From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Hayes B
NRC OFFICE OF INVESTIGATIONS (OI)
Shared Package
ML20136F578 List:
References
FOIA-84-751 NUDOCS 8412100470
Download: ML20136F573 (1)


Text

- -_ -

l

', g' icg o

+  %

j!3,7 .[{

UN:TE D sTA TFs

, NUCL E AR P EGUL AT ORY CO!?!.'!SStON j

'; .; ,/. E v.t !,-.ac.3TOS D C 70L55 k '%,

lf5

%6et %s.: 50-445 and 50 a46 04 El l:

MD':F;'.:U'i FOR: Een B. Hayes, Cirector i Office of Investigations FROM: Darrell G. Eisenhut, Director i Division of Licensing  !

t

) Office of Nuclear Reactor Regulation j

SUFJECT:

! COMAhCHE PEAK STEAM ELECTRIC STATION UNITS 1 AND 2 -

INTIMIDATION i

It has come to my attention that my memorandum to you dated September 25*, 1984, i could be misleading with regard to the staff's position on intimidation at Conanthe Feak and EGAG's scope of work on this issue. .

(See memorandum enclosed.) a t

This memorandum is to clarify that the staff has not taken a position on perva-

sive intimidation at Comanche Peak and tc define the overall task EG&G was con-  !

! tracted to perform. The EG&G effort was not directed at an independent assess- r ment through interviewing individuals etc., and thus does not constitute, by it- i self, 'an overall assessment of the intimidation and harassment issue for the  :

i Comanche Peak project. The EG8G report will be used as one input into our  !

assessment of widespread intimidation at Comanche Peak. .

The EG&G team was ass'embled to investigate and forIn an opinion regarding alle-  :

gations of intimidation of inspection personnel on the part of management at

  • the Comanche Peak power plant. This was to be done by reviewing allegations  ;

of intimidation in depositions, several NRC Office of Investigation Reports, a Comanche Peak Special Review Team Report, survey responses from an applicant  ;

2 conducted survey of its 0A/QC personnel, and other reports and data seen as  !

relevant in naking a judgement concerning charges of management intimi,dation.  !

~

% j The basic question the team was requested to attempt to answer was: Did manage-.  ;

ment by its actions create 'an atmosphere of intimidation for the QA/QC. inspec-  !

tors such that they performed their duties in a way that there is some likeli-hood of impact on the safety and quality of the plant. i I hope this memorandum has provided the necessary clarification. i L

[. --  !

(

arrelld.Eisnut', $ /I Director f Division of Licensing  !

Enclosure:

As stated Office of Nuclear Reactor Regulation

(

cc: H enton, NRR D Hh

}

. - -