ML20138C117

From kanterella
Jump to navigation Jump to search
Forwards,For Concurrence,Std Order for DOE Work,Changing Statement of Work for Evaluation of Selected NRC Open Items Before Plant Fuel Load, (FIN A-6819,Project 2)
ML20138C117
Person / Time
Site: Comanche Peak, 05000000
Issue date: 08/24/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Sims F
ENERGY, DEPT. OF
Shared Package
ML20136F578 List:
References
CON-FIN-A-6819, FOIA-84-751 NUDOCS 8510220202
Download: ML20138C117 (4)


Text

.

i . bec w/ enclosures:

RF AUG 2 4 584 SF TI_ppolito g MWilliam Q DEisenhut DEisenhut RF DCrutchfield LSolander Mr. F. L. Sims Director .

Reactor Research and Technology Division .

U.S. Department of Energy ..

550 2nd Street Idaho Falls, Idaho 83415 ...

Dear Mr. Sims:

SUBJECT:

INEL TECHNICAL ASSISTANCE TO THE. DIVISION OF LICENSINC, NRR; NRC:

" EVALUATION OF SELECTED NRC OPEN ITEMS.BEFORE PLANT FUEL LOAD" (FIN A-6819, PROJECT 2)

\

The enclosed NRC Form 173 Standard. Order for DOE Work is submitted in accordance with Section III.B.2 of the DOE /NRC Me::orandum of Understanding of February 24, 1978. The purpose _of this Order is to change the Statement of Work for the subject FIN as.shown in,the attachment.

Please indicate DOE acceptance by.aigning.and. returning the enclosed NRC Form 173 to the NRC Office of Resource. Management Division of Accounting and Finance, with a copy to this. Office.

If you have any questions, please contact Mark Willi'ams, (FTS 492-84611 Thank you for your assistance.

Sincerely, .

Original Signed By:

p fYA.Af"J Darrell C. Eisenhut, Director.

5 Division of Licensing l

Enclosure:

.. d

1. NRC Form 173 ... .
2. Statement of Work ..

cc w/ enclosures:

See next page ..

8510220202 851016 PDR FOIA l, # /

GARDE 04-751 PDR q omes >! l NRR/DL'. ~ NRR/PPAS RR NRR

,"NUM, a$s

[ N ,hyp , i' Io '

g,,f.. g . . . L.S. .o. .la.

. . .D. .C. r. .u. .t.c. .h. .f.i. .e. l. .c . . D..n..f. .i.'s.

f.W..e...n.h. . . .u.

. .t. . . .

,mp 08/3 /84 08/p./84 08/' /84 08

.................. ......... ........ .. .................. ... 08../[./. 84. . . . . ./.M/. 8 4 sc rosu aia no somacu o24o OFFICIAL RECORD COPY. W u.s.cao on-m.r4

4 Mr. F. L. Sims, Manager Reactor Research and Technology Division U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 cc: Mr. Robert W. Barber Office of Nuclear Safety - EP-34 U.S. Department of Energy Washington, DC 20545 Mr. Darrell Lewis U.S. Department.of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. P. Litteneker U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls Idaho 83401 Mr. E. W. Roberts Idaho National Engineering Lab EG&G Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. C. Obenchain Idaho National Engineering Lab EG&G Post Office Box 1625 Idaho Falls, Idaho 83415 l

l

C'RC pones 173 u.s. muets Aa RscutATom v coassaission cros a e:ueses a 15-* 20-84-636 DATE STANDARD ORDER FOR DOE WORK ,

AUG 2 41984 j l

ISUED TO: 1000 Omeel ISBUE D eY: (NRC Of feco) ACCousenseG CITAMoN.

Office of Nuclear Reactor ^*** o'a '^ T 'o* * * *ot-Idaho Operations Office Regulation,DL y yn7nn pna

, enR aumesR PExponeseNo Ono4NizATiON ANo LOCATION pg.19_40 41_1 c.= ~u-ea m Idaho National EngiDeering Laboratory A6819-4 Idaho Falls, Idaho wonn ,. .oo. mesonoen rise TITLE pixED D ESTIMATED O Evaluation of Selected NRC Open Items , ROM: TO:

Before Plant Fuel Load 04/06/84 11/30/84 OSLIGATION AVAILASILITY PROVIDED SY:

A. THis ORDER  :

0

8. TOTAL Os ORCEms PLACEO PRIOR TO THas OATE mTM TME PERFORMING ORGANaZATiON

'" ^ T' "5Y"* '" ^"C TH E "57

  • U" 'G'T3 ' 7" E 5 6.415,000 Tf!"Nu'"'s***E5^**f0 /E

! C. TOTAL ORDERS TO DATE (TOTALA as8 s 6,415,000 D. AnsOUNT INCLUDED IN "C" APPUCAOLE TO THE "86N NuMSE R" CITED IN THIS ORDER. s 432,000 FINANCIAL FLEXIBILITY:

@ FUNDS WILL NOT BE REPROGRAmeadED SETWEEN FINS. UNE D CONSTITUTES A UMITATION ON OSUGATIONS AuTNQmiztD. .

l Q PUNOS MAY SE REPROGRAasesED NOT TO EXCEED

  • 10% OF FIN LEVEL UP TO SSOK. UNE C CONSTITUTES A UMBTATION ON CeuGATIONS AUTwomi2EO STANDARD TERMS ANO CONQiTIONE PROVIDEO DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERwtSE NOTED.

j ATTACHMENT 3.

THE POLLowsNG ATTACHa4ENTS ARE HEREBY SECURITY:

MADE A PART OF THIS ORDER: @ WORK ON THIS OROER 15 NOT CLAS$1PtED.

C STATEMENT OF WOR K O wCRK ON Twis OmOEM iNv0LvEs CLAssiriED C ADDITIONAL TERMS AND CONDITIONS INFORMATION. NRC FORM 18715 ATTACHED.

C OTwfR REMAnns IMewe tre proooses av numeer and care. and enoucere of one erreened sterement of were medohen ene DOE proceeed i

This order modifies the 50W according to the attachment. Funding and period of l performance are unaffected.

l After acceptance, please send to the NRC Office of Resource Management ATTN: D. Dandois ,

j and provide a copy t,o the Office of Nuclear Reactor Regulation, ATTN: K. McGrath.

A. m 1, (l -AssulN(/ AUTHORITY i ACCEPTING ORGANIZATION i ammc3 top sea us s un e l

./JarrellQi. O s ut '

gn e vitt e A Director, Division of Licensing N:C sORM in is.79, '"

l l

l l

. . _. - .. . _ = _ .. .- -.

i .

Enclosure 2 '

1 ,

Change to SOW [A-6819, Comanche Peak. Project 2]

+

1. ~ Change the Section entitled, " Criteria or' Assessment and Evaluation
Criteria" to:

CRITERIA

1. The licensee's applicable quality control procedures at the plant site.
2. The applicant's Quality Assurance / Quality Control Program. '
3. Applicable industry standards.
4. Direction from NRC lead engineer.
5. Attached Worksheet for review of allegations. [
f e

i i I 1

s t

?

i '

1 I

f i . . ~ . - . - . . . - . - - - _ . _ -

. . _ - - . _ - _ _ . . - . _ _ _ _ - _ __- . . _ _ , - _ . . _ _ - . , _ , - _ _ , _ _ . . -_