/30/84 OSLIGATION AVAILABILITY PROvlDED BY:

a THiS CA0EA 5,.

8 TCTAL OF OROEAS PLACEO PACA TO THIS DATE WiTH THE PERFOAMING OAGANIZATCN UNDER THE SAME "Ap*AOPAtATON SYMBOL" ANO THE FIAST FOUR ociTS OF THE ~8&A NUMBEA ' CITED ABOVE '6,869,000 C TOTAL OAOEAS TO DATE

'i (TOTAL A & Bi 5 7.169,000

~

D.

AMOUNT INCLUCED IN "C" APPUCA8LE TO THE " FIN NUMBER" CITED IN THIS CADER S

732.000 l'

- ANCIAL FLEN181UTY 3C FUNOS wtLL NOT BE REPAOGRAMMED BETWEEN FINS UNE D CONSTITUTES A UMITATION ON 06LcATCNS AUTHOR 210 2 FUNOS MAY BE RE**OGAAMMED NOT TO EXCEED rion OF F6N LEVEL UP TO 550K UNE C CONSTITUTES A UM(TArcar ON e

06UGATCNS AUTm40 STANDARD TEAMS AND CONOITCNS tese NAC Manwas Chapter 1102. Accones Part 4) ARE PART OF TH!S OADEA UNLESS OTHEh SE NOTED ATTACMMENTS THE FOLLOW 1NG ATTACHMENTS ARE MERE 8Y MADE A PART OF THis SECUAiTY C WOAK ON THIS ORDER INVOLVES CLASSIFIED OADER INFOAMATCN NAC FOAM 187 IS ATTACHEQ 2 STATEMENT OF WOAg

! ADDITCNAL TEAMS AND CON 0tTCNS it WNK ON THis OADER INVOLVES UNCLASSIFIED SAFEGUAAOS. PAOPAiETAAY, CA OTHEA SENSITIVE CTMEA INFOAuATCN FEE RECOVERABLE WORK

woAK ON THis OADEA IS UNCLASSIFIED ANO NOT sensitive Z NON FEE RECOVERABLE WORK REMARKS (Aeterexe une procosat oy numoer and care anc enocare et tne stracned starement of more moo res tne OCE oroocsan This order accepts the INEL proposal dated September 1984 and provides funds to complete the work on the FIN through Project 2 (Comanche Peak).

After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandots, and Drovide a copy to the Office of Nuclear Reactor Regulation. ATTN: K. McGrath.

ACCEPTING ORGANIZATION IS$nutNQ AUTHORITY CGNATUAE SIGNATUAE

.E }

arrellG@isd(hutp61 rector TITLE l

AI Division of Licensing, ONRR/NRC CATE MAC fop \\173 i1-84,

h J

t SEP 131984 Mr. Troy E. Wade, III, Manager Idaho Operations Office U.S. Department of Energy 550 Secona Street Idaho Falls, Idaho 83401

Dear Mr. Wace:

SUBJECT:

INEL TECHNICAL ASSISTANCE TO THE DIVISION OF LICENSIhG, NRR, NRC: " EVALUATION OF SELECTED NRC OPEN ITLMS BEFORE PLANT FUEL LOAD" FIN A-6819 The enclosed NRC Fom 173, Stancaro Orcer for DUE Work, for $300A is suomitted in accorcance witn Section III.B.2 of tne UDE/NRC Memorancum of Uncerstancing cateo Feoruary 24, 1978. As incicateo in tne enclosed f4RC Fom 173 we accept the INEL proposal catec September 1984. Funcing in the amount of $432K nas previously been provicec for this work witn the last increment being provicea oy our letter ana Fom 173 datea July 2,1.984.

Please indicate DOE ac'ceptance by signing and returning tne encloseo NRC Fom 173 to tne NRC Office of Resource Management, Division of

~

Accounting and Finance witn a copy to tnis Office.

If ycu have any questions, please contact Mr. Hark H. Williams (FTS 492-8461). Thank you for your assistance.

Sincerely, Darrell G. Eisennut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure (s):

1..

f4RC Fom 173 l

cc: w/ enclosure See next page i\\ T r

',,,,cf RR l

NRR 7 1RR

"* ' > l.

$1.....Q.4 h....tRd vILk g~53LA P-0"-

UT""*""""

............... ~..

. ~.. - ~. ~ ~ ~.

. ~............ -.

.- ~.~.....

/^.

u ru p

%...l............

{k..f......g......

. ~.......... ~...

. ~. ~. -......

..)

i September 5,1984 Mr. F. L. Sims Director Reactor Research and Technology Division Idaho Operations Office - DOE Idaho Falls, 10 83401 EG&G PERSONhEL TO SUPPORT CYCLES 4 & 5 0F COMANCHE PEAK ALLEGATIONS TEAM (A6819) - LPL-380-84 Ref:

G. E. Marx Itr to 5. B. Milam, Transmittal of Revised NRC Forms 189 For Evaluation of Selected NRC Open items 8efore Plant Fuel Load (A6819) and Evaluations of Selected Open NRC Activities at NTOL Sites Needing Action Before Plant Fuel Lead (A6821) - Marx-262-84 August 16. 1984

Dear Mr. Sims:

EG&G Idaho, Inc. is providing technical support to the NRC in the review and evaluation of allegations of design and construction deficiencies at the Comanche Peak plant (Reference). To date, EG&G has provided personnel for the first three review cycles at the plant site. A fourth review cycle is seneduled for September 10 through 21 and a possible fifth cycle for October i through 12. The NRC has expressed a strong desire to maintain personnel continuity from cycle to cycle.

This letter is written in response to an NRC verbal request for a roster of EGAG Idaho personnel to be assigned to cycles 4 and 5.

The roster for cycle 4 is attached and the roster for cycle 5 will be transmitted as soon as it i

is confirmed. EG&G Idaho appreciates the desiracility for personnel contin-uity and will do their utmost to maintain continuity. However, it cannot be guaranteed in every case.

j These personnel commitments have been discussed with Mr. P. E. Litteneker of i

your staff, as well as with the NRC.

l Very truly yours.

[

l L.

. L ach, Manager NRC Technical Programs Division l

i CFO:acf i

Attachment:

As Stated i

cc:

M. H. Williams, NRC J. 0. Zane, EG4G Idaho 9) l E20 G00 'ON E2051 'GI 0393 42:5i r8/GO 60

[

Attachment EG&G IDAHO PERSONNEL ROSTER CYCLE 4 - COMANCHE PEAK ALLEGATIONS TEAM September 10 - September 21, 1984 Victor Wenzel Douglas Hansen Vernon Watson Tom Curry Dean,Suneners Milton Bullock (9/16 - 9/21 only)

Rudolf Bonnenberg 4

Ronald VanderBeek Robert Evans Harold Mang Robert Harbron Charles Hofmeyer (Subcontract - Brookhaven National Laboratory) l C00 800 *0t4 8*2031 *G1 0"d93 12:GT P8/SO.'60

4 h EGs0k,.-

roawgogan TELECOPIER TRAN8MITTAL REQUEST TO ORSANIZATION NRC A00RE88 Phillips Butiding MarkH.Willfams 492-8285 ATTENTION TYPE OF TELECOPlf#

TELEC0 PIER TELEPHONE NO.

VERIFICATION TELEPHONE NO.

i pgog C. F. Obenchain TELEPHONENO.

583-9696 C00lPANY EGaG Idaho TYPE OF TELECOPIER TELECOPIER TElf? HONE NO.

VERIFICATION TELEPHONE NO. --

2 9/5/84 TOTAL PAGES (excluding transmhtsi shest) 0 ATE X

NO RETUM ORIGINAL YE8 l

NAME Accie Ferousen EXT 6-9696 TOO 800'ON 870S1 *01 ErdD3 92:St t8/SO/60 T6SEE858

September 5, 1984 Mr. F. L. Sims, Director Reactor Research and Technology Division Idaho Operations Office - DOE Idaho Fells, ID 83401 EG&G PERSONNEL TO SUPPORT CYCLES 4 & 5 0F COMANCHE PEAK ALLEGATIONS TEAM (A6819) - LPL-380-84 Ref:

G. E. Marx Itr to 5. B. Milam, Transmittal of Revised NRC Forms 189 For Evaluation of Selected NRC Open Items 8efore Plant Fuel Load (A6819) and Evaluations of Selected Open NRC Activities at NTOL Sites Needing Action Before Plant Fuel Load (A6621) - Marx-262-84, August 16, 1984

Dear Mr.'Sims:

EGAG Idaho, Inc. is providing technical support to the NRC in the review and evaluation of allegations of design and construction deficiencies at the Comanche Peak plant (Reference). To date, EG&G has provided personnel for the first three review cycles at the plant site. A fourth review cycle is scheduled for September 10 through'21 and a possible fifth cycle for October 1 through 12. Th6 NRC has expressed a strong desire to maintain personnel continuity'from cycle to cycle.

This letter is written in response to an NRC verbal request for a roster of EG&G Idaho personnel to be assigned to cycles 4 and 5.

The roster for cycle "4 is attached and the roster for cycle 5 will be transmitted as soon as it is confirmed. EG&G Idaho appreciates the desirability for personnel contin-uity and will do their utmost to maintain continuity. However, it cannot be guaranteed in every case.

These personnel cemitments have been disc'ussed with Mr. P. E. Litteneker of your staff, as well as with the NRC.

Very truly yours, A

L. P. Leach, Manager

-NRC Technical Programs Division CFO:acf

Attachment:

As Stated cc:

M. H. Williams, NRC J. O. Zane, EG&G Idaho

p"'

n 44 EScG...<..,,

P.O. BOX 1625, IDAHO FALLS, IDAHO 83415 September 20, 1984 Mr. F. L. Sims, Director Reactor Research and Technology Division Idaho Operations Office - DOE Idaho Falls, ID 83401 EG&G PERSONNEL TO SUPPORT CYCLE S OF COMANCHE PEAK ALLEGATIONS TEAM 1

(A6819) - LPL-393-84 Ref:

L. P. Leach ltr to F. L. Sims EG&G Personnel to Supoort Cycles 4 & 5 0F COMANCHE PEAK ALLEGATIONS TEAM (A6819) - LPL-380-84 September 5, 1984 Cear Mr. Sims:

EG&G Idaho, Inc. is providing technical suoport to the NRC in the review and evaluation of allegations of design and construction deficiencies at the Comanche Peak plant. To date, EG&G has provided personnel for the first four review cycles at the plant site. A fifth review cycle is scheduled for October 1 throuqb Octcber 12.

In compliance with the ccmmitment of the Reference letter, a roster of EG&G Idaho personnel to be assigned to Cycle 5 is attached. EG&G Idaho nas done their utmost to maintain continuity of personnel frcm previous cycles and has done so where practical.

These commitments of personnel have been discussed with Mr. P. E. Littenekor of your staff as well as with the NRC.

Very truly yours, s

L. P. Leach, Manager.

NRC Technical Programs Division HLM:acf

Attachment:

As Stated cc:

M. H. Williams, hRC J. O. Zane, EGSG Idaho (w/o Attachment) l

~

k Attachment S:ptember 20, 1984 LPL-393-84 Page 1 of 1 EG&G IDAHO PERSONNEL ROSTER CYCLE 5 COMANCHE PEAK ALLEGATIONS TEAM OCTOBER 1 THROUGH OCTOBER 12 Vernon Watson Tom Curry Dean Summers Rudolf Bonnenberg Ronald VanderBeek Harold Mang Robert Harbron Jack Corbet Luke Jones Victor Wenzel Milton Bullock